Council archive · source document
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Table 3-4 Transport Rationalisation – Options 3 and 3A
Option 3 Option 3A
Advantages Disadvantages Advantages Disadvantages
Full access for both Some delay for traffic on Full access for both Requires construction of
sites to Walter Hay Walter Hay Drive from sites to Walter Hay the upgrade of the
Drive vehicles entering and Drive underpass and
exiting at the two connecting links
accesses
Opportunity for Public transport services Full connectivity for both Some delay for traffic on
pedestrian and cycle will require turnaround sites via the underpass Walter Hay Drive from
facilities connecting both movements to fully vehicles entering and
sides of the service both sides of the exiting at the two
development development accesses
Opens up opportunities Opportunity for
for public transport pedestrian and cycle
service improvements facilities connecting both
based upon reasonable sides of the
extensions to existing development
services
Facilitates east-west Opens up opportunities
connectivity across for public transport
Walter Hay Drive service improvements
although this may be based upon reasonable
counter-intuitive extensions to existing
services
Allows for convenient Allows for convenient
connectivity to the connectivity to the
broader road network broader road network
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.