Council archive · source document
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
Access Options Assessment
Noosa on Weyba
2.5 Option 3
Option 3 uses staggered intersections, providing access from both eastern and western sides of the
development to Walter Hay Drive. However, a direct connection between the two sides is not provided. A link
to Eumarella Road via the Tidswell Road road reserve would be provided, but no link would be provided to
Eumundi-Noosa Road via Hollett Road. Figure 2-3 shows the access option.
Figure 2-3 Access Option 3
2.6 Option 3A
Option 3A, indicated on Figure 2-3 by the dotted line, incorporates a connecting road underpass between
Hollett Road and Tidswell Road. This link would connect the eastern and western development parcels.
510119 13 September 2013 Cardno 13 September 2013
Prepared for Northbrook Corporation Pty Ltd Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.