Skip to the record
Every meeting, every word.

Council archive · source document

Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208

of 204

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

LANE SUMMARY                                                                                                       Site: 18AM BG Mitigated
Walter Hay Drive/Eenie Creek Road
2018 AM Peak Background Traffic
Mitigated Layout
Roundabout



 Lane Use and Performance
                   Demand Flows                Deg. Lane Average Level of 95% Back of Queue Lane                             SL      Cap. Prob.
                 L     T     R Total HV Cap. Satn Util. Delay    Service Vehicles Distance Length                           Type      Adj. Block.
             veh/h veh/h veh/h veh/h % veh/h     v/c  %      sec              veh        m      m                                      %       %
 South: Walter Hay Drive
 Lane 1        128 340      65   533 5.0 1197 0.446 100      6.1  LOS A        2.9     21.0   280                            –        0.0    0.0
 Lane 2          0     0 386     386 5.0 865 0.446 100      14.4  LOS A        2.6     19.3   280                            –        0.0    0.0
 Approach       128   340    451     919 5.0           0.446               9.6   LOS A          2.9         21.0

 East: Eenie Creek Road
 Lane 1       351 318          0     669 5.0 1464 0.457         100        3.9   LOS A          3.0         21.9      500    –        0.0    0.0
 Lane 2          0 269       266     536 5.0 1173 0.457         100        8.3   LOS A          2.8         20.6      500    –        0.0    0.0
 Approach       351   587    266    1204 5.0           0.457               5.8   LOS A          3.0         21.9

 North: Walter Hay Drive
 Lane 1        241     81       0    322 5.0 1127 0.286         100        5.3   LOS A          1.6         12.0       40 Turn Bay    0.0    0.0
 Lane 2          0 163         62    225 5.0 788 0.286          100        8.4   LOS A          1.4         10.5      500     –       0.0    0.0
 Approach      241 244         62    547 5.0      0.286                    6.5   LOS A          1.6         12.0

 West: Eenie Creek Road
 Lane 1        71 362           0    432 5.0 1095 0.395         100        5.3   LOS A          2.5         18.4      140    –        0.0    0.0
 Lane 2         0 248          58    306 5.0 774 0.395          100        8.1   LOS A          2.3         16.6      140    –        0.0    0.0
 Approach        71   609      58    738 5.0           0.395               6.4   LOS A          2.5         18.4

 Intersection                       3408 5.0           0.457               7.1   LOS A          3.0         21.9


Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.



Processed: Monday, 5 August 2013 3:40:51 PM          Copyright © 2000-2011 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 5.1.5.2006                        www.sidrasolutions.com
Project: G:\510119 - Lake Weyba DA\510119 Modelling\RFI\5 Walter Hay_Eeinie Creek 2013 04 15.sip
8000955, CARDNO, ENTERPRISE

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.