Council archive · source document
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
LANE SUMMARY Site: 18PM BG+Dev
Walter Hay Drive/Site Access
2018 PM Peak Background and Development Traffic
Proposed Layout
Roundabout
Lane Use and Performance
Demand Flows Deg. Lane Average Level of 95% Back of Queue Lane SL Cap. Prob.
L T R Total HV Cap. Satn Util. Delay Service Vehicles Distance Length Type Adj. Block.
veh/h veh/h veh/h veh/h % veh/h v/c % sec veh m m % %
South: Walter Hay Drive
6
Lane 1 71 198 0 269 5.0 1218 0.221 59 4.8 LOS A 1.3 9.2 90 Turn Bay 0.0 0.0
Lane 2 0 511 84 595 5.0 1585 0.376 100 5.3 LOS A 2.6 19.0 500 – 0.0 0.0
Approach 71 709 84 864 5.0 0.376 5.1 LOS A 2.6 19.0
East: Weyba East
Lane 1 39 27 59 125 5.0 771 0.163 100 10.7 LOS A 0.7 5.4 500 – 0.0 0.0
Approach 39 27 59 125 5.0 0.163 10.7 LOS A 0.7 5.4
North: Walter Hay Drive
6
Lane 1 126 160 0 287 5.0 1266 0.226 57 4.7 LOS A 1.3 9.4 90 Turn Bay 0.0 0.0
Lane 2 0 552 105 658 5.0 1645 0.400 100 5.0 LOS A 2.8 20.6 500 – 0.0 0.0
Approach 126 713 105 944 5.0 0.400 4.9 LOS A 2.8 20.6
West: Weyba West
Lane 1 48 0 0 48 5.0 825 0.059 100 7.6 LOS A 0.3 1.9 40 Turn Bay 0.0 0.0
Lane 2 0 27 33 60 5.0 1040 0.058 100 9.7 LOS A 0.3 2.0 500 – 0.0 0.0
Approach 48 27 33 108 5.0 0.059 8.8 LOS A 0.3 2.0
Intersection 2042 5.0 0.400 5.6 LOS A 2.8 20.6
Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.
6 Lane underutilisation due to downstream effects
Processed: Monday, 5 August 2013 3:13:35 PM Copyright © 2000-2011 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 5.1.5.2006 www.sidrasolutions.com
Project: G:\510119 - Lake Weyba DA\510119 Modelling\RFI\3 Walter Hay_Site Access 2013 04 15.sip
8000955, CARDNO, ENTERPRISE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.