Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208

of 204

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

LANE SUMMARY                                                                                                       Site: 18PM BG Existing
Walter Hay Drive/Eenie Creek Road
2018 PM Peak Background Traffic
Existing Layout
Roundabout



 Lane Use and Performance
                   Demand Flows                Deg. Lane Average Level of 95% Back of Queue Lane                           SL    Cap. Prob.
                 L     T     R Total HV Cap. Satn Util. Delay    Service Vehicles Distance Length                         Type    Adj. Block.
             veh/h veh/h veh/h veh/h % veh/h     v/c  %      sec              veh        m      m                                  %       %
 South: Walter Hay Drive
 Lane 1         68     0     0    68 5.0 893 0.077 100       5.0  LOS A        0.4      2.6   280                          –      0.0    0.0
 Lane 2          0 198 404       602 5.0 1229 0.490 100     10.6  LOS A        3.4     24.9   280                          –      0.0    0.0
 Approach        68   198    404     671 5.0           0.490             10.0    LOS A          3.4         24.9

 East: Eenie Creek Road
 Lane 1       349 240          0     590 5.0 1362 0.433         100        4.4   LOS A          3.2         23.6    500    –      0.0    0.0
 Lane 2          0 284       184     468 5.0 1080 0.433         100        8.0   LOS A          3.0         21.6    500    –      0.0    0.0
 Approach       349   524    184    1058 5.0           0.433               6.0   LOS A          3.2         23.6

 North: Walter Hay Drive
 Lane 1        214 262         82    558 5.0      825 0.676     100       11.1   LOS A          6.1         44.8    500    –      0.0    0.0
 Approach       214   262      82    558 5.0           0.676              11.1   LOS A          6.1         44.8

 West: Eenie Creek Road
 Lane 1       128 306           0    435 5.0 1299 0.335         100        6.1   LOS A          3.2         23.4    140    –      0.0    0.0
 Lane 2         0 202          84    286 5.0 856 0.335          100        9.6   LOS A          2.6         19.1    140    –      0.0    0.0
 Approach       128   508      84    721 5.0           0.335               7.5   LOS A          3.2         23.4

 Intersection                       3007 5.0           0.676               8.2   LOS A          6.1         44.8


Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.



Processed: Monday, 5 August 2013 3:30:38 PM          Copyright © 2000-2011 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 5.1.5.2006                        www.sidrasolutions.com
Project: G:\510119 - Lake Weyba DA\510119 Modelling\RFI\5 Walter Hay_Eeinie Creek 2013 04 15.sip
8000955, CARDNO, ENTERPRISE

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.