Skip to the record
Accept no imitations.

Council archive · source document

Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208

of 204

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                               Access Options Assessment
                                                                         Noosa on Weyba



       9.2         Ecology                                                                 20
       9.3         Civil Engineering                                                       21
       9.4         Overall Score                                                           21
10     Option 4 Assessment                                                                 22
       10.1        Transport                                                               22
       10.2        Ecology                                                                 22
       10.3        Civil Engineering                                                       23
       10.4        Overall Score                                                           23
11     Option 4A Assessment                                                                24
       11.1        Transport                                                               24
       11.2        Ecology                                                                 24
       11.3        Civil Engineering                                                       25
       11.4        Overall Score                                                           25
12     Option 5 Assessment                                                                 26
       12.1        Transport                                                               26
       12.2        Ecology                                                                 26
       12.3        Civil Engineering                                                       27
       12.4        Overall Score                                                           27
13     Option 5A Assessment                                                                28
       13.1        Transport                                                               28
       13.2        Ecology                                                                 28
       13.3        Civil Engineering                                                       29
       13.4        Overall Score                                                           29
14     Option 6 Assessment                                                                 30
       14.1        Transport                                                               30
       14.2        Ecology                                                                 30
       14.3        Civil Engineering                                                       31
       14.4        Overall Score                                                           31
15     Option 6A Assessment                                                                32
       15.1        Transport                                                               32
       15.2        Ecology                                                                 32
       15.3        Civil Engineering                                                       33
       15.4        Overall Score                                                           33
16     Summary                                                                             34
       16.2        Best Holistic Scoring Option                                            34
       16.3        Design Masterplan Option                                                34



Tables
Table 3-1      Options Criteria - Transport                                                 8
Table 3-2      Options Criteria - Ecology                                                   8
Table 3-3      Options Criteria – Civil Engineering                                         9
Table 3-4      Scoring Scale                                                                9
Table 4-1      Option 1 Assessment - Transport                                             10
Table 4-2      Option 1 Assessment - Ecology                                               10


510119 13 September 2013                              Cardno          13 September 2013
Prepared for Northbrook Corporation Pty Ltd                                           iv

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.