Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
LANE SUMMARY Site: 28PM BG+Dev
Walter Hay Drive/Site Access
2028 PM Peak Background and Development Traffic
Proposed Layout
Roundabout
Lane Use and Performance
Demand Flows Deg. Lane Average Level of 95% Back of Queue Lane SL Cap. Prob.
L T R Total HV Cap. Satn Util. Delay Service Vehicles Distance Length Type Adj. Block.
veh/h veh/h veh/h veh/h % veh/h v/c % sec veh m m % %
South: Walter Hay Drive
6
Lane 1 71 254 0 325 5.0 1220 0.266 59 4.8 LOS A 1.6 11.7 90 Turn Bay 0.0 0.0
Lane 2 0 635 84 719 5.0 1586 0.453 100 5.2 LOS A 3.4 25.0 500 – 0.0 0.0
Approach 71 889 84 1044 5.0 0.453 5.0 LOS A 3.4 25.0
East: Weyba East
Lane 1 39 27 59 125 5.0 690 0.181 100 11.6 LOS A 0.9 6.3 500 – 0.0 0.0
Approach 39 27 59 125 5.0 0.181 11.6 LOS A 0.9 6.3
North: Walter Hay Drive
6
Lane 1 126 216 0 342 5.0 1268 0.270 57 4.6 LOS A 1.6 11.8 90 Turn Bay 0.0 0.0
Lane 2 0 679 105 784 5.0 1647 0.476 100 4.9 LOS A 3.7 27.0 500 – 0.0 0.0
Approach 126 895 105 1126 5.0 0.476 4.8 LOS A 3.7 27.0
West: Weyba West
Lane 1 48 0 0 48 5.0 730 0.066 100 8.3 LOS A 0.3 2.2 40 Turn Bay 0.0 0.0
Lane 2 0 27 33 60 5.0 947 0.063 100 10.3 LOS A 0.3 2.3 500 – 0.0 0.0
Approach 48 27 33 108 5.0 0.066 9.4 LOS A 0.3 2.3
Intersection 2404 5.0 0.476 5.5 LOS A 3.7 27.0
Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.
6 Lane underutilisation due to downstream effects
Processed: Monday, 5 August 2013 3:13:37 PM Copyright © 2000-2011 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 5.1.5.2006 www.sidrasolutions.com
Project: G:\510119 - Lake Weyba DA\510119 Modelling\RFI\3 Walter Hay_Site Access 2013 04 15.sip
8000955, CARDNO, ENTERPRISE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.