Skip to the record
Accept no imitations.

Council archive · source document

Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208

of 204

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                  Access Options Assessment
                                                                                                            Noosa on Weyba




6                Option 2 Assessment
6.1              Transport
Table 6-1        Option 2 Assessment - Transport
      Criteria                        Description                    Score                    Justification
                                                                             This option does not provide for connectivity
                        How easily does this access option                   between the two sides of the development.
                        provide connectivity between the two                 Access to and from Walter Hay Drive is
Connectivity –
                        sides of the development and                  1      impeded by the limitation to left-in, left-out.
Private Vehicles
                        provide connectivity to the wider road               Therefore, traffic would be forced to utilise
                        network                                              the circuitous routes to Hollett Road and
                                                                             Tidswell Road.
                                                                             Public transport provision would need to
                        The ability to provide a realistic and
Connectivity –                                                               either be in one direction with a turnaround
                        suitable layout for public transport          2
Public Transport                                                             on the western side, or would include
                        with this access option
                                                                             significant dead end running of up to 2km.
                                                                             Although some traffic would utilise the left-in,
                        The impact that this access option
                                                                             left-out access from Walter Hay Drive, the
                        will have on the amenity of the
Residential Amenity                                                   2      majority of traffic would still impact on the
                        surrounding residential areas and
                                                                             residents of Old Hollett Road and Tidswell
                        road networks
                                                                             Road.
                                                                             This option still provides opportunity to
Connectivity –          How conducive the proposed access                    provide pedestrian and cycle connectivity to
Pedestrian and          solution is to encouraging the use of         4      the existing facilities and to access each
Cyclist                 Active Travel Modes                                  side of the development via the existing
                                                                             underpass.
                                                                             The provision of a left-in, left-out intersection
                        A high level estimate of the impact
                                                                             would introduce a small level of delay
Delay to Traffic on     that an access of this type will have
                                                                      4      through traffic slowing down to enter and
Walter Hay Drive        on traffic capacity of Walter Hay
                                                                             exit. However, this delay would not be
                        Drive
                                                                             significant.
                        Average Score                                 2.6


6.2              Ecology
Table 6-2        Option 2 Assessment - Ecology
      Criteria                        Description                    Score                    Justification
                                                                             This option will involve less clearance of
                        The impact that each option will have
                                                                             existing wildlife habitat than either Option 1
                        on the extent of wildlife habitat in the
                                                                             or 2A to facilitate necessary upgrades to
                        locality. The rating of the option is
Habitat Loss                                                          2      both Hollett Road and Tidswell Road.
                        inversely related to the associated
                                                                             Approximately 1.85km of Hollett Road and
                        extent of vegetation and habitat
                                                                             1.5km of Tidswell Road will need to be
                        clearance.
                                                                             upgraded.
                        The impact that each option will have
                        on the movement of native wildlife
                        between areas of high value
                                                                             This option will result in the establishment of
                        bushland that is dissected by the
                                                                             approximately 2.25 km of upgraded roadway
Habitat                 road option. The rating of the option
                                                                      2      that traverses otherwise contiguous areas of
Fragmentation           is inversely related to the length of
                                                                             high value bushland habitat situated either
                        roadway that is established and
                                                                             side of the roadways.
                        operated through areas of high value
                        bushland (e.g. remnant vegetation
                        and Koala Bushland habitat).

Road Mortality          There is a relationship between               2      Relative to Options 1 and 1A, a substantial
                        traffic volumes and velocities and the               proportion of the traffic generated by the


510119 13 September 2013                                    Cardno                                        13 September 2013
Prepared for Northbrook Corporation Pty Ltd                                                                        Page 14

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.