Council archive · source document
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Table 3-5 Transport Rationalisation – Options 4 and 4A
Option 4 Option 4A
Advantages Disadvantages Advantages Disadvantages
Allows for convenient All lots on the eastern Allows for convenient All lots on the eastern
connectivity to the side are have access connectivity to the side are have access
broader road network limited to one location, broader road network limited to one location,
given the large number given the large number
of dwellings this may of dwellings this may
cause congestion cause congestion
Opportunity for Public transport could Full connectivity for both Some delay for traffic on
pedestrian and cycle only serve the sites via the underpass Walter Hay Drive from
facilities connecting both development via two the addition of the
sides of the dead end catchments. roundabout
development This does not allow for
sufficient public
transport connectivity
Improved connectivity Some delay for traffic on Opportunity for Public transport services
between development Walter Hay Drive from pedestrian and cycle will require turnaround
areas, facilitating east- the addition of the facilities connecting both movements to fully
west connectivity across roundabout sides of the service both sides of the
Walter Hay Drive development development as no
extension via Tidswell
Road is provided
Alternative north-south Requires construction of
route for pedestrians the upgrade of the
and cyclists via Tidswell underpass and
Road is not provided, connecting links
forcing users to travel
along Walter Hay Drive
Alternative north-south
route for pedestrians
and cyclists via Tidswell
Road is not provided,
forcing users to travel
along Walter Hay Drive
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.