                                                                                                Access Options Assessment
                                                                                                          Noosa on Weyba



       Criteria                       Description                   Score                   Justification
                        There is a relationship between                     Relative to Options 1 and 1A, a substantially
                        traffic volumes and velocities and the              greater proportion of the traffic generated by
                        likelihood that wildlife mortality (and             the Noosa on Weyba development would be
                        morbidity). The rating of each option               directed onto Walter Hay Drive. Existing
                        is inversely related to:                            fauna exclusion (guide) fencing along Walter
                         the capacity to maintain low                      Hay Drive is to be completed as part of the
                             vehicular speeds (i.e. < 50 kph)               Noosa on Weyba project.
                             through road geometry and                      Option 3 is essentially the same as Option 2,
                             passive engineering design; and                in respect of the distribution of traffic
                         the volume of traffic on the                      movements on the local road network and
                             roadway.                                       vehicular speeds
Road Mortality                                                       2
                                                                            A substantial increase in traffic volumes
                                                                            would still be experienced on both Hollett
                                                                            Road and Tidswell Road, which have
                                                                            straight stretches of roadway that will make
                                                                            it difficult to maintain vehicular speeds at or
                                                                            below 50kph. Consequently there is an
                                                                            increased risk of road trauma for native
                                                                            fauna. The length of number of straight
                                                                            stretches of roadway under Option 3 is
                                                                            equivalent to Option 2 and less than for
                                                                            Options 1 or 1A.
                        Average Score                                2.0


8.3               Civil Engineering
Table 8-3         Option 3 Assessment – Civil Engineering
       Criteria                       Description                   Score                   Justification
                        The economic cost of the roadworks                  This option will provide slightly increased
                        and     associated    infrastructure.               cost compared to Option 2 due to the
Cost                                                                 4
                        Highest cost will equal the lowest                  staggering of the intersections on Walter
                        number.                                             Hay Drive.
                                                                            The roads will have one less culvert crossing
                        The effect of the road on the
                                                                            than Option 1 which is a benefit for
Stormwater              stormwater and flooding aspects of           4
                                                                            maintenance. The works will not have any
                        the site
                                                                            detrimental effect on flood levels.
                        Average Score                                4.0


8.4               Overall Score
Considering the transport, ecological and civil engineering aspects of this access option, Option 3 has an
overall score of 9.6.




510119 13 September 2013                                   Cardno                                       13 September 2013
Prepared for Northbrook Corporation Pty Ltd                                                                      Page 19

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.