Skip to the record
Accept no substitutions.

Council archive · source document

Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208

of 204

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

LANE SUMMARY                                                                                                       Site: 28AM BG Existing
Walter Hay Drive/Eenie Creek Road
2028 AM Peak Background Traffic
Existing Layout
Roundabout



 Lane Use and Performance
                   Demand Flows                Deg. Lane Average Level of 95% Back of Queue Lane                            SL    Cap. Prob.
                 L     T     R Total HV Cap. Satn Util. Delay    Service Vehicles Distance Length                          Type    Adj. Block.
             veh/h veh/h veh/h veh/h % veh/h     v/c  %      sec               veh       m      m                                   %       %
 South: Walter Hay Drive
 Lane 1        160     0     0   160 5.0 784 0.204 100       5.8  LOS A        1.1      8.1   280                           –      0.0    0.0
 Lane 2          0 427 565       993 5.0 1015 0.978 100     35.2 LOS C        27.1    197.6   280                           –      0.0    0.0
 Approach       160   427    565    1153 5.0           0.978             31.1    LOS C         27.1     197.6

 East: Eenie Creek Road
 Lane 1       439 401          0     840 5.0 1374 0.611         100        4.9   LOS A          5.8         42.3     500    –      0.0    0.0
 Lane 2          0 336       334     670 5.0 1096 0.611         100        9.8   LOS A          5.6         41.1     500    –      0.0    0.0
 Approach       439   737    334    1509 5.0           0.611               7.1   LOS A          5.8         42.3

 North: Walter Hay Drive
 Lane 1        302 307         78    687 5.0      584 1.177     100     192.0    LOS F         81.7     596.7        500    –      0.0   10.5
 Approach       302   307      78    687 5.0           1.177            192.0    LOS F         81.7     596.7

 West: Eenie Creek Road
 Lane 1        88 486           0    574 5.0      563 1.019     100     144.8    LOS F         53.4     389.7        140    –      0.0   70.0
 Lane 2         0 280          74    353 5.0      347 1.019     100     150.5    LOS F         33.4     244.0        140    –      0.0   25.1
 Approach        88   765      74    927 5.0           1.019            147.0    LOS F         53.4     389.7

 Intersection                       4277 5.0           1.177             73.6    LOS F         81.7     596.7


Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.



Processed: Monday, 5 August 2013 3:30:41 PM          Copyright © 2000-2011 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 5.1.5.2006                        www.sidrasolutions.com
Project: G:\510119 - Lake Weyba DA\510119 Modelling\RFI\5 Walter Hay_Eeinie Creek 2013 04 15.sip
8000955, CARDNO, ENTERPRISE

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.