Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Attachment 5 - Bushfire Hazard Assessment & Management Plan

of 61

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (11.4 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 21, section 1. The text section number identifies this passage in the reader.

Bushfire Hazard Assessment & Management Plan v1                                           NCES REF: J000542
Lot 9 on RP225312 – 100 Cooyar Street, Noosa Heads



4     BUSHFIRE RISK ASSESSMENT

4.1       Methodology
A bushfire risk assessment for the proposed building areas has been prepared generally in
accordance with State Planning Policy – State Interest Guideline – Natural Hazards, Risk and
Resilience (DILGP, 2016) and AS/NZS ISO 31000:2018 – Risk Management Methodology.
The bushfire risk assessment details the likelihood that the proposed development will be
exposed to radiant heat impact considering the proximity to bushfire prone vegetation and
likely bushfire behaviour. Plate 15 illustrates the main bushfire attack mechanisms acting on
buildings.




          Plate 15 – Figure A 5.1 Bushfire attack mechanisms (Planning for Bush Fire Protection, 2006)

According to AS/NZS ISO 31000:2018, a ‘hazard’ is defined as a source of potential harm or
a situation with a potential to cause loss, whereas a ‘risk’ is the chance of something
happening that will have an impact on objectives measured in terms of consequences and
likelihood. The State Planning Policy – State Interest Guideline – Natural Hazards, Risk and
Resilience (DILGP, April 2016) refers to ‘acceptable risk’, ‘tolerable risk’, and ‘intolerable risk’
which are defined below.
           Acceptable risk
                o   A risk that, following an understanding of the likelihood and consequences, is
                    sufficiently low to require no new treatments or actions to reduce risk further.
                    Individuals and society can live with this risk without feeling the necessity to
                    reduce the risks any further.
           Tolerable risk
                o   A risk that, following an understanding of the likelihood and consequences, is
                    low enough to allow the exposure to continue, and at the same time high
                    enough to require new treatments or actions to reduce risk. Society can live
                    with this risk but believe that as much as is reasonably practical should be done
                    to reduce the risks further.
           Intolerable risk
                o   A risk that, following an understanding of the likelihood and consequences, is
                    so high that it requires actions to avoid or reduce the risk. Individuals and



© 2022                                                    20
Log in to download the original file

Attachment 5 - Bushfire Hazard Assessment & Management Plan.pdf · 11.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.