Original source · versioned page text
Smp
Original PDF page 12, section 1. The text section number identifies this passage in the reader.
Figure 2.3: Music Model Arrangement for Developed Case
2.5 Water Quality Model Results
The results of the MUSIC model have been summarised in Table 2.6. The results of the MUSIC modelling indicate that the load-based
reduction targets have been achieved with the proposed treatment train. As such, the proposed treatment train will be adopted for the Site.
TABLE 2.6: MUSIC MODEL RESULTS
Parameter Unmitigated Mitigated Reduction Target Compliance
(kg/yr) (kg/yr) Achieved (%) Reduction (%) Achieved
Total Suspended Solids (TSS) 7760 1310 83.1 80 ✓
Total Phosphorus (TP) 14.4 3.53 75.5 60 ✓
Total Nitrogen (TN) 94.9 43.5 54.2 45 ✓
Gross Pollutants (GP) 7760 1310 83.1 90 ✓
73 EUMUNDI - NOOSA ROAD, NOOSAVILLE I BBNE00529_0002_0001-REP-001-0 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.