Skip to the record
Search everything, all in one place.

Council archive · source document

Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208

of 204

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

LANE SUMMARY                                                                                                Site: 28PM BG+Dev Existing
Walter Hay Drive/Eenie Creek Road
2028 PM Peak Background+Development Traffic
Existing Layout
Roundabout



 Lane Use and Performance
                   Demand Flows                Deg. Lane Average Level of 95% Back of Queue Lane                          SL    Cap. Prob.
                 L     T     R Total HV Cap. Satn Util. Delay    Service Vehicles Distance Length                        Type    Adj. Block.
             veh/h veh/h veh/h veh/h % veh/h     v/c  %      sec              veh        m      m                                 %       %
 South: Walter Hay Drive
 Lane 1        106     0     0   106 5.0 787 0.135 100       5.5  LOS A        0.7      5.2   280                         –      0.0    0.0
 Lane 2          0 288 547       836 5.0 1052 0.795 100     15.4 LOS B         9.8     71.7   280                         –      0.0    0.0
 Approach       106   288    547     942 5.0           0.795             14.3    LOS A          9.8         71.7

 East: Eenie Creek Road
 Lane 1       518 274          0     792 5.0 1230 0.644         100        6.8   LOS A          7.1         51.8   500    –      0.0    0.0
 Lane 2          0 384       231     614 5.0 954 0.644          100       11.0   LOS A          6.6         47.9   500    –      0.0    0.0
 Approach       518   658    231    1406 5.0           0.644               8.6   LOS A          7.1         51.8

 North: Walter Hay Drive
 Lane 1        268 408       103     780 5.0      627 1.245     100     244.9    LOS F        111.5     813.6      500    –      0.0   22.0
 Approach       268   408    103     780 5.0           1.245            244.9    LOS F        111.5     813.6

 West: Eenie Creek Road
 Lane 1       160 418          0     578 5.0      860 0.672     100      17.6    LOS B         11.3         82.6   140    –      0.0    0.0
 Lane 2         0 219        145     364 5.0      543 0.672     100      25.5    LOS B          8.7         63.3   140    –      0.0    0.0
 Approach       160   637    145     942 5.0           0.672             20.6    LOS B         11.3         82.6

 Intersection                       4071 5.0           1.245             58.0    LOS E        111.5     813.6


Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.



Processed: Monday, 5 August 2013 3:30:46 PM          Copyright © 2000-2011 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 5.1.5.2006                        www.sidrasolutions.com
Project: G:\510119 - Lake Weyba DA\510119 Modelling\RFI\5 Walter Hay_Eeinie Creek 2013 04 15.sip
8000955, CARDNO, ENTERPRISE

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.