Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
Access Options Assessment
Noosa on Weyba
Criteria Description Score Justification
There is a relationship between Relative to Options 1 and 1A, a substantially
traffic volumes and velocities and the greater proportion of the traffic generated by
likelihood that wildlife mortality (and the Noosa on Weyba development would be
morbidity). The rating of each option directed onto Walter Hay Drive. Existing
is inversely related to: fauna exclusion (guide) fencing along Walter
the capacity to maintain low Hay Drive is to be completed as part of the
vehicular speeds (i.e. < 50 kph) Noosa on Weyba project.
through road geometry and Option 3 is essentially the same as Option 2,
passive engineering design; and in respect of the distribution of traffic
the volume of traffic on the movements on the local road network and
roadway. vehicular speeds
Road Mortality 2
A substantial increase in traffic volumes
would still be experienced on both Hollett
Road and Tidswell Road, which have
straight stretches of roadway that will make
it difficult to maintain vehicular speeds at or
below 50kph. Consequently there is an
increased risk of road trauma for native
fauna. The length of number of straight
stretches of roadway under Option 3 is
equivalent to Option 2 and less than for
Options 1 or 1A.
Average Score 2.0
8.3 Civil Engineering
Table 8-3 Option 3 Assessment – Civil Engineering
Criteria Description Score Justification
The economic cost of the roadworks This option will provide slightly increased
and associated infrastructure. cost compared to Option 2 due to the
Cost 4
Highest cost will equal the lowest staggering of the intersections on Walter
number. Hay Drive.
The roads will have one less culvert crossing
The effect of the road on the
than Option 1 which is a benefit for
Stormwater stormwater and flooding aspects of 4
maintenance. The works will not have any
the site
detrimental effect on flood levels.
Average Score 4.0
8.4 Overall Score
Considering the transport, ecological and civil engineering aspects of this access option, Option 3 has an
overall score of 9.6.
510119 13 September 2013 Cardno 13 September 2013
Prepared for Northbrook Corporation Pty Ltd Page 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.