Skip to the record
Search everything, all in one place.

Council archive · source document

Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208

of 204

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

LANE SUMMARY                                                                                           Site: 18AM BG+Dev Mitigated
Walter Hay Drive/Eenie Creek Road
2018 AM Peak Background+Development Traffic
Mitigated Layout
Roundabout



 Lane Use and Performance
                   Demand Flows                Deg. Lane Average Level of 95% Back of Queue Lane                          SL      Cap. Prob.
                 L     T     R Total HV Cap. Satn Util. Delay    Service Vehicles Distance Length                        Type      Adj. Block.
             veh/h veh/h veh/h veh/h % veh/h     v/c  %      sec              veh        m      m                                   %       %
 South: Walter Hay Drive
 Lane 1        165 416      62   643 5.0 1180 0.545 100      6.7  LOS A        4.1     30.1   280                         –        0.0    0.0
 Lane 2          0     0 465     465 5.0 853 0.545 100      15.3 LOS B         3.7     27.2   280                         –        0.0    0.0
 Approach       165   416    526    1107 5.0           0.545             10.3    LOS A          4.1         30.1

 East: Eenie Creek Road
 Lane 1       384 306          0     690 5.0 1428 0.484         100        4.1   LOS A          3.2         23.6   500    –        0.0    0.0
 Lane 2          0 281       266     547 5.0 1132 0.484         100        8.4   LOS A          3.1         22.3   500    –        0.0    0.0
 Approach       384   587    266    1238 5.0           0.484               6.0   LOS A          3.2         23.6

 North: Walter Hay Drive
 Lane 1        241 103          0    345 5.0 1063 0.324         100        5.7   LOS A          2.0         14.5    40 Turn Bay    0.0    0.0
 Lane 2          0 175         62    238 5.0 733 0.324          100        8.9   LOS A          1.7         12.5   500     –       0.0    0.0
 Approach      241 279         62    582 5.0      0.324                    7.0   LOS A          2.0         14.5

 West: Eenie Creek Road
 Lane 1        71 377           0    447 5.0 1004 0.446         100        6.0   LOS A          3.1         22.9   140    –        0.0    0.0
 Lane 2         0 233          76    308 5.0 692 0.446          100        9.5   LOS A          2.7         20.0   140    –        0.0    0.0
 Approach        71   609      76    756 5.0           0.446               7.5   LOS A          3.1         22.9

 Intersection                       3683 5.0           0.545               7.7   LOS A          4.1         30.1


Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.



Processed: Monday, 5 August 2013 3:40:59 PM          Copyright © 2000-2011 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 5.1.5.2006                        www.sidrasolutions.com
Project: G:\510119 - Lake Weyba DA\510119 Modelling\RFI\5 Walter Hay_Eeinie Creek 2013 04 15.sip
8000955, CARDNO, ENTERPRISE

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.