Council archive · source document
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
510119 Noosa on Weyba - Holistic Traffic Access Assessment
1 2 3 4 5
Scoring System
Very poor Poor Neutral Good Excellent
Option 1 Option 1a Option 2 Option 2a Option 3 Option 3a Option 4 Option 4a Option 5 Option 5a Option 6 Option 6a
Using existing As for Option 1 but Left in/Left out As for Option 2 but Staggered As for Option 3 but Roundabout As for Option 4 but Roundabout As for Option 5 but As for Option 5, As for Option 6
Criteria Tidswell Road and with a connecting intersection on with a connecting crossroad with a connecting access from with a connecting access from with a connecting Hollet Road West but with a
Hollet Road road underpass each side of road underpass intersection on road underpass Walter Hay Drive, road underpass Walter Hay Drive road underpass removed and connecting
alignments Walter Hay Drive Walter Hay Drive no Tidswell Rd replaced with road
internal road underpass
Traffic and Transport
Connectivity – Private Vehicles
How easily does this access option
provide connectivity between the two sides 1 2 1 4 3 4 2 3 5 5 5 5
of the development and provide
connectivity to the wider road network.
Connectivity – Public Transport
The ability to provide a realistic and 1 3 2 5 4 5 1 1 4 5 4 5
suitable layout for public transport with this
access option.
Residential Amenity
The impact that this access option will 1 1 2 4 4 4 3 4 4 4 4 4
have on the amenity of the surrounding
residential areas and road networks.
Pedestrian and Cycle Connectivity
How conducive the proposed access 4 4 4 4 4 4 2 2 4 5 4 5
solution is to encouraging the use of
Active Travel Modes
Delay to Traffic on Walter Hay Drive
A high level estimate of the impact that an 5 5 4 4 3 3 2 2 3 3 3 3
access of this type will have on traffic
capacity of Walter Hay Drive.
Average Score 2.4 3.0 2.6 4.2 3.6 4 2.0 2.4 4.0 4.4 4.0 4.4
Ecology
Habitat Loss
The impact that each option will have on
the extent of wildlife habitat in the locality. 1 1 2 2 2 2 4 4 2 2 3 2
The rating of the option is inversely related
to the associated extent of vegetation and
habitat clearance.
Habitat Fragmentation
The impact that each option will have on
the movement of native wildlife between 1 1 2 1 2 1 4 3 2 1 2 1
areas of high value bushland that is
dissected by the road option.
Road Mortality
The relationship between traffic volumes 1 1 2 2 2 2 4 4 3 3 3 3
and velocities and the likelihood of wildlife
mortality (and morbidity).
Average Score 1.0 1.0 2.0 1.7 2.0 1.7 4.0 3.7 2.3 2.0 2.7 2.0
Civil Engineering
Cost
The economic cost of the roadworks and 4 1 4 1 4 1 5 1 3 1 4 1
associated infrastructure. Highest cost will
equal the lowest number.
Stormwater
The effect of the road on the stormwater 3 3 4 4 4 4 5 5 4 4 4 4
and flooding aspects of the site.
Average Score 3.5 2.0 4.0 2.5 4.0 2.5 5.0 3.0 3.5 2.5 4.0 2.5
TOTAL 6.9 6.0 8.6 8.4 9.6 8.2 11.0 9.1 9.8 8.9 10.7 8.9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.