Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Table 3-6 Transport Rationalisation – Option 5 and 5A
Option 5 Option 5A
Advantages Disadvantages Advantages Disadvantages
Improved connectivity Requires construction of Quick connection to Requires construction of
between development significant intersection external road network at significant intersection
areas, facilitating east- on Walter Hay Drive and Walter Hay Drive on Walter Hay Drive and
west connectivity across road extension along road extension along
Walter Hay Drive Tidswell Road Tidswell Road in
addition to the upgrade
of the underpass and
connecting links
Opens up opportunities Some additional delay Opens up opportunities Some additional delay
for public transport to through movements for public transport to through movements
service improvements on Walter Hay Drive service improvements on Walter Hay Drive
based upon reasonable based upon reasonable
extensions to existing extensions to existing
services services
Increasing public Public transport services Increasing public Turnaround movement
transport amenity for will require turnaround transport amenity for required for public
existing residents along movements to fully existing residents along transport servicing the
Eumarella Road service the both sides of Eumarella Road eastern side of the
the development development
Opportunity for Access provided for
pedestrian and cycle both sides of the
facilities connecting both development with little
sides of the impact on existing
development residents
Shares the traffic Opportunity for
loading thereby pedestrian and cycle
minimising the facilities connecting both
concentrated impacts sides of the
and allowing a balanced development
approach to road
construction
Maximises the Shares the traffic
connectivity achieved to loading thereby
the broader road minimising the
network concentrated impacts
and allowing a balanced
approach to road
construction
Maximises the
connectivity achieved to
the broader road
network
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd Page 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.