Council archive · source document
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
-
Noosa
Noosa on
on Weyba
Weyba
Revised
Revised Traffic Impact Assessment
Traffic Impact Assessment
as
as Response
Response to to Council’s
Council’s Request
Request
for Further Information
for Further Information
510119
510119
Prepared for
Northbrook Corporation Pty Ltd
September 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of pages 2 to 67 (of 204)
Page 2
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Document Information
Prepared for Northbrook Corporation Pty Ltd
Project Name Revised Traffic Impact Assessment as Response to Council’s Request for Further
Information
File Reference 510119 Lake Weyba TIA 2013 08 19.docx
Job Reference 510119
Date September 2013
Contact Information
Cardno (Qld) Pty Ltd
ABN 57 051 074 992
Level 11 Green Square North Tower
515 St Paul’s Terrace
Locked Bag 4006
Fortitude Valley Qld 4006
Telephone: 07 3369 9822
Facsimile: 07 3369 9722
International: +61 7 3369 9822
[email protected]
www.cardno.com.au
Document Control
Version Date Author Author Reviewer Reviewer
Initials Initials
1.0 13/09/2013 Andrew Johnston/Alice Shi ASJ/AXS Shane Healey SRH
© Cardno 2012. Copyright in the whole and every part of this document belongs to Cardno and may not be used, sold, transferred,
copied or reproduced in whole or in part in any manner or form or in or on any media to any person other than by agreement with
Cardno.
This document is produced by Cardno solely for the benefit and use by the client in accordance with the terms of the engagement.
Cardno does not and shall not assume any responsibility or liability whatsoever to any third party arising out of any use or reliance by
any third party on the content of this document.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd ii
Page 3
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Table of Contents
1 Introduction 1
1.1 Background 1
1.2 Assessment Scope 1
1.3 Development Area Description 1
1.4 References 2
2 Existing Transport Network 3
2.1 Subject Site Locality 3
2.2 Public Transport Network 4
2.3 Active Transport Network 5
2.4 Road and Street Network 6
2.5 Key Intersections 7
3 Development Proposal 10
3.1 Traffic and Transport Opportunities and Constraints 10
3.2 Road Network Connectivity 11
3.3 Proposed Access Strategy 24
4 Internal Road Network 25
4.1 Public Transport 25
4.2 Active Transport Provision 26
4.3 Cross Sections 27
4.4 Intersections 28
4.5 Slow Speed Street Design 29
4.6 Speed Control Devices 29
4.7 Servicing and Emergency Access 30
5 Traffic Operations 32
5.1 Development Traffic Demands 32
5.2 Traffic Assessment Scenarios 34
5.3 Intersection Performance 34
5.4 Travel Time Impacts 43
6 Summary 50
6.1 External Road Network Connectivity 50
6.2 Internal Road Network Preliminary Design 50
6.3 Potential Intersection Operational Impacts 50
6.4 Potential Travel Time Impacts on Walter Hay Drive 50
6.5 Active and Public Transport Connectivity 51
Tables
Table 3-1 Traffic and Transport Scoring Critiria 11
Table 3-2 Transport Rationalisation – Option 1 and 1A 13
Table 3-3 Transport Rationalisation – Options 2 and 2A 15
Table 3-4 Transport Rationalisation – Options 3 and 3A 17
Table 3-5 Transport Rationalisation – Options 4 and 4A 19
Table 3-6 Transport Rationalisation – Option 5 and 5A 21
Table 3-7 Transport Rationalisation – Option 6 and 6A 23
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd iii
Page 4
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Table 4-1 Collector Street Characteristics 29
Table 5-1 Trip Generation Rates 32
Table 5-2 Design Traffic Volumes 32
Table 5-3 Noosa on Weyba Trip Distribution 33
Table 5-4 Eumundi Noosa Road/Emu Mountain Road Roundabout SIDRA Analysis 35
Table 5-5 Emu Mountain Road/Walter Hay Drive/Eumarella Road Roundabout SIDRA Results 36
Table 5-6 Walter Hay Drive/Site Access Intersection SIDRA Results 37
Table 5-7 Walter Hay Drive/Noosa Civic Shopping Centre (North) Access Roundabout SIDRA Results 38
Table 5-8 Walter Hay Drive/Eenie Creek Road Existing Roundabout SIDRA Results 39
Table 5-9 Walter Hay Drive/Eenie Creek Road Mitigated Roundabout SIDRA Results 40
Table 5-10 Summary of Intersection Performance Pre and Post Development 41
Table 5-11 Walter Hay Drive/Noosa Civic South Entrance (Stage 3) 42
Table 5-12 Travel Time Delay – Walter Hay Drive 2018 Year of Opening 46
Table 5-13 Travel Time Delay – Walter Hay Drive 2028 Design Horizon 47
Figures
Figure 2-1 Noosa on Weyba Location Plan 3
Figure 2-2 Existing Public Transport Route 4
Figure 2-3 SRC Existing Future Cycle Network 5
Figure 2-4 Aerial View of Eumundi Noosa Road/Emu Mountain Road Source: nearmap.com 7
Figure 2-5 Emu Mountain Road/Walter Hay Drive/Eumarella Drive Intersection Source: nearmap.com 7
Figure 2-6 Aerial View of Walter Hay Drive/Noosa Civic (North) Roundabout Source: nearmap.com 8
Figure 2-7 Aerial View of the Walter Hay Drive/Noosa Civic (South) Roundabout Source: nearmap.com 8
Figure 2-8 Aerial View of the Walter Hay Drive/Eenie Creek Road Roundabout Source: nearmap.com 9
Figure 3-1 Transport Planning Constraints/Opportunities 10
Figure 3-2 Access Option 1 12
Figure 3-3 Access Option 2 14
Figure 3-4 Access Option 3 16
Figure 3-5 Access Option 4 18
Figure 3-6 Access Option 5 20
Figure 3-7 Access Option 5 22
Figure 4-1 Indicative Public Transport Provision 26
Figure 4-2 Active Transport Strategy 27
Figure 4-3 Internal Intersections 28
Figure 4-4 Potential Speed Control Treatments – Tidswell Road 30
Figure 5-1 Eumundi-Noosa Road/Emu Mountain Roundabout Layout 35
Figure 5-2 Emu Mountain Road/Walter Hay Drive/Eumarella Road Roundabout Layout 36
Figure 5-3 Proposed Site Access Roundabout Layout 37
Figure 5-4 Walter Hay Drive/Noosa Civic Access Roundabout Layout 38
Figure 5-5 Walter Hay Drive/Eenie Creek Road Existing Roundabout Layout 39
Figure 5-6 Walter Hay Drive/Eenie Creek Road Mitigated Roundabout Layout 40
Figure 5-7 Walter Hay Drive/ Noosa Civic Southern Access 42
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd iv
Page 5
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Figure 5-8 Travel Time Assessment Routes 43
Figure 5-9 Overall Journey Comparison 44
Figure 5-10 Travel Time Assessment Methodology 45
Figure 5-11 2028 Travel Time Impact – Walter Hay Drive – Average Journey of AM and PM Peak Hours 46
Figure 5-12 Travel Time Comparison – Average Journey of AM and PM Peak Hours 48
Figure 5-13 Proportionate Benefit of Using Walter Hay Drive Over Eumundi-Noosa Road 49
Appendices
Appendix A Council RFI Items Index
Appendix B Noosa on Weyba Development Plan
Appendix C Traffic Counts
Appendix D Trip Generation and Distribution
Appendix E Detailed SIDRA Analysis
Appendix F Travel Time Survey
Appendix G Access Options Assessment
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd v
Page 6
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
1 Introduction
1.1 Background
Cardno was commissioned by Northbrook Pty Ltd to produce a transport impact assessment for inclusion in
the development application for a residential subdivision to the south of Noosaville, near Lake Weyba.
Subsequent to submission of the development application, Council responded to the applicant with a request
for further information (RFI) dated 28 February 2013. This revised TIA has been produced to respond to the
traffic and transport items included in the RFI. A copy of these RFI items is included at Appendix A.
1.2 Assessment Scope
In addition to the assessment scope outlined in the original TIA dated November 2012, this revision includes
the following:
> Further investigation of the access strategy for the proposed Noosa on Weyba site that reflects
contemporary road hierarchy and design standards
> Detailed review of the pedestrian and cycle connections provided by the development
> Further assessment of the proposed public transport options for the development
> Further review of the internal road network design to ensure the road layout conforms to Sunshine
Coast Regional Council (SCRC or Council) development guidelines and standards as well as
industry best practice. Suitable road verge and pavement cross-sections have been identified
according to internal traffic volumes and road hierarchy classifications
> Review of relevant State and Council guidelines to ensure that all traffic engineering criteria are
adequately addressed
> Revision of intersection assessment scenarios in accordance with Council’s request, with the
estimation of future operating capacities of the impacted network undertaken with the SIDRA
Intersection software package. The determination of any potential road and intersection upgrades
have been based upon the software results
> Development of a road design proposal which considers the potential impact on the sensitive
environment within and surrounding the site
1.3 Development Area Description
The subject site is surrounded by National Park, Noosa Wildlife Refuge and an adjoining private Wildlife
Refuge Resort development, and in response to this, the majority of the development site will be preserved
as forest park. The site has been granted Biodiversity Development Offset Area (BDOA) status by the
Department of Infrastructure and Planning (DIP) because of the commitment to protecting koala habitat in
perpetuity by dedicating 139.5ha of land to the state to expand the Noosa National Park (known as the Send
land) thus facilitating connectivity between the two separate parts of the national park. This in turn allows the
applicant to submit a development application on the lower value sections of land known as the Receive
Land.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 1
Page 7
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
1.4 References
In preparing this report the following background materials/reference documents have been reviewed:
> Austroads: Guide to Road Design Part 4A: Unsignalised and Signalised Intersections
> Department of Transport and Main Roads: Guidelines for Assessment of Road Impacts of
Developments
> Department of Transport and Main Roads: Road Planning and Design Manual Chapter 13:
Intersections at Grade
> Department of Transport and Main Roads: Preconstruction Processes Manual 2005
> Roads and Traffic Authority: Guide to Traffic Generating Developments
> Institute of Transportation Engineers Trip Generation Manual
> Council planning schemes and policies (including Noosa Shire & Maroochy Plans)
> Institute of Municipal Engineering Australia Queensland Division: Queensland Streets
> Institute of Public Works Engineering Australia Queensland Division: Complete Streets: Guidelines
for Urban Street Design
> Western Australian Department of Planning and Infrastructure: Liveable Neighbourhoods: A
Western Australian Government Sustainable Cities Initiative
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 2
Page 8
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
2 Existing Transport Network
2.1 Subject Site Locality
The proposed development site is located south of Noosaville, and is bound to the east by Lake Weyba, to
the west by rural residential parcels and Noosa Par 3 Gold Club, to the north and south by the Noosa Wildlife
Refuge and Eco Tourism Resort. Walter Hay Drive intersects the development site.
The eastern portion of the development site is comprised of lots 11 and 12 on RP893393 and a portion of lot
53 SP163571, and the western portion is comprised of lot 53 SP163571, and lot 2 on SP179590. This
includes the BDOA Send and Receive land. Figure 2-1 depicts the development site locality.
Figure 2-1 Noosa on Weyba Location Plan
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 3
Page 9
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
2.2 Public Transport Network
Existing public transport in the vicinity of the subject development site is limited to one bus service operated
by Sunbus. Sunbus Route 622 traverses the development site along Walter Hay Drive.
This service runs on an hourly frequency throughout the day (6:00am to 7:00pm on weekdays, 7:00am to
6:00pm on weekends and public holidays) providing connections between the suburbs of Noosa, Peregian
Springs, Coolum Beach, Marcoola, Pacific Paradise, Bli Bli and Maroochydore. The existing bus route is
illustrated in Figure 2-2.
Figure 2-2 Existing Public Transport Route
Route 622
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 4
Page 10
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
2.3 Active Transport Network
Existing active transport infrastructure in the vicinity of the development site comprises a network of on road
cycle lanes and off road pathways. Adjacent to the site, Walter Hay Drive incorporates on road cycle lanes
on both sides of the alignment which connect to local on street facilities around the Noosa Civic Shopping
Centre.
From a development perspective, these existing routes provide a framework for further connectivity to be
achieved to future residential but also to Lake Weyba and to integrate with potential longer term east-west
routes which are currently absent from the network planning.
An extract from the Sunshine Coast Regional Council’s existing and future cycle network is provided at
Figure 2-3.
Figure 2-3 SRC Existing Future Cycle Network
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 5
Page 11
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
2.4 Road and Street Network
2.4.1 Walter Hay Drive
Walter Hay Drive provides a connection between Eumundi-Noosa Road and Eenie Creek Road to the north
and to the Sunshine Motorway south of the site. Walter Hay Drive has a two lane rural standard formation in
the north-south section immediately adjacent to the site but widens to four lanes further north in the sections
adjacent to the Noosa Civic Shopping Centre. On road cycle lanes exist along the extent.
The function of Walter Hay Drive is not formally defined within the Maroochy Planning Scheme however it is
reasonable to define it as an Arterial or Sub Arterial route given the longer distance connectivity it facilitates.
Eumundi-Noosa Road is clearly the highest order traffic carrying route which runs parallel and to the west of
Walter Hay Drive. It is a strategic Arterial road that connects Noosa to the Highway network.
Intersection counts undertaken on Walter Hay Drive in March 2012 identify that existing, two way daily traffic
volumes range between 9,500-13,000 vehicles per day (vpd).
The posted speed limit on Walter Hay Drive in the built up northern section between Eumundi-Noosa Road
and the Noosa Civic Shopping Centre is 60km/h, increasing to 100km/h between the southern Noosa Civic
access, and the Emu Mountain Road intersection.
2.4.2 Emu Mountain Road
Emu Mountain Road is under the jurisdiction of the Department of Transport and Main Roads (DTMR). It
forms the major north-south link between Noosa and the remainder of the Sunshine Coast. Under DTMR’s
classification system Emu Mountain Road is designated a state controlled regional road.
The cross section of Emu Mountain Road generally comprises a two lane rural highway formation with wide
paved shoulders enabling on road cycle usage.
The posted speed limit is 100km/h to the south of Walter Hay Drive.
2.4.3 Eumundi-Noosa Road
Eumundi-Noosa Road is under the jurisdiction of the Department of Transport and Main Roads (DTMR). It
forms the major north-south link between Noosa and the Bruce Highway.
Under DTMR’s classification system Eumundi-Noosa Road is designated a state controlled regional road.
The cross section of Eumundi-Noosa Road is generally two lanes with a posted speed limit of 100km/h,
reducing to 60km/h at roundabouts.
2.4.4 Hollett Road
Hollett Road is under the jurisdiction of the Sunshine Coast Regional Council. It has been split by the
construction of Walter Hay Drive. The western side is a narrow unsealed road extending east from Eumundi-
Noosa Road, towards Walter Hay Drive. The eastern side continues towards the intersection of Hollett and
Tidswell Road.
2.4.5 Tidswell Road
Tidswell Road is under the jurisdiction of the Sunshine Coast Regional Council. It is a narrow unsealed road
extending north-east from Eumarella Road, before intersecting with Hollett Road. Tidswell Road is the
existing access road to the eastern portion of the development site.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 6
Page 12
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
2.5 Key Intersections
2.5.1 Eumundi-Noosa Road/Emu Mountain Road Intersection
Figure 2-4 Aerial View of Eumundi Noosa Road/Emu Mountain Road Source: nearmap.com
The Eumundi Noosa
Road/Emu Mountain Road
intersection represents the
end of the Sunshine Coast
Motorway and incorporates
the east-west alignment of
Emu Mountain Road
intersecting with Eumundi-
Noosa Road running north-
south.
The junction is controlled by
a large dual circulating lane
roundabout and
incorporates advance
reverse curves on the
approaches to control traffic
speeds. Figure 2-4
illustrates an aerial image of
the existing intersection
formation.
2.5.2 Emu Mountain Road/Walter Hay Drive/Eumarella Drive Intersection
Figure 2-5 Emu Mountain Road/Walter Hay Drive/Eumarella Drive Intersection Source: nearmap.com
Emu Mountain Road/Walter
Hay Drive/Eumarella Road
intersection is a DTMR
controlled roundabout is
located just over 3
kilometres south of the
Walter Hay Drive/Noosa
Civic Southern Access
intersection, and represents
the terminating intersection
of Walter Hay Drive. It
provides access to the
Sunshine Coast Motorway
on the south leg, Weyba
Downs Residential Estate to
the east on Eumarella
Drive, and Emu-Mountain
Road to the west.
It is controlled by a large
dual circulating lane roundabout and incorporates advance reverse curves on the approaches to control
traffic speeds. Figure 2-5 illustrates an aerial image of the existing intersection formation.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 7
Page 13
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
2.5.3 Walter Hay Drive/Noosa Civic Shopping Centre (North)
Figure 2-6 Aerial View of Walter Hay Drive/Noosa Civic (North) Roundabout Source: nearmap.com
The Walter Hay
Drive/Noosa Civic
Shopping Centre access
roundabout was
constructed in 2006 in
conjunction with the Noosa
Civic Shopping Centre and
Walter Hay Drive.
It is located approximately
1km north of the subject
site. The roundabout has a
50m diameter central island
with dual circulating lanes
on the northbound and
southbound direction, these
are hatched out to a single
circulating lane for turning
vehicles. Figure 2-6
presents an aerial image of
the existing intersection
formation.
2.5.4 Walter Hay Drive/Noosa Civic (South)
Figure 2-7 Aerial View of the Walter Hay Drive/Noosa Civic (South) Roundabout Source: nearmap.com
The Walter Hay Drive/Noosa
Civic (South) intersection
was constructed to provide
future access to the planned
expansion of the Noosa Civic
Centre and Business Park.
Walter Hay Drive at this
location generally runs north-
south, with the planned
access to Noosa Civic
forming the western leg.
Planning permission for the
expansion of Noosa Civic
has not proceeded, leaving
the eastern leg blind. Figure
2-7 depicts the existing
intersection formation.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 8
Page 14
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
2.5.5 Walter Hay Drive/Eenie Creek Road
Figure 2-8 Aerial View of the Walter Hay Drive/Eenie Creek Road Roundabout Source: nearmap.com
The Walter Hay Drive/Eenie
Creek Road roundabout
forms a connection between
the two major arterial roads
of Walter Hay Drive and
Eenie Creek Road.
The roundabout has a 75m
diameter central island and
includes dual circulating
lanes on the majority of the
roundabout. Reverse curves
are provided on the
southern and eastern legs to
control traffic speeds. Figure
2-8 demonstrates the
existing intersection form.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 9
Page 15
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
3 Development Proposal
3.1 Traffic and Transport Opportunities and Constraints
In order to identify an appropriate access strategy for the proposed development, first a number of
constraints and opportunities were identified as outlined below and shown graphically on Figure 3-1.
Figure 3-1 Transport Planning Constraints/Opportunities
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 10
Page 16
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
3.2 Road Network Connectivity
3.2.1 Access Option Assessment
As part of the Council RFI, further detail has been requested regarding the assessment of access options for
the site. A copy of the detailed assessment undertaken by Cardno is included at Appendix G of this report.
That assessment considers not only the traffic and transport aspects but also environmental, ecological and
civil constraints associated with each option evaluated.
With regards traffic and transport a set of criteria based on current planning and transportation guidance
along with project experience from Cardno. This criteria was utilised in assessing each of the development
options tested by the design team.
Table 3-1 Traffic and Transport Scoring Critiria
Criteria Description
How easily does this access option provide connectivity between the two sides
Connectivity – Private Vehicles
of the development and provide connectivity to the wider road network
The ability to provide a realistic and suitable layout for public transport with this
Connectivity – Public Transport
access option
The impact that this access option will have on the amenity of the surrounding
Residential Amenity
residential areas and road networks
How conducive the proposed access solution is to encouraging the use of
Connectivity – Pedestrian and Cyclist
Active Travel Modes
A high level estimate of the impact that an access of this type will have on
Delay to Traffic on Walter Hay Drive
traffic capacity of Walter Hay Drive
A total of 12 options for achieving access were investigated comprising six primary options and a further six
sub-options. The traffic and transport aspects relevant to each option are discussed in the following sections.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 11
Page 17
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
3.2.2 Option 1: Extension of Hollett Road to Noosa-Eumundi Road and extension of Tidswell
Road to Eumarella Road
The arrangement for Option 1 is outlined on Figure 3-2. Option 1 involves using the existing road network
and as such requires the least modification. The development areas to the west of Walter Hay Drive will be
accessed via Hollett Road which connects onto Eumundi-Noosa Road. The eastern parcels will be accessed
by Tidswell Road, which joins the external road network via Eumarella Road to the south. It is noted that
there will be no direct access to Walter Hay Drive with this option. Substantial upgrading of both Hollett Road
and Tidswell Road would be required. The associated advantages and disadvantages are listed in Table 3-1.
Figure 3-2 Access Option 1
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 12
Page 18
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Table 3-2 Transport Rationalisation – Option 1 and 1A
Option 1 Option 1A
Advantages Disadvantages Advantages Disadvantages
Limited delay for traffic No direct access to Limited delay for traffic No direct access to
on Walter Hay Drive as Walter Hay Drive, all on Walter Hay Drive as Walter Hay Drive, all
there is no direct access to the external there is no direct access to the external
connection for the network is provided via connection for the network is provided via
development traffic extension of Hollett development traffic extension of Hollett
Road and Tidswell Road Road and Tidswell Road
Opportunity for No viable public Opportunity for Requires construction of
pedestrian and cycle transport service pedestrian and cycle the upgrade of the
facilities connecting both possible as there is no facilities connecting both underpass and
sides of the connection across sides of the connecting links
development Walter Hay Drive, would development
require two services
Both sides of the Good internal No viable public
development are connection for residents transport service
significantly isolated travelling between the possible as there is no
two sides of Walter Hay connection across
Drive Walter Hay Drive, would
require two services
Significant compromise Both sides of the
for existing residents development are
due to the limited significantly isolated
options for development from the external
traffic to bypass network
properties
Significant compromise
for existing residents
due to the limited
options for development
traffic to bypass
properties
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 13
Page 19
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
3.2.3 Option 2: Partial left in/left out intersection with Walter Hay Drive and extension of
Tidwell Road to Eumarella Road
The arrangement for Option 2 is outlined on Figure 3-3. Option 2 proposes to include connection to Walter
Hay Drive from the internal roads via left-in, left-out movements. In comparison to Option 1, this option
provides increased connectivity to Walter Hay Drive. However, given the restricted movements, not many
residents would choose to use the Walter Hay Drive accesses and would still use Hollett Road and Tidswell
Road. The associated advantages and disadvantages are listed in Table 3-2.
Figure 3-3 Access Option 2
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 14
Page 20
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Table 3-3 Transport Rationalisation – Options 2 and 2A
Option 2 Option 2A
Advantages Disadvantages Advantages Disadvantages
Minimised delay for No connectivity between Minimised delay for Requires construction of
traffic on Walter Hay the two sides of the traffic on Walter Hay the upgrade of the
Drive given the partial development Drive given the partial underpass and
access for the access for the connecting links
development traffic development traffic
Opportunity for Partial access to Walter Opportunity for Partial access to Walter
pedestrian and cycle Hay Drive limits the pedestrian and cycle Hay Drive limits the
facilities connecting both accessibility options for facilities connecting both accessibility options for
sides of the residents, diverting sides of the residents, diverting
development vehicles to use Hollett development vehicles to use Hollett
Road and Tidswell Road Road and Tidswell Road
Results in longer than Good internal Results in longer than
necessary trips by connection for residents necessary trips by
forcing traffic to use travelling between the forcing traffic to use
adjacent roundabouts two sides of Walter Hay adjacent roundabouts
on Walter Hay Drive to Drive on Walter Hay Drive to
turn right in or out of the turn right in or out of the
development development
Limited options for Improved public
public transport services transport amenity with
as it would need to be in the ability for routes to
one direction with service both sides
turnaround on the
western side and
significant dead end
running
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 15
Page 21
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
3.2.4 Option 3: Staggered crossroad intersection with Walter Hay Drive and extension of
Tidswell Road to Eumarella Road
The arrangement for Option 3 is outlined on Figure 3-4. Option 3 uses staggered intersections, providing
access from both eastern and western sides of the development to Walter Hay Drive. However, a direct
connection between the two sides is not provided. A link to Eumarella Road via the Tidswell Road road
reserve would be provided, but no link would be provided to Eumundi-Noosa Road via Hollett Road. The
associated advantages and disadvantages are listed in Table 3-3.
Figure 3-4 Access Option 3
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 16
Page 22
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Table 3-4 Transport Rationalisation – Options 3 and 3A
Option 3 Option 3A
Advantages Disadvantages Advantages Disadvantages
Full access for both Some delay for traffic on Full access for both Requires construction of
sites to Walter Hay Walter Hay Drive from sites to Walter Hay the upgrade of the
Drive vehicles entering and Drive underpass and
exiting at the two connecting links
accesses
Opportunity for Public transport services Full connectivity for both Some delay for traffic on
pedestrian and cycle will require turnaround sites via the underpass Walter Hay Drive from
facilities connecting both movements to fully vehicles entering and
sides of the service both sides of the exiting at the two
development development accesses
Opens up opportunities Opportunity for
for public transport pedestrian and cycle
service improvements facilities connecting both
based upon reasonable sides of the
extensions to existing development
services
Facilitates east-west Opens up opportunities
connectivity across for public transport
Walter Hay Drive service improvements
although this may be based upon reasonable
counter-intuitive extensions to existing
services
Allows for convenient Allows for convenient
connectivity to the connectivity to the
broader road network broader road network
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 17
Page 23
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
3.2.5 Option 4: Full roundabout intersection with Walter Hay Drive without extension of
Tidswell Road to Eumarella Road
The arrangement for Option 4 is outlined on Figure 3-5. Option 4 presents the same solution as Option 5,
with a roundabout providing access to Walter Hay Drive from both sides of the development, however
access to the south via Tidswell Road has been removed. The associated advantages and disadvantages
are listed in Table 3-4.
Figure 3-5 Access Option 4
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 18
Page 24
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Table 3-5 Transport Rationalisation – Options 4 and 4A
Option 4 Option 4A
Advantages Disadvantages Advantages Disadvantages
Allows for convenient All lots on the eastern Allows for convenient All lots on the eastern
connectivity to the side are have access connectivity to the side are have access
broader road network limited to one location, broader road network limited to one location,
given the large number given the large number
of dwellings this may of dwellings this may
cause congestion cause congestion
Opportunity for Public transport could Full connectivity for both Some delay for traffic on
pedestrian and cycle only serve the sites via the underpass Walter Hay Drive from
facilities connecting both development via two the addition of the
sides of the dead end catchments. roundabout
development This does not allow for
sufficient public
transport connectivity
Improved connectivity Some delay for traffic on Opportunity for Public transport services
between development Walter Hay Drive from pedestrian and cycle will require turnaround
areas, facilitating east- the addition of the facilities connecting both movements to fully
west connectivity across roundabout sides of the service both sides of the
Walter Hay Drive development development as no
extension via Tidswell
Road is provided
Alternative north-south Requires construction of
route for pedestrians the upgrade of the
and cyclists via Tidswell underpass and
Road is not provided, connecting links
forcing users to travel
along Walter Hay Drive
Alternative north-south
route for pedestrians
and cyclists via Tidswell
Road is not provided,
forcing users to travel
along Walter Hay Drive
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 19
Page 25
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
3.2.6 Option 5: Full roundabout intersection with Walter Hay Drive and extension of Tidswell
Road to Eumarella Road
The arrangement for Option 5 is outlined on Figure 3-6. The roundabout connects both sides of the
development and provides all movements access on Walter Hay Drive. The associated advantages and
disadvantages are listed in Table 3-5. Option 5A, indicated by the dotted line, incorporates a connecting road
underpass between Hollett Road and Tidswell Road. This link would connect the eastern and western
development parcels.
Figure 3-6 Access Option 5
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 20
Page 26
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Table 3-6 Transport Rationalisation – Option 5 and 5A
Option 5 Option 5A
Advantages Disadvantages Advantages Disadvantages
Improved connectivity Requires construction of Quick connection to Requires construction of
between development significant intersection external road network at significant intersection
areas, facilitating east- on Walter Hay Drive and Walter Hay Drive on Walter Hay Drive and
west connectivity across road extension along road extension along
Walter Hay Drive Tidswell Road Tidswell Road in
addition to the upgrade
of the underpass and
connecting links
Opens up opportunities Some additional delay Opens up opportunities Some additional delay
for public transport to through movements for public transport to through movements
service improvements on Walter Hay Drive service improvements on Walter Hay Drive
based upon reasonable based upon reasonable
extensions to existing extensions to existing
services services
Increasing public Public transport services Increasing public Turnaround movement
transport amenity for will require turnaround transport amenity for required for public
existing residents along movements to fully existing residents along transport servicing the
Eumarella Road service the both sides of Eumarella Road eastern side of the
the development development
Opportunity for Access provided for
pedestrian and cycle both sides of the
facilities connecting both development with little
sides of the impact on existing
development residents
Shares the traffic Opportunity for
loading thereby pedestrian and cycle
minimising the facilities connecting both
concentrated impacts sides of the
and allowing a balanced development
approach to road
construction
Maximises the Shares the traffic
connectivity achieved to loading thereby
the broader road minimising the
network concentrated impacts
and allowing a balanced
approach to road
construction
Maximises the
connectivity achieved to
the broader road
network
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 21
Page 27
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
3.2.7 Option 6: Full roundabout intersection with Walter Hay Drive, extension of Tidswell Road
to Eumarella Road and private access road from Hollett Road
The arrangement for Option 6 is outlined on Figure 3-6. As with Option 5, the roundabout connects both
sides of the development and provides all movements access on Walter Hay Drive. The associated
advantages and disadvantages are listed in Table 3-6. Option 6A, indicated by the blue dotted line,
incorporates a connecting road underpass between Hollett Road and Tidswell Road. This link would connect
the eastern and western development parcels.
Figure 3-7 Access Option 5
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 22
Page 28
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Table 3-7 Transport Rationalisation – Option 6 and 6A
Option 6 Option 6A
Advantages Disadvantages Advantages Disadvantages
Improved connectivity Requires construction of Quick connection to Requires construction of
between development significant intersection external road network at significant intersection
areas, facilitating east- on Walter Hay Drive and Walter Hay Drive on Walter Hay Drive and
west connectivity across road extension along road extension along
Walter Hay Drive Tidswell Road Tidswell Road in
addition to the upgrade
of the underpass and
connecting links
Opens up opportunities Some additional delay Opens up opportunities Some additional delay
for public transport to through movements for public transport to through movements
service improvements on Walter Hay Drive service improvements on Walter Hay Drive
based upon reasonable based upon reasonable
extensions to existing extensions to existing
services services
Increasing public Public transport services Increasing public Turnaround movement
transport amenity for will require turnaround transport amenity for required for public
existing residents along movements to fully existing residents along transport servicing the
Eumarella Road service the both sides of Eumarella Road eastern side of the
the development development
Opportunity for Access provided for
pedestrian and cycle both sides of the
facilities connecting both development with little
sides of the impact on existing
development residents
Shares the traffic Opportunity for
loading thereby pedestrian and cycle
minimising the facilities connecting both
concentrated impacts sides of the
and allowing a balanced development
approach to road
construction
Maximises the Shares the traffic
connectivity achieved to loading thereby
the broader road minimising the
network concentrated impacts
and allowing a balanced
approach to road
construction
Maximises the
connectivity achieved to
the broader road
network
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 23
Page 29
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
3.3 Proposed Access Strategy
3.3.1 Holistic Report Outcomes Discussion
3.3.1.1 Preferred Traffic and Transport Option
From a traffic and transport perspective the optimum access strategy was found to be a tie between options
5A and 6A. These options shared the following elements to their access strategies:
> Roundabout access to Walter Hay Drive
> Road access to Tidswell Road
> Underpass connecting the east and west of the development under Walter Hay Drive.
However, due to engineering costs and ecological constraints the Walter Hay Drive underpass was not
considered viable by the design team.
3.3.1.2 Best Holistic Scoring Option
The design option that was considered best from an overall (Transport + Ecological + Civil) scoring
perspective was Option 4. This was not the highest performing from a Transport perspective, but considered
the best when considering the environment. The key design elements of this strategy are as follows:
> Roundabout access to Walter Hay Drive
> No access to Tidswell Road
> No underpass connecting the east and west of the development under Walter Hay Drive.
This option was rejected on traffic and transport grounds for the following reasons:
> The inability of the option to deliver any sort of meaningful public transport accessibility
> The lack of connectivity between Noosa on Weyba and the Weyba Downs Development to the
south
> The lack of active travel connectivity to the south of the development.
3.3.1.3 Design Masterplan Option
Given the issues with the options highlighted above it was considered that the option which scored best but
did not have any major design flaws was Option 6. This option had the following access elements:
> Roundabout access to Walter Hay Drive
> Road access to Tidswell Road
> No underpass connecting the east and west of the development under Walter Hay Drive.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 24
Page 30
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
4 Internal Road Network
The design of the internal road network will ensure that the proposed public and active transport facilities,
described herein, will be able to be safely accommodated. A major constraint for the road alignment and
cross section design is the environmental sensitivity of the surrounding conservation and national park areas.
As a result, the design will utilise typical SCRC road cross sections where possible, and modified cross
sections where constraints exist. The details of these cross sections are provided within the Engineering
Report.
4.1 Public Transport
4.1.1 Design Considerations
Current planning practice and policies detail a public transport coverage target to ensure that 90% are
located within 400m of a public transport service. This principal has been at the forefront of developing a
precinct layout and local street network plan for the Noosa on Weyba site. It is noted that the internal roads
will be designed to accommodate buses with a minimum lane width of 3.7m.
4.1.2 Route Planning
Given the location of the existing bus route 622 on Walter Hay Drive the most logical strategy for the
provision of public transport to Noosa on Weyba would be to provide an opportunity for this route to divert
through the eastern portion of the development and then south towards Eumarella Road and Weyba Downs.
It is suggested that service frequency would initially remain as currently provided by Route 622.
In order to provide service coverage to a significant proportion of future residents of the site whilst
maintaining an efficient route for public transport operations, two short links with turnaround facilities suitable
for bus traffic (one on the western portion and another heading towards Lake Weyba) have also been
incorporated. Use of these routes would require buses to utilise roundabouts, incorporated within the design,
to provide turn around facilities. Although this is not ideal for public transport operators, this service route
would provide as close to the 90% coverage target as possible.
A continuous route through the western portion of the site is not considered practical given the significant
length of dead running and therefore reducing service significantly. A loop on the eastern side of Walter Hay
Drive would have a significant impact upon the ecology in the area and in particular an impact on koala
movement zones.
Figure 4-1 illustrates the potential bus routing revisions through the development site.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 25
Page 31
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Figure 4-1 Indicative Public Transport Provision
4.2 Active Transport Provision
The private development streets within Noosa on Weyba will be designed to encourage low travel speeds
(<50km/h) for the purposes of community safety and environmental approach. The added benefit of this
approach is that internal streets can comfortably accommodate active transport modes.
A network of pedestrian and cycle routes are proposed within the development allowing access to key
activity nodes including the lake, retail precinct and external pedestrian/cycle infrastructure. The intent of this
high quality connectivity plan is to encourage the use of active transport modes for local trips. At this
preliminary stage of the design process, the level of detail provided with an access and mobility plan is not
considered to be appropriate. As such, this detail will be provided at the Detailed Application stage.
It is intended that a dedicated pedestrian and cycle route be provided along the eastern high road as shown
on Figure 4-2, thus providing connection to the external cycle network along Walter Hay Drive and the
western side of the development. These active transport connections are only indicative of a potential
network, and the eventual detailed design may differ.
In addition these pedestrian/cycle linkages could also be utilised to provide connections north and south of
the development to the new areas of national park being created.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 26
Page 32
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Figure 4-2 Active Transport Strategy
The preliminary pedestrian and cyclist network proposed on the Vee Design Map 1.7 Open Space, Road and
Mobility (Pedestrian and Cycle) indicates that there will be extensive off road paths catering to pedestrian
desire lines connecting residents to the local collector roads and between the two sides of the development.
As for paths leading to external areas, the proposed network provides connections east to Lake Weyba,
south along Tidswell Road and west along Hollett Road towards Eumundi-Noosa Road.
These pedestrian pathways are considered appropriate for an urban standard and where off road cycle
facilities are proposed to extend through the development, along collector streets where higher traffic
volumes are expected, will be shared paths. On road cycling will be permitted for the lower order streets,
where it is expected that traffic volumes will be sufficiently low to allow for the road to be shared between
vehicles, cyclists and pedestrians.
4.3 Cross Sections
Where sufficient area is available, the SCRC typical cross-sections have been utilised. In areas of ecological
sensitivity, modified typical sections have been utilised to reduce the extent of clearing as the conservation of
existing green space is considered the priority where possible. The road types utilised and the location of
these road types is outlined in more detail within the Noosa on Weyba Engineering Report, which was
produced by Cardno.
As such, in accordance with the Road Planning and Design Manual (RPDM), the desirable lane width for bus
carrying routes is 3.7m which provides 7.4m wide carriageways in addition to 1m wide cycle lanes. Where
not constrained by conservation areas, this width has been ensured for the collector roads where the bus
service diversion has been proposed.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 27
Page 33
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
4.4 Intersections
Although more detail will be provided in a future Development Application, based upon the road network and
development proposals we envisage the following intersections, shown on Figure 4-3.
Figure 4-3 Internal Intersections
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 28
Page 34
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
4.5 Slow Speed Street Design
A number of residential road design guidelines have been consulted in determining a suitable posted speed
for the internal collector roads. The following table identifies the various recommended speed limits for the
collector streets or their equivalent.
Table 4-1 Collector Street Characteristics
Collector Street
Street Type Recommended
Guideline Carriageway Width Volumes
Speed
7.5m including
Queensland Streets Collector street 40 km/h 300 lots (3,000 vpd)
parking
7.0m plus cycle lanes
Complete Streets Living street type 5 50 km/h 3,000vpd
and on-street parking
Noosa Plan Collector Road 60 km/h 11.0m 4,000 vpd
Liveable Neighbourhood 7.0m plus on-street
50 km/h 3,000 vpd
Neighbourhoods (WA) connector parking
In Queensland Streets, it is stated that to design collector streets which provide a reasonable degree of
connectivity is desirable. It recommends ensuring the travel time at low speeds from any lot to the major road
system is minimised, desirably to about 500 to 700m. However, the use of Queensland Streets has been
noted to be for advisory purposes only, and has not been adopted as policy within the Noosa Plan. As such,
the recommendation to provide at most 700m from the furthest lot to a 60km/h speed road is not deemed to
be required or necessary for this development, particularly given the proximity to wildlife corridors.
Importantly, it is noted that there is no mention of a maximum length for slow speed streets within the other
guidelines, which focus on designing for slower speed residential environments through curved road
alignment and restricted spacing between junctions.
4.6 Speed Control Devices
Given the location of the development within a nature conservation area, a high concentration of wildlife is to
be expected by motorists. As such, a traffic management plan has been developed in order to ensure the
smooth coexistence of vehicles and fauna. Two approaches have been investigated in lowering the speed
environment:
> Potential treatments to increase the awareness of wildlife in the area
> The alignment and appropriate speed environment of Tidswell Road
4.6.1 Wildlife Awareness Treatments
The Department of Transport and Main Road’s (TMR) Manual of Uniform Traffic Control Devices (MUTCD)
states that wildlife warning signs should be used to warn road users of the ‘unexpected’ presence of wild
animals on the road which may be a hazard to road users. Given the surrounding environment, it could be
argued that road uses travelling along Tidswell Road would reasonably expect the presence of wild animals
in the area. However, in this instance where there is a high concentration of wildlife, wildlife
warning/awareness signage and line marking is considered warranted. Figure 4-4 indicates the potential
management treatments applicable to the development.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 29
Page 35
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
4.6.2 Tidswell Road/Hollett Road Alignment
Tidswell Road will ultimately function as a collector road within the surrounding road network. It will also
function as a bus route for the development and will be the predominate access from Walter Hay Drive into
the eastern portion of Noosa on Weyba. However, as this collector road passes by the Hollett Road Reserve
it will also pass through an ecologically sensitive area where there is likely to be a high concentration of
wildlife. Therefore, it is recommended that this section be designed to be a relatively low speed environment,
with a posted speed limit of 40km/h. This could be achieved with a relatively tight horizontal alignment and
could provide an entry statement into the development.
Figure 4-4 Potential Speed Control Treatments – Tidswell Road
It is proposed that with these treatments, drivers will be suitably aware of the changed environment and
given the physical constraints of the road, will be required to maintain a speed of 40km/h within the wildlife
sensitive zone.
4.7 Servicing and Emergency Access
4.7.1 Servicing Arrangements
Ownership of the lots in the scheme will be on a basis of community title ownership, with a body corporate
elected to manage the development.
Refuse collection and other servicing requirements for Noosa on Weyba is anticipated to be centralised and
organised by the Body Corporate. Details of this arrangement will be finalised in the detailed design phase,
with adequate provisions for the servicing of the development with respect to swept path, road width and
turning space.
4.7.2 Emergency Access
Should the access roads to the main Walter Hay Drive development roundabout be blocked, emergency
services will be able to gain access to the western portion of the site from Hollett Road, with the eastern
portion of the site accessible via Tidswell Road.
Access between the two sides of the development will be achieved by way of a connection under Walter Hay
Drive from Hollett Road using the existing culvert.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 30
Page 36
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Provision for bushfire access tracks and asset protection zones has been made adjacent those properties
backing onto bushland directly.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 31
Page 37
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
5 Traffic Operations
5.1 Development Traffic Demands
5.1.1 Trip Generation
The traffic demands likely to be generated by the Noosa on Weyba development proposal have been
estimated using standard published trip generation information. Two reference guides have been utilised
being the Department of Transport and Main Roads DTMR Preconstruction Processes Manual (PPM) and
the RTA Guide to Traffic Generating Developments (RTA). Background traffic surveys are provided at
Appendix C.
Table 5-1 below outlines the rates applicable to the proposed Noosa on Weyba Development. The traffic flow
diagrams are provided at Appendix D.
Table 5-1 Trip Generation Rates
Trip Generation Rate
Land Use Source
AM Peak PM Peak Daily Rate
Residential 0.8 vph/dwg 0.8 vph/dwelling 9 vpd/dwelling PPM
Medium Density
0.6 vph/dwg 0.6 vph/dwelling 6 vpd/dwelling PPM
Residential
1.23 vph/100sq.m 12.3 vph/100sq.m 121 vpd/100sq.m
Retail RTA
GFA GFA GFA
Aged Care 0.1 vph/dwg 0.2 vph/dwg 2 vpd/dwelling RTA
The table below summarises the AM, PM and daily demands assuming conventional mode choice. The
overall demand is likely to be in the order of 6,600 vehicles per day.
Table 5-2 Design Traffic Volumes
Development Daily Volumes (vpd) AM Peak (vph) PM Peak (vph)
Land Use Yield
Component Combined In Out In Out
237
Residential 2,133 57 133 133 57
dwellings
Medium
133
Northbrook Density 798 24 56 56 24
dwellings
East Residential
120
Aged Care 240 6 6 12 12
dwellings
Retail 600 sq.m 726 5 2 22 52
262
Residential 2,358 63 147 147 63
dwellings
Medium
24
Hoffman West Density 144 4 10 10 4
dwellings
Residential
100
Aged Care 200 5 5 10 10
dwellings
Total 6,599 164 359 390 222
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 32
Page 38
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
5.1.2 Trip Distribution
The distribution of development traffic to the wider road network has been based upon several factors,
including the location of trip attractors, travel patterns in the Sunshine Coast area and available travel routes
on the network.
With regards the available routes on the network these have been outlined in detail in both Chapters 2 and 3.
Data from the 2006 Census demonstrates that the majority of journeys to work originating in the former
Noosa Shire and Maroochy Shire areas stay within the catchment (77% and 78% respectively). Therefore it
is reasonable to assume that a large proportion of trips from the development will be heading to the areas
close to the development.
Areas that are likely to be attracting development trips include:
> Noosaville
> Noosa Heads
> Tewantin
> Sunrise Beach
> Noosa Civic
> Peregian
> Coolum
> Maroochydore
The predicted distribution of traffic from the development has been proportioned as illustrated in Table 5-3.
Table 5-3 Noosa on Weyba Trip Distribution
Origin/Destination Proportion of Development Traffic
South Via Sunshine Motorway (trips to Maroochydore, Coolum, Peregian etc) 30%
South via Bruce Highway (trips to Brisbane, Morton bay etc 10%
Noosa Via Eenie Creek Road East (trips to Noosa Heads, Sunshine Beach,
20%
Noosaville)
North Via Walter Hay Drive (trips to Noosaville, Tewantin, hinterland) 20%
North via Eenie Creek Road (Trips to Tewantin) 10%
Noosa Civic 10%
To represent a worst case scenario for intersection analysis, it has been assumed that no development traffic
will utilise Hollett Road or Tidswell Road to enter or exit the development. In reality it is likely that a
percentage of trips may utilise Hollett Road or Tidswell Road.
The retail development is convenience in nature and as a result would be provided to serve the needs of the
development for convenience shopping. It is expected that weekly shopping trips made by residents would
occur offsite, which is reflected in the residential trip rates. Therefore, all retail trips were assumed to be
internal originating equally from both sides of Walter Hay Drive.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 33
Page 39
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
5.2 Traffic Assessment Scenarios
The traffic impact of the development is expected to be limited to, and has been assessed for the
intersections of:
> Eumundi Noosa Road/Emu Mountain Road;
> Emu Mountain Road/Walter Hay Drive/Eumarella Road;
> Noosa on Weyba Access/Walter Hay Drive;
> Walter Hay Drive/Noosa Civic Shopping Centre; and
> Walter Hay Drive/Eenie Creek Road.
Each intersection has been analysed for:
> 2012 existing traffic;
> 2018 background traffic;
> 2018 background with complete development traffic volumes;
> 2028 background traffic volumes; and
> 2028 (10 year design horizon) background with complete development traffic volumes.
Existing traffic volumes were derived from traffic counts performed by Austraffic on 22 March 2012. These
have been used for the “2012 existing traffic” analysis scenario. For background traffic in future years (2018
– 2028), the 2012 count data has been factored up linearly at a rate of 3% per annum.
Each intersection has been analysed for the AM peak period of 8:00AM-9:00AM and the PM Peak period of
3:00PM and 4:00PM. These peaks were selected based on 2012 traffic counts.
5.3 Intersection Performance
Each of the study intersections has been analysed for each of the scenarios outlined in section 5.1.1, using
the SIDRA Intersection 5.1 software package. This software package calculates the operation of
intersections based on input parameters, including geometry and traffic volumes. As an output, SIDRA
Intersection 5.1 provides values for the degree of saturation (DOS), queues and delays. The DOS is a
commonly used value, which is essentially a volume to capacity ratio. The typically adopted upper limits for
the DOS, where it is considered that the operation of the intersection is constrained, are:
> unsignalised intersections 0.80
> roundabouts 0.85
> Signalised intersections 0.90
A DOS exceeding these values indicates that the intersection is nearing its operational capacity. Above
these values, users of the intersection are likely to experience unsatisfactory queuing and delays.
The Noosa Plan 2006 contains a desirable maximum standard that roundabouts operate at a degree of
saturation of 0.7 and therefore this threshold has been adopted where possible. However, given it is a
desirable outcome there may be intersections where this is exceeded in the ten (10) year design horizon.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 34
Page 40
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
5.3.1 Eumundi Noosa Road/Emu Mountain Road
The intersection of Eumundi Noosa Road/Emu Mountain Road was assessed in SIDRA Intersection using
the layout shown on Figure 5-1. A summary of the SIDRA analysis is shown in Table 5-4. Detailed SIDRA
analysis results are available at Appendix E.
Figure 5-1 Eumundi-Noosa Road/Emu Mountain Roundabout Layout
Table 5-4 Eumundi Noosa Road/Emu Mountain Road Roundabout SIDRA Analysis
AM Peak PM Peak
Scenarios Delay
th
95 %ile Delay
th
95 %ile
DOS DOS
(sec) Queue (m) (sec) Queue (m)
2012 Traffic Count 0.25 12 11 0.20 13 9
2018 Background Traffic 0.23 13 11 0.23 13 11
2028 Background Traffic 0.38 13 21 0.30 13 15
2018 Background with
0.30 13 15 0.25 13 12
Development Traffic
2028 Background with
0.39 13 22 0.32 13 16
Development Traffic
The analysis suggests that Eumundi Noosa Road/Emu Mountain Road operates well within recognised
capacity limits, as well as operating within the Noosa Plan 2006 desired DOS limits with and without
development traffic to the design horizon.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 35
Page 41
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
5.3.2 Emu Mountain Road/Walter Hay Drive/Eumarella Road
The intersection of Emu Mountain Road/Walter Hay Drive/Eumarella Road was assessed in SIDRA
Intersection using the layout shown on Figure 5-2. A summary of the SIDRA analysis is shown in Table 5-5.
Detailed SIDRA analysis results are available at Appendix E.
Figure 5-2 Emu Mountain Road/Walter Hay Drive/Eumarella Road Roundabout Layout
Table 5-5 Emu Mountain Road/Walter Hay Drive/Eumarella Road Roundabout SIDRA Results
AM Peak PM Peak
Scenarios Delay
th
95 %ile Delay
th
95 %ile
DOS DOS
(sec) Queue (m) (sec) Queue (m)
2012 Traffic Count 0.29 13 14 0.21 12 9
2018 Background Traffic 0.35 13 18 0.25 13 11
2028 Background Traffic 0.45 14 27 0.33 14 15
2018 Background with
0.37 14 20 0.28 13 13
Development Traffic
2028 Background with
0.49 15 30 0.36 14 18
Development Traffic
The analysis suggests that the Emu Mountain Road/Walter Hay Drive/Eumarella Road Roundabout operates
well within recognised capacity limits, as well as operating within the Noosa Plan 2006 desired threshold with
and without development traffic to the design horizon.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 36
Page 42
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
5.3.3 Site Access/Walter Hay Drive
The intersection type selected for the Noosa on Weyba development access is a roundabout. Using a
roundabout as the primary access has the desirable benefit of creating a more cohesive development,
forming a stronger link between the two sides and creating a better sense of community. It also ties in with
the current character of Walter Hay Drive and the goals of the Noosa Plan to create a roundabout based
traffic network. A roundabout would be operationally beneficial, having lower delays than traffic signals, while
maintaining a higher capacity and level of safety than priority intersections.
The roundabout form analysed is shown conceptually on Figure 5-3, with a summary of SIDRA intersection
analysis results shown in Figure 5-6. Detailed SIDRA analysis results are available at Appendix E.
Figure 5-3 Proposed Site Access Roundabout Layout
Table 5-6 Walter Hay Drive/Site Access Intersection SIDRA Results
AM Peak PM Peak
Scenarios Delay
th
95 %ile Delay
th
95 %ile
DOS DOS
(sec) Queue (m) (sec) Queue (m)
2018 Background with
0.54 17 34 0.40 15 21
Development Traffic
2028 Background with
0.67 19 52 0.48 15 27
Development Traffic
The analysis suggests that the proposed layout shown conceptually on Figure 5-3 operates within the
recognised capacity limits and within the Noosa Plan desirable maximum threshold with and without
development traffic to the design horizon.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 37
Page 43
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
5.3.4 Walter Hay Drive/Noosa Shopping Centre
The intersection of Walter Hay Drive/Noosa Civic Shopping Centre access was assessed in SIDRA
Intersection using the layout shown on Figure 5-4. A summary of the SIDRA analysis is shown in Table 5-7.
Detailed SIDRA analysis results are available at Appendix E.
Figure 5-4 Walter Hay Drive/Noosa Civic Access Roundabout Layout
Table 5-7 Walter Hay Drive/Noosa Civic Shopping Centre (North) Access Roundabout SIDRA
Results
AM Peak PM Peak
Scenarios Delay
th
95 %ile Delay
th
95 %ile
DOS DOS
(sec) Queue (m) (sec) Queue (m)
2012 Traffic Count 0.28 13 13 0.18 12 8
2018 Background Traffic 0.34 13 16 0.22 12 10
2028 Background Traffic 0.43 14 23 0.28 13 14
2018 Background with
0.41 13 21 0.29 13 14
Development Traffic
2028 Background with
0.50 14 29 0.35 13 19
Development Traffic
The analysis suggests that the Walter Hay Drive/Noosa Civic Shopping Centre Access Roundabout operates
well within recognised capacity limits, as well as operating within the Noosa Plan 2006 desired thresholds
with and without Noosa on Weyba development traffic to the design horizon.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 38
Page 44
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
5.3.5 Walter Hay Drive/Eenie Creek Road
The intersection of Walter Hay Drive and Eenie Creek Road was assessed in SIDRA using the layout shown
on Figure 5-5. The corresponding results from the analysis are reported in Table 5.
Figure 5-5 Walter Hay Drive/Eenie Creek Road Existing Roundabout Layout
Table 5-8 Walter Hay Drive/Eenie Creek Road Existing Roundabout SIDRA Results
AM Peak PM Peak
Scenarios Delay
th
95 %ile Delay
th
95 %ile
DOS DOS
(sec) Queue (m) (sec) Queue (m)
2012 Traffic Count 0.56 17 31 0.51 15 26
2018 Background Traffic 0.76 22 59 0.68 18 45
2028 Background Traffic 1.18 199 597 1.05 91 311
2018 Background with
0.86 38 93 0.84 25 79
Development Traffic
2028 Background with
1.22 238 792 1.25 252 814
Development Traffic
These results indicate that the existing layout cannot operate within accepted capacity limits in the design
horizon year. As such, a mitigated form is required. The proposed mitigated form is shown on Figure 5-6 with
the corresponding results reported in Table 5-9. It entails adding short lanes on the northern leg and
changing the lane designation on the southern leg to allow for a right turn only lane.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 39
Page 45
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Figure 5-6 Walter Hay Drive/Eenie Creek Road Mitigated Roundabout Layout
Table 5-9 Walter Hay Drive/Eenie Creek Road Mitigated Roundabout SIDRA Results
AM Peak PM Peak
Scenarios Delay
th
95 %ile Delay
th
95 %ile
DOS DOS
(sec) Queue (m) (sec) Queue (m)
2018 Background Traffic 0.46 15 22 0.41 14 18
2028 Background Traffic 0.66 19 45 0.55 15 30
2018 Background with
0.55 16 30 0.47 14 22
Development Traffic
2028 Background with
0.79 23 67 0.62 16 39
Development Traffic
Note: Due to flow balancing, operation of the mitigated layout is an improvement in 2028 post-development in the AM peak.
Although the desired degree of saturation as stated in the Noosa Plan 2006 is exceeded for the 2028 AM
peak ‘with development’ scenario, it has also been stated within the Noosa Plan 2006 that “the intentions
stated in the plan do not create an obligation to supply the infrastructure or than any right exists to expect or
demand the standard of service stated”. It also states that “in circumstances where the desired standard of
service (DSS) may not be achieved, trunk infrastructure will aim to meet the standards to the greatest degree
practicable”.
To improve the degree of saturation (ie. aiming for DOS less than 0.70), the layout would require upgrading
to a three-lane formation, which would incur substantial costs and possible land resumptions, exceeding
practicality. As such, it is suggested that as the proposed mitigation form can operate within generally
accepted capacity limits (ie. DOS ≤ 0.85), it is deemed an appropriate solution for the anticipated 2028 traffic
demands (15 years into the future).
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 40
Page 46
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
5.3.6 Summary of Intersection Analysis
The analysis above has been summarised in Table 5-10 for ease of reference.
Table 5-10 Summary of Intersection Performance Pre and Post Development
2018 Background 2028 Background
2018 Background 2028 Background
with Development with Development
Traffic Traffic
Traffic Traffic
Eumundi Noosa Road/Emu
Within Capacity Within Capacity Within Capacity Within Capacity
Mountain Road
Emu Mountain Road/Walter
Within Capacity Within Capacity Within Capacity Within Capacity
Hay Drive/Eumarella Road
Site Access/Walter Hay Drive Within Capacity Within Capacity Within Capacity Within Capacity
Walter Hay Drive/Noosa Civic
Within Capacity Within Capacity Within Capacity Within Capacity
Shopping Centre
Walter Hay Drive/Eenie Creek Minor mitigations Minor mitigations Minor mitigations
Within Capacity
Road required required required
Eumundi Noosa Road/Emu
Within Capacity Within Capacity Within Capacity Within Capacity
Mountain Road
From the above it is clear that the Noosa on Weyba development traffic can be readily accommodated by the
existing road infrastructure to the 2028 design horizon. The exception to this is the Walter Hay Drive/Eenie
Creek Road intersection which requires minimal mitigation works in order to operate within capacity.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 41
Page 47
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
5.3.7 Walter Hay Drive/Noosa Civic Southern Access – Sensitivity Testing
The roundabout on Walter Hay Drive north of the development site is referred herein as the Noosa Civic
Southern Access currently has a blind leg given that future development of Noosa Civic has not yet
progressed. This intersection has been included as its operation is used in calculations in Section 5.4.
The impact of any expansion to the Noosa Civic Centre has not been included in this assessment given that
at the time of preparation no current approval existed for expansion to the development. The impact of
additional traffic or the intersection operation is outlined in Figure 5-7 below.
Figure 5-7 Walter Hay Drive/ Noosa Civic Southern Access
Table 5-11 Walter Hay Drive/Noosa Civic South Entrance (Stage 3)
Thursday PM Peak Saturday Peak
th th
Scenarios Layout 95 %ile 95 %ile
Delay Delay
DOS Queue DOS Queue
(sec) (sec)
(m) (m)
2022 Background + Noosa
Civic Shopping Centre + Existing 0.37 5 24 0.33 5 21
Stage 2 and 3 expansion
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 42
Page 48
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
5.4 Travel Time Impacts
Following initial discussions with Council and their traffic representative Colin Beard, Council identified that a
primary traffic concern was that the development could prejudice the objective of Walter Hay Drive which
Council identified was to act as an alternative north-south route to Eumundi-Noosa Road. Figure 5-8
indicates the two possible routes assessed. These two routes act as north-south links from Noosa to the rest
of the Sunshine Coast and South East Queensland. It is the intent of this section to establish the impact an
additional intersection would have on Walter Hay Drive journey time, in comparison to that of Noosa-
Eumundi Road.
Figure 5-8 Travel Time Assessment Routes
Source: Map, www.maps.google.com.au
Of particular note was a concern that provision of another intersection on Walter Hay Drive would increase
the route delays such as that the route would not be effective as an active alternative. The following section
will detail the methodology undertaken to estimate the travel time impacts of introducing a roundabout to
Walter Hay Drive.
5.4.2 Assessment Methodology
Council has identified that no transport modelling of the routes exist. Therefore, in order to assess the validity
of these concerns, Cardno agreed a methodology to analyse the current and future operational delays on the
two routes.
It should be noted that these two routes (Walter Hay Drive and Eumundi-Noosa Road) would only be utilised
as sections of a larger route. For example, a driver starts their journey in Caloundra going to Noosa and
chooses one route or the other at this section of the journey. Figure 5-9 highlights this by showing the route
and indicative journey times (estimated from Google Directions) for this example journey.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 43
Page 49
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Figure 5-9 Overall Journey Comparison
Source: Map, www.maps.google.com.au
Travel time surveys were performed for four routes (travelling north and south along two routes) utilising
either Eumundi-Noosa Road, or Walter Hay Drive. The results of this survey are included at Appendix F.
Delay was subsequently simulated using a combination of SIDRA Intersection 5.1 to analyse intersection
delay, and first principals to quantify the delays associated with a change in the posted speed limit. The
steps undertaken to determine the impact of associated delays are outlined on Figure 5-10 which shows that
the additional delays from the 2018 and 2028 volumes have been incorporated.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 44
Page 50
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Figure 5-10 Travel Time Assessment Methodology
5.4.3 Travel Time Impacts on Walter Hay Drive
A summary of the travel time along Walter Hay Drive at the 2028 year is shown on Figure 5-11. It indicates
that of the average journey length from both AM and PM peak hour journey lengths, only 4.3% (14 seconds)
is attributed to the proposed development. This Development Traffic delay comprises the following
components:
> Delay from new site access roundabout
> Delay from speed limit reduction
> Incremental delay from the existing intersections along Walter Hay Drive
It is important to note that the section of road studied will in reality be part of a larger journey. Data from
demographic profilers, .id Population Experts, indicates that of the residents who live within the Noosa
Hinterland, only 36% work within the Noosa Hinterland meaning up to 64% travel outside of the area for
work. This would mean that generally, the proportion of delay experienced from travelling on Walter Hay
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 45
Page 51
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Drive would really be much less when considering the overall delay likely to be experienced for the wider
journey.
Figure 5-11 2028 Travel Time Impact – Walter Hay Drive – Average Journey of AM and PM Peak
Hours
Additional
development
scenario travel time,
2028 Background
14 sec
travel time, 313 sec
The delay components calculated are presented in Table 5-12 and Table 5-13 for the 2018 and 2028
scenarios, respectively.
Table 5-12 Travel Time Delay – Walter Hay Drive 2018 Year of Opening
Delay N/B AM Peak NB PM Peak S/B AM Peak S/B PM Peak
2018 Year of Opening
2012 Surveyed
5 min 9 sec 5 min 13 sec 4 min 55 sec 4 min 57 sec
Travel Time
Noosa Civic
5.1 sec 3.4 sec 3.4 sec 5.1 sec
Roundabout Delay
Additional BG Delay 7.4 sec 4.0 sec 0.5 sec 0.5 sec
2018 BG Travel
5 min 22 sec 5 min 20 sec 4 min 59 sec 5 min 3 sec
Time
Development Access
4.6 sec 5.3 sec 4.2 sec 5.0 sec
Roundabout Delay
Speed Limit
7.5 sec 7.5 sec 7.5 sec 7.5 sec
Reduction Delay
Additional BG+Dev
6.7 sec 4.4 sec 1.0 sec 1.0 sec
Delay
Total Travel Time
5 min 34 sec 5 min 33 sec 5 min 11 sec 5 min 15 sec
with Development
Marginal Delay
attributed to 12 sec 13 sec 12 sec 12 sec
Development
Percentage Change 3.7% 4.1% 4.0% 4.0%
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 46
Page 52
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Table 5-13 Travel Time Delay – Walter Hay Drive 2028 Design Horizon
Delay N/B AM Peak NB PM Peak S/B AM Peak S/B PM Peak
2028 Design Horizon
2012 Surveyed
5 min 9 sec 5 min 13 sec 4 min 55 sec 4 min 57 sec
Travel Time
Noosa Civic
5.1 sec 3.4 sec 3.4 sec 5.1 sec
Roundabout Delay
Additional BG Delay 11.7 sec 6.3 sec 2.4 sec 2.3 sec
2028 BG Travel
5 min 26 sec 5 min 23 sec 5 min 1 sec 5 min 4 sec
Time
Development Access
4.8 sec 5.2 sec 4.1 sec 4.9 sec
Roundabout Delay
Speed Limit
7.5 sec 7.5 sec 7.5 sec 7.5 sec
Reduction Delay
Additional BG+Dev
16.5 sec 7.2 sec 3.2 sec 3.0 sec
Delay
Total Travel Time
5 min 43 sec 5 min 36 sec 5 min 13 sec 5 min 18 sec
with Development
Marginal Delay
attributed to 17 sec 13 sec 12 sec 14 sec
Development
Percentage Change 5.2% 4.0% 4.0% 4.6%
5.4.4 Travel Time Impacts – Route Comparison
When compared to the alternative route using Eumundi-Noosa Road, the route along Walter Hay Drive has a
significantly smaller travel time, even when including the impacts of the development. These calculations
have accounted for expected additional delays on Eumundi-Noosa Road including:
> Delay from the Eumundi-Noosa Road/Emu Mountain Road and Walter Hay Drive/Eenie Creek
Road intersections
> Approximation of the delay at the mid-route intersections, Eumundi-Noosa Road/Beckmans Road
and Eumundi-Noosa Road/Eenie Creek Road, using the average delay of assessed intersections
on Walter Hay Drive – this is likely to be an underestimate
As indicated on Figure 5-12 below, in the 2028 design horizon, in terms of time saved, there will be a 58
second benefit in the background case and 47 second benefit in the development case when using Walter
Hay Drive instead of Eumundi-Noosa Road. This is a difference in journey time of 9 seconds between with
and without development scenarios.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 47
Page 53
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Figure 5-12 Travel Time Comparison – Average Journey of AM and PM Peak Hours
400
58 sec 47 sec
350
300
Total Travel Time (sec)
250
200
371 374
313 327
150
100
50
0
2028 BG 2028 BG+Dev
Walter Hay Drive Eumundi-Noosa Road
Note: the average journey time from both AM and PM peak hour journey times has been reported.
Figure 5-13 presents the proportional benefit of travelling along Walter Hay Drive in comparison to Eumundi-
Noosa Road. When considering the background case, there is an average 15.5% time saving when using
Walter Hay Drive. This compares to an average 12.7% time saving when the development impacts are
included, which is not considered a significant reduction from 15.5%. Hence, the use of Walter Hay Drive as
an alternative north-south link is not likely to be compromised by the proposed development as it will be
perceived as a more efficient route regardless of the development.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 48
Page 54
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Figure 5-13 Proportionate Benefit of Using Walter Hay Drive Over Eumundi-Noosa Road
18.00%
16.00%
Benefit of Walter Hay Drive (%)
14.00%
12.00%
10.00%
8.00%
6.00%
4.00%
2.00%
0.00%
Northbound AM Northbound PM Southbound AM Southbound PM
2028 BG 2028 BG+Dev
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 49
Page 55
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
6 Summary
Cardno has undertaken a detailed traffic impact assessment for the proposed Noosa on Webya
development. The assessment focussed on:
> External road network connectivity
> Internal road network preliminary design
> Potential Intersection operational impacts
> Potential travel time impacts on Walter Hay Drive
> Active and Public Transport Connectivity
Key findings from the assessment are summarised below.
6.1 External Road Network Connectivity
The most effective solution, from a traffic and transport perspective, provides full connectivity to Walter Hay
Drive via a roundabout. A secondary access to Eumarella Road via an extension of Tidswell Road will prove
beneficial in easing traffic on Walter Hay Drive and providing an alternative active transport route.
Importantly, this connection will facilitate a contemporary planning outcome maximising accessibility, sharing
of traffic loads and providing opportunities to expand public transport services to existing and new
developments.
6.2 Internal Road Network Preliminary Design
The predominant constraint in the road design is the extent of the conservation area within the site. In order
to reduce the intrusion on existing wildlife corridors, the alignment has been designed to avoid intrusion into
ecologically sensitive areas.
Speed control management treatments have been recommended in ensuring that slow speeds are
maintained through the wildlife sensitive corridor. These include installing wildlife awareness signage and
pavement markings, in addition to designing the alignment of Tidswell Road to slow vehicles down.
6.3 Potential Intersection Operational Impacts
A detailed intersection operational assessment highlighted that the proposed development would have a
relatively minor impact on the surrounding road network. It was found that the Noosa on Weyba development
traffic could be readily accommodated by the existing road infrastructure in the study area out to a 2028
design horizon. The exception to this is the Walter Hay Drive/Eenie Creek Road intersection which requires
minimal mitigations in order to operate within typically adopted performance thresholds.
6.4 Potential Travel Time Impacts on Walter Hay Drive
Following initial discussions with Council and their traffic representative Colin Beard, Council identified that
their primary traffic concern was that the development could prejudice the objective of Walter Hay Drive
which Council identified was to act as an alternative route to resolve on Eumundi-Noosa Road. Of particular
note was a concern that provision of another intersection on Walter Hay Drive would increase the route
delays such as that the route would not be effective as an active alternative.
A detailed travel time assessment highlighted that the proposed development would have a relatively minor
impact on travel times along Walter Hay Drive. It was found that constructing the Noosa on Weyba
development access on Walter Hay Drive would add on average no more than 14 seconds to the route travel
time from Eumundi-Noosa Road to Eenie Creek Road. This represents in the order of a 4.3% increase in
total travel time, which is in itself not considered significant and if reported relevant to average trip length
would be even less significant.
Additionally, the use of Walter Hay Drive as an alternative route to Eumundi-Noosa Road is not
compromised with the addition of the access roundabout. This is apparent as the travel time between
Eumundi-Noosa Road/Emu Mountain Road and Walter Hay Drive/Eenie Creek Road via Walter Hay Drive
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 50
Page 56
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
remains less than the time taken via Eumundi-Noosa Road, regardless of the development access
intersection. Even so, with the development, Walter Hay Drive presents a 12.7% benefit in terms of time
saved when compared to Eumundi-Noosa Road. Hence, the addition of the development access will not
compromise Council’s intent for Walter Hay Drive.
6.5 Active and Public Transport Connectivity
Current planning practice and policies detail a public transport coverage target to ensure that 90% of
dwellings are located within 400m of a public transport service. This principal has been at the forefront of
developing a precinct layout and local street network plan for the Noosa on Weyba site. Given the location of
an existing bus route on Walter Hay Drive, the recommended strategy for the provision of public transport to
Noosa on Weyba is to provide an opportunity for this route to divert through the eastern portion of the
development and then south towards Eumarella Road and Weyba Downs. Although the need for bus
turnaround and dead end running is less efficient than a design without turnarounds, the 90% dwelling
coverage provided as part of the proposed route diversion is considered more salient.
A network of pedestrian and cycle routes are proposed within the development allowing access to key
activity nodes including the lake, rental precinct and external pedestrian/cycle infrastructure. The intent of
this high quality connectivity plan is to encourage the use of active transport modes for local trips. It is noted
that the active transport network is only in the preliminary stages and a detailed design will be issued as part
of the DA stage.
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 51
Page 57
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Revised Traffic Impact Assessment
as Response to Council’s Request for
Further Information
APPENDIX A
COUNCIL RFI ITEMS INDEX
510119 Cardno August 2013
Prepared for Northbrook Corporation Pty Ltd Page 52
Page 58
Sunshine Coast Regional Council RFI Item Reference in Revised TIA
54 Provide additional detail in regard to the proposed Provided at Section 4.1 and Figure 4-1.
public transport routes to and through the proposed
development. The detail is to include:
(a) The routes through the development site.
(b) The full extent of works necessary along Hollett Road To be provided as part of the detailed
and Tidswell Road to provide for the various vehicle types design process at a later date.
and road users (pedestrians, cyclists etc)
(c) Areas to be set aside for bus stops (including shelters, To be provided as part of the detailed
bike racks etc), set down and turning areas. design process at a later date.
(d) Translink approval to utilise those sections of the To be provided as part of the detailed
routes that are located within proposed common property design process at a later date.
areas.
(e) Provide comment on the delineation between private Refer to Civil Engineering report.
and public infrastructure in regard to public access and
ongoing maintenance responsibilities (roads, paths, car
parking areas, parks etc)
56 Demonstrate that the proposed connections from the Refer to Vee Design Connectivity
proposed development to the external pathway network reporting.
are:
(a) Of a suitable urban standard to service the proposed
development (off-road and on-road only where
applicable).
57 Justify why pathways throughout the development Clarified at Section 4.2.
regularly terminate at roads with no continuation along the
road verge or connectivity to other pathways within the
site.
64 Submit revised plans that provide for at least a 9.4 1m cycle lanes have been provided in
metre wide carriageway (or 5 metre wide carriageways in addition to 7.4m wide running lanes, as
each direction for divided carriageways) on the section of stated in Section 4.3.
the Road 2 – Hollett Road connection currently proposed
as 7.4 metres wide.
65 Submit a revised layout for the proposed development Justification for layout at Section 4.5.
east of Tidswell Road such that any collector street
connecting this development to Tidswell Road is at least
9.4 metres wide and does not have direct lot access for
as far as is necessary such that the furthest lot in the
catchment will be not more than 700 metres travel
distance from the end of this street type.
67 The traffic planning horizon adopted should be ten The traffic assessment has accounted for
years after the completion of the construction in 2018 year of opening and 2028 ten year
accordance with normal practice. design horizon, as explained at Section
5.2
68 Provide assessments for future year operations. Updated intersection analyses at Section
5.3.
69 Provide a comprehensive analysis of access options A brief summary of the access options
which would not necessitate speed limit reductions and analysis is included at Section 3.2, with
intersection delays on Walter Hay Drive. Council officers the comprehensive report included at
would be available to discuss other site access options to Appendix G.
ensure all relevant options are tested, particularly those Analysis of travel time delays is included
which would not add to through traffic travel time on at Section 5.4.
Walter Hay Drive.
Page 59
Sunshine Coast Regional Council RFI Item Reference in Revised TIA 71 Further information is requested in respect of any Justification included at Section 4.1.2. investigations of the feasibility and like frequency of service of such routes, particularly taking account of proposed dead-end routes. 72 Provide the following details: Justification included at Section 4.3. (a) Justification for proposed adoption of cross sections and alignments contrary to Council‘s normal standards, (b) Details of intersections and speed control devices, and Included at Sections 4.4 and 4.6. (c) Speed control mechanisms which adequately address Included at Section 4.5 and 4.6. the issues associated with long journey paths purported to occur at low operating speeds for environmental reasons. As a general rule, it cannot be reasonably expected that motorists will adopt low speeds (40 km/hour) for more than 60 to 90 seconds. Much longer low speed routes are currently proposed. 76 In accordance with Austroads there are concerns over Proposed shared facilities for the the safety to cyclists from the development, as Walter development are shown on the Vee Hay Drive carries very high traffic volumes (9,500-13,000 Design Bicycle Plan. vpd according to Traffic Impact Assessment by Cardno) at very high speeds (80- 100km/h). Austroads suggests that the combination of these high volumes and high speeds warrant segregated cycling facilities (not-on-road facilities). In this regard, please indicate the exact route that will be taken for the segregated facility highlighting any land resumptions that may be necessary and any infrastructure needed to support this, such as underpasses/overpasses and any bridges. 77 Demonstrate how pedestrians and cyclists will be able Proposed shared facilities for the to safely cross all major roads and intersections (including development are shown on the Vee the underpass) impacted upon by the subject Design Bicycle Plan. development, but primarily the multi-lane roundabout on Walter Hay Drive. Details of levels, alignments of approach and departure routes, etc. should be provided. 80 Illustrate how larger vehicles, such as trucks and Roads will be designed to sufficient buses will safely manoeuvre throughout the site in a standards for the appropriate vehicles forward gear, with a specific focus on public transport accessing the development in the buses. detailed design stage. 81 Walter Hay Drive was designed as a limited access Justification provided in Chapter 3 with road with the primary intention to move traffic quickly, further justification included in the Holistic efficiently and safely with no intention for further report which is attached at Appendix G. intersections. Provide justification as to why Council should change its long term road network planning for the area as the development appears to increase the level of risks and likelihood of accidents either between vehicles and/or between vehicles and pedestrians/cyclists. 82 Provide further justification as to why access to the Justification provided in Chapter 3 with eastern portions of the site (i.e. east of Walter Hay Drive further justification included in the Holistic to Precincts 1, 2 and the eastern portion of Precinct 3) report which is attached at Appendix G. cannot be achieved via the existing roundabout at Emu Mountain Road / Walter Hay Drive / Eumarella Road via Tidwell Road
Page 60
Sunshine Coast Regional Council RFI Item Reference in Revised TIA
83 Provide further justification as to why access to the The Vee Design Bicycle Plan indicates
western portions of the site (i.e. west of Walter Hay Drive that a shared pedestrian/bicycle
to the western portion of Precinct 3) cannot be achieved connection will extend along Hollett Road
via Eumundi Noosa Road and Old Hollett Road, as to Eumundi-Noosa Road. Justification for
Council is not satisfied with the present proposal and not providing vehicle access is provided
believes a better Active Transport outcome would be at Section 3.2.2, , and in Section 4 of the
achieved by not providing direct vehicle access into the Holistic Report, which is attached at
site as proposed. To this end, walking or cycling becomes Appendix G.
more viable if the trip length is shorter than motorised
vehicle trips.
84 Old Hollett Road presently contains an underpass Justification provided at Section 3.3.1.1.
under Walter Hay Drive that connects to Tidswell Road. The Holistic Report, which is attached at
Provide justification why this connection should not be Appendix G, also provides justification
enhanced to provide the major road connection between throughout, including Sections 5.2 and
the eastern and western portions of the development site, 5.3.
as opposed to direct access to the site off Walter Hay
Drive.
85 Walter Hay Drive has been considered for future The duplication of Walter Hay Drive has
duplication, demonstrate how the development will take not been included in any planning
this into consideration. Allowance must be made for road documents for Noosa and as such, has
reserve dedications and separation of the proposed not been considered in this assessment.
residential development from the road corridor.
Department of Transport and Main Roads RFI Reference in Revised TIA
Item
1 More detailed information is required to be submitted to More detail is provided in ML Design’s
demonstrate whether the proposed development can structure plan drawing which is
achieve a multi-modal movement network that supports reproduced at Appendix B in this report.
access to public passenger transport. The public
passenger transport solutions promoted by the applicant
in the referral material are not supported. Consequently,
the applicant is requested to provide the following
information:
(a) Amended precinct plans and open space, road and
mobility plans (maps 1.3 -1.7 on (a) pages 80-82) of the
Locality Plan document which provide:
more detailed precinct planning showing an
indicative urban structure and street network with
further clarity regarding development densities
and the mixture and distribution of land uses. It is
considered that a workable public passenger
transport outcome for the development cannot be
demonstrated unless a sufficient level of
neighbourhood structure planning is undertaken.
Public passenger transport outcomes should be
sufficiently related to and integrated with the
density and distribution of proposed land uses
and road network/hierarchy and this needs to be
demonstrated through appropriate structure
planning; and
Page 61
a catchment walkability or pedshed analysis, Detailed investigation into the proposed
overlayed with the proposed street network. Such pedestrian and cycle facilities are
information is important to demonstrate how the provided in Vee Design’s submission.
proposed development will optimise future
walkable access to the proposed future dwellings,
bus services and connectivity with any other
points of attraction, within and beyond the
development.
(b) An Access and Mobility Plan for the proposed Section 4.1 and Figure 4-1 illustrate an
development including: indicative street network allowing
an indicative street network at neighbourhood cell potential future public transport
level that demonstrates any proposed public developments to serve the proposed
transport options are efficient to operate and are development.
convenient and able to be safely accessed by
future residents;
existing bus routes and amended proposed bus Figures 2-2 and 4-1 illustrate the existing
routes in accordance with the amended Traffic and potential future public transport
Impact Assessment report required in this networks which would serve the
information request; proposed development.
existing and proposed active transport Sections 2.3 and 4.2 outline the existing
(pedestrian and cycleways), including how these and proposed Active Transport Facilities.
provide accessibility to existing and proposed bus Further information is provided by Vee
routes, residential neighbourhoods and Design.
destinations within and external to the
development; and
evidence on how the proposed development will Section 4.1 outlines the potential public
support public transport provision by achieving transport provision for the proposed
minimum standards of service coverage for buses development.
by demonstrating how at least 90% of residents
will have access to an existing bus stop or a
future bus route within 400m.
(c) An Amended Traffic Impact Assessment which Section 4.1 outlines the potential public
demonstrates: transport provision for the proposed
how the development will support proposed bus development. The Holistic Report, which
routes which will maintain the efficiency and is attached at Appendix G, details the
reliability of existing service patterns. This means design balance between provision of
that the bus turnaround and dead end optimum public transport provision and
connections proposed in section 3.4 would not other design elements such as ecology
result in efficient and cost effective bus service and civil engineering design principles.
operations; and
considers and evaluates options for achieving The Holistic Report, which is attached at
potential bus routes giving consideration to the Appendix G, details access principals
surrounding future development areas and and design process utilised to provide
whether there is a possibility that the the development layout, this includes
development could connect directly into these public transport concerns.
adjoining areas.
Page 62
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Revised Traffic Impact Assessment
as Response to Council’s Request for
Further Information
APPENDIX B
NOOSA ON WEYBA DEVELOPMENT
PLAN
510119 Cardno August 2013
Prepared for Northbrook Corporation Pty Ltd Page 53
Page 63
NOOSA ON WEYBA| STRUCTURE PLAN NORTHBROOK CORP PTY LTD © M L Design Pty Ltd Drawn by: AR ACN 100 492 304 File Path: P:\NORT0001_Lake Weyba\B_Documentation\B1_Production\B1_Drawings\InDesign\130208 Alternate Design Considerations ABN 89 159 048 228 SCALE - 1:10,000 @ A3 APPROVED FOR ISSUE ____ 25/09/2013 JOB NO: NORT0001 MP-005-[I]
Page 64
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Revised Traffic Impact Assessment
as Response to Council’s Request for
Further Information
APPENDIX C
TRAFFIC COUNTS
510119 Cardno August 2013
Prepared for Northbrook Corporation Pty Ltd Page 54
Page 65
9062 - Lake Weyba - IC
Mar-12
JOB NUMBER 9062
JOB NAME Lake Weyba
CLIENT Cardno
SURVEY LOCATION 1. Emu Mountain Arterial Road/Eumundi Noosa Road
2. Emu Mountain Arterial Road/Walter Hay Drive/Eumarella Road
3. Walter Hay Drive/Noosa Civic Shopping Centre Access
4. Walter Hay Drive/Eenie Creek Road
SURVEY TYPE Intersection Counts
SURVEY DATE Thursday, 22 March 2012
SURVEY PERIOD 06:00 AM - 09:00 AM
03:00 PM - 06:00 PM
WEATHER Rain periods
Page 66
AUSTRAFFIC VIDEO INTERSECTION COUNT Eumundi Noosa Road (north)
N
1 2 3
Site No.: 1 Weather: Rain periods
Location: Emu Mountain Arterial Road/Eumundi Noosa Road
Day/Date: Thursday, 29 March 2012
Emu Mountain Arterial Road (east)
AM Peak: Hour ending - 9:00 AM 4
PM Peak: Hour ending - 4:00 PM 5
Camera Position
8 7 6
Eumundi Noosa Road (south)
Movement 1 Movement 2 Movement 3 Movement 4 Movement 5 Movement 6 Movement 7 Movement 8
TIME
(1/4 hr end)
Heavy Vehicles
Heavy Vehicles
Heavy Vehicles
Heavy Vehicles
Heavy Vehicles
Heavy Vehicles
Heavy Vehicles
Heavy Vehicles
Light Vehicles
Light Vehicles
Light Vehicles
Light Vehicles
Light Vehicles
Light Vehicles
Light Vehicles
Light Vehicles
Cyclists
Cyclists
Cyclists
Cyclists
Cyclists
Cyclists
Cyclists
Cyclists
Total
Total
Total
Total
Total
Total
Total
Total
6:15 AM 0 0 0 0 31 1 32 0 6 3 9 1 8 1 9 0 17 0 17 0 0 0 0 0 14 0 14 0 18 7 25 1
6:30 AM 0 0 0 0 40 3 43 0 11 1 12 0 15 1 16 0 18 0 18 0 0 0 0 0 14 0 14 0 36 3 39 0
6:45 AM 0 0 0 0 32 9 41 0 16 3 19 0 14 1 15 0 23 1 24 0 0 0 0 0 23 0 23 0 41 9 50 0
7:00 AM 0 0 0 0 36 6 42 0 19 3 22 0 26 1 27 0 21 2 23 0 0 0 0 0 18 1 19 0 47 5 52 0
7:15 AM 0 0 0 0 38 4 42 0 24 4 28 0 17 2 19 0 32 2 34 0 0 0 0 0 32 0 32 0 45 6 51 0
7:30 AM 0 0 0 0 62 4 66 0 31 2 33 0 25 0 25 0 31 2 33 0 0 0 0 0 40 1 41 0 57 4 61 0
7:45 AM 0 0 0 0 55 5 60 0 34 2 36 0 33 2 35 0 30 4 34 0 0 0 0 0 56 1 57 0 81 4 85 0
8:00 AM 0 0 0 0 54 6 60 0 37 2 39 0 45 1 46 0 41 1 42 0 2 0 2 0 59 0 59 0 84 11 95 0
8:15 AM 0 0 0 0 57 2 59 0 33 4 37 0 20 1 21 0 58 2 60 0 0 0 0 0 94 4 98 0 92 10 102 0
8:30 AM 0 0 0 0 56 3 59 0 29 5 34 0 30 4 34 0 56 1 57 0 0 0 0 0 115 0 115 0 93 10 103 0
8:45 AM 0 0 0 0 71 7 78 0 44 4 48 0 26 3 29 0 60 2 62 0 0 0 0 0 55 1 56 0 93 3 96 0
9:00 AM 0 0 0 0 73 5 78 0 23 1 24 0 36 0 36 0 50 2 52 0 0 1 1 0 61 2 63 0 104 5 109 1
0
0
0
0
605
55
660
0
307
34
341
1
295
17
312
0
437
19
456
0
2
1
3
0
581
10
591
0
791
77
868
2
3 hr Total
AM Peak
0
0
0
0
257
17
274
0
129
14
143
0
112
8
120
0
224
7
231
0
0
1
1
0
325
7
332
0
382
28
410
1
Movement 1 Movement 2 Movement 3 Movement 4 Movement 5 Movement 6 Movement 7 Movement 8
TIME
(1/4 hr end)
Heavy Vehicles
Heavy Vehicles
Heavy Vehicles
Heavy Vehicles
Heavy Vehicles
Heavy Vehicles
Heavy Vehicles
Heavy Vehicles
Light Vehicles
Light Vehicles
Light Vehicles
Light Vehicles
Light Vehicles
Light Vehicles
Light Vehicles
Light Vehicles
Cyclists
Cyclists
Cyclists
Cyclists
Cyclists
Cyclists
Cyclists
Cyclists
Total
Total
Total
Total
Total
Total
Total
Total
3:15 PM 0 0 0 0 76 6 82 0 22 1 23 0 29 3 32 0 51 0 51 0 0 0 0 0 74 3 77 0 101 5 106 0
3:30 PM 0 0 0 0 85 5 90 0 27 3 30 0 22 4 26 0 66 0 66 0 0 0 0 0 59 1 60 0 113 5 118 0
3:45 PM 0 0 0 0 80 12 92 0 39 1 40 0 30 3 33 0 48 2 50 0 0 0 0 0 20 2 22 0 86 4 90 0
4:00 PM 0 0 0 0 95 4 99 0 37 2 39 0 23 3 26 0 40 0 40 0 0 0 0 0 23 1 24 0 87 2 89 0
4:15 PM 0 0 0 0 81 0 81 0 27 2 29 0 35 3 38 0 35 2 37 0 0 0 0 0 38 2 40 0 96 2 98 0
4:30 PM 0 0 0 0 83 4 87 0 27 0 27 0 41 2 43 0 21 0 21 0 0 0 0 0 35 0 35 0 78 2 80 0
4:45 PM 0 0 0 0 91 5 96 0 35 0 35 0 24 1 25 0 33 0 33 0 0 0 0 0 30 2 32 0 78 4 82 0
5:00 PM 0 0 0 0 64 0 64 0 23 0 23 0 27 0 27 0 25 0 25 0 1 0 1 0 34 1 35 0 78 0 78 0
5:15 PM 1 0 1 0 62 1 63 0 25 0 25 0 24 1 25 0 43 0 43 0 2 0 2 0 41 0 41 0 75 3 78 0
5:30 PM 0 0 0 0 90 0 90 0 31 0 31 0 25 1 26 0 44 1 45 0 0 0 0 0 25 0 25 0 76 2 78 0
5:45 PM 0 0 0 0 70 2 72 0 21 0 21 0 32 1 33 0 28 1 29 1 1 0 1 0 29 1 30 0 80 0 80 0
6:00 PM 0 0 0 0 50 0 50 0 25 0 25 0 21 0 21 0 27 2 29 0 1 0 1 0 27 0 27 0 64 2 66 0
1
0
1
0
927
39
966
0
339
9
348
0
333
22
355
0
461
8
469
1
5
0
5
0
435
13
448
0
1012
31
1043
0
3 hr Total
PM Peak
0
0
0
0
336
27
363
0
125
7
132
0
104
13
117
0
205
2
207
0
0
0
0
0
176
7
183
0
387
16
403
0
[OCR of page images]
Eumundi Noosa Road (north
AUSTRAFFIC VIDEO INTERSECTION COUNT
sjsyOKQ]}- C COCO OOO OO Oo KH [z L ssKQ}C CC OOOO OO oO oO Off 0
a2 a © © ©
o Puk<SBR85S SBS Ss Sieoe low 2 mojo = §SSRSSRRRB Seve leon
o
: é
§ [saan Mea] mo oo ows FSS o wl lez 8 |saoyen Mneoxfo wo tt OM WO NIE on
3
=
= 2
seprxypprwoe? SzS2lB ss 888 Shr z8e seqmyeA WTS - SSSRRRKKL S Sferor L8€
sIsJOIQ]} 0 OC COO OOO OO Oo Og 0 ssKQ}C CC OOOO OO oO oO Off 0
© nN
> . moj > A8283855 8 8 = B Sires zee 2 molK SXXF88 8 FAB Rlerv est
a o
4 =
& 5 &
z & |saeuen Mnepfo oo - oH - oO + OH lor lL 8 |saoyen Mreoyfo — aH won roo Off lL
S$ °
4 =
a ©
= seqyen yo] XS 8LSF BBS xr B Shires sze sqryan MHS BRRA8 8B Ss BV Alser OL
& gsIsJoIQ} 0 OC OOOO OO OOo Ofg 0 gsIsJAQIC COO OO OOO oO oO Off 0
ct
E
S o
Ss fROl]o COCO OO ON OO Oo Oo eK [gE L < 1B0I}0 COCO OO Or NO er eK Ig lo
© od
s ~
BE os 5 5
a = & [samen Mney]o oo 0 Oo Oo OOO H| L 8 |saoyen MeeH]o 0 0 oO oO ofp 0
So °
2
° =
+ ol 2 sgaiyan yB]}o CC OCC ON OC Oo Oflg 0 saya, ybIo oO OOOO KN OOH KH] 0
6
l sjsyOIQ} 0 OC COO OOO OO Oo Og 0 sjsJKQJ}O CC OOOO OO Or Off 0
2
3 hezvesevaograan © re eseeorree one @
o_t 3 o eouj=F ARS 88S SH S Glos Lez 2 mols S8FER 88 8 FFB Alew oz
2 o
€ £
z 3 g
a, meg & | samen Mnepfo oc - NY Hw Hw EL lL 8 |saoyan Mreayfo ou on ocooo- ~ ale z
3
g =
$ = x
—— Ling sqyero]= 2 Ras 5s 8B BS Bleer pez sqyeAWOTi5 8 SSF8xH8B AS FR Afro soz
=
5
+_eeg sjsyOIQ} 0 OC COO OOO OO Oo Og 0 ssKQ}C CC OOOO OO oO oO Off 0
a
e
<
+ mojo PRPRESRSEEASA Slzse lozt 2 mos FBRBFARAAR SB Afese Zub
o
5 3
& | samuen Arey] -— - ~ WON HH + om Oftb Ig 2 sgqayap Aneapfo + ooo Nr Or + & Ofez eb
3
=
seen oro 2S REr eB as & BIsez zbb sqYyeAMHAR AN SRSTARA AS Afece ror
gssjokg}- © CSCC COFCO CO Off 0 sjsjolgho 0 0000 OOO oC Oo ofp 0
0
» rojo SA2PRR8 885 SF Alive ebb 2 moyAseB8RFsRaAa A Aleve zen
o
5 3
§ [saan Melo — oo + anny o + |e ph 2 sqaiyap Aneayp}—- UN NOOO OO Oo Og iL
3
=
seen woo S2FASESS5 BAW Vlcoe ezh sqYEAMHHN TBSRABRAS A Ree eze
g sjsyOIQ} 0 OC COO OOO OO Oo Og 0 ssKQ}O CC OOOO OO oO oO Off 0
~Z
s
g “0
8 ~ mols F533 38388 8 BR joss paz 2 mous SS85S 8S 8 SR Bove lege
o
Zz < £
oz e 3 =
os § | semuen Mey] - > oO © + + © OA oO Nr wI| gg a & |saoyen Aneapyfoo wo V+ ot 0 Oo - ow fee uz
BE 3
5
S x c x x
38 seyernHos $888 8S 8S GBR LIsoo zsz seqyeAMOe 838585 SES ER Bees gee
“as =
reat
Bass
Z2zeoscs sjsyOIQ} 0 OC COO OOO OO Oo Og 0 ssKQ}O CC OOOO OO oO oO Off 0
SENAY
Sas
SEE -
tsi i fBOl]}o 90909 FDO OO oO oO Oo Ofg lo < [RIOI]o FC FCO FO OO oO KX oO Oo Off lo
gz w & = 8
Bass 5 5
ga S38 2 A 3 A
BATS § | semen MeH}o oo oo OOOO OO Olp 0 8 Jsaayen Aeay]o ooo oO oO oO OO Oo fo 0
SS. 3
2322 3
g
=~ 2225 saaiyap YbII}Oo Oo COO OOOO Oo Ofg 0 sgyayaawyBi}Jo oO OOOO Or Oo off 0
oe
s e234 = SSESSEE5E222285 2 SESS EzzEzz8
sss § ze caeacaaecat ea tt < fl os ea 32 aoa0 00 GOO 0 OO) ols 9,
Zeon FE 28232888 28 g gmorne predav FS 28282888 28 ¥ gpmorue predid
S3rss < SOORKRKR RR DBO < oonoatrt+ + 6H 6H BS
Awadaa — =
Page 67
AUSTRAFFIC VIDEO INTERSECTION COUNT
Site No.: 1 Weather: Fine
Location: Emu Mountain Arterial Road/Eumundi Noosa Road
Day/Date: Thursday, 29 March 2012
Summary: AM Peak : Hour ending - 9:00 AM
PM Peak : Hour ending - 4:00 PM
Eumundi Noosa Road (north)
Total 1 2 3 Total
vol 530 0 274 143 417
AM PEAK
% CV 7% 0% 6% 10% 7%
vol 520 0 363 132 495 AM PEAK PM PEAK
PM PEAK
% CV 6% 0% 7% 5% 7% vol % CV vol % CV
N 475 4% 315 4% Total
Emu Mountain Arterial Road (east)
120 7% 117 11% 4
231 3% 207 1% 5
351 4% 324 5% Total
vol 743 410 332 1 506
AM PEAK
% CV 5% 7% 2% 100% 5%
vol 586 403 183 0 570
PM PEAK
% CV 4% 4% 4% ###### 5%
Total 8 7 6 Total
Eumundi Noosa Road (south)
The text continues on page 68.