Council archive · source document
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
LANE SUMMARY Site: 18 PM BG Existing
Emu Mountain Road/Walter Hay Drive/Eumarella Road
2018 PM Peak Background Traffic
Existing Layout
Roundabout
Lane Use and Performance
Demand Flows Deg. Lane Average Level of 95% Back of Queue Lane SL Cap. Prob.
L T R Total HV Cap. Satn Util. Delay Service Vehicles Distance Length Type Adj. Block.
veh/h veh/h veh/h veh/h % veh/h v/c % sec veh m m % %
South: Emu Mountain Road
6
Lane 1 246 94 0 340 5.0 1488 0.229 98 3.3 LOS A 1.4 10.0 500 – 0.0 0.0
Lane 2 0 443 21 464 5.0 1998 0.232 100 3.5 LOS A 1.5 10.7 140 Turn Bay 0.0 0.0
Approach 246 537 21 804 5.0 0.232 3.4 LOS A 1.5 10.7
East: Eumarella Road
Lane 1 2 14 19 35 5.0 984 0.035 100 9.1 LOS A 0.2 1.1 500 – 0.0 0.0
Approach 2 14 19 35 5.0 0.035 9.1 LOS A 0.2 1.1
North: Walter Hay Drive
Lane 1 21 370 0 391 5.0 1570 0.249 100 3.3 LOS A 1.4 10.0 500 – 0.0 0.0
Lane 2 0 180 139 319 5.0 1279 0.249 100 7.1 LOS A 1.3 9.5 150 Turn Bay 0.0 0.0
Approach 21 551 139 711 5.0 0.249 5.0 LOS A 1.4 10.0
West: Emu Mountain Road
Lane 1 154 12 0 166 5.0 1074 0.154 100 4.4 LOS A 0.7 5.2 500 – 0.0 0.0
Lane 2 0 14 202 216 5.0 1403 0.154 100 11.5 LOS A 0.8 5.6 200 Turn Bay 0.0 0.0
Approach 154 26 202 382 5.0 0.154 8.4 LOS A 0.8 5.6
Intersection 1932 5.0 0.249 5.1 LOS A 1.5 10.7
Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.
6 Lane underutilisation due to downstream effects
Processed: Monday, 5 August 2013 3:06:07 PM Copyright © 2000-2011 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 5.1.5.2006 www.sidrasolutions.com
Project: G:\510119 - Lake Weyba DA\510119 Modelling\RFI\2 Emu Mountain_Walter Hay_Eumarella 2013 04
15.sip
8000955, CARDNO, ENTERPRISE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.