Council archive · source document
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
Noosa on Weyba
Revised Traffic Impact Assessment as Response to Council’s Request for Further Information
Table 4-1 Collector Street Characteristics 29
Table 5-1 Trip Generation Rates 32
Table 5-2 Design Traffic Volumes 32
Table 5-3 Noosa on Weyba Trip Distribution 33
Table 5-4 Eumundi Noosa Road/Emu Mountain Road Roundabout SIDRA Analysis 35
Table 5-5 Emu Mountain Road/Walter Hay Drive/Eumarella Road Roundabout SIDRA Results 36
Table 5-6 Walter Hay Drive/Site Access Intersection SIDRA Results 37
Table 5-7 Walter Hay Drive/Noosa Civic Shopping Centre (North) Access Roundabout SIDRA Results 38
Table 5-8 Walter Hay Drive/Eenie Creek Road Existing Roundabout SIDRA Results 39
Table 5-9 Walter Hay Drive/Eenie Creek Road Mitigated Roundabout SIDRA Results 40
Table 5-10 Summary of Intersection Performance Pre and Post Development 41
Table 5-11 Walter Hay Drive/Noosa Civic South Entrance (Stage 3) 42
Table 5-12 Travel Time Delay – Walter Hay Drive 2018 Year of Opening 46
Table 5-13 Travel Time Delay – Walter Hay Drive 2028 Design Horizon 47
Figures
Figure 2-1 Noosa on Weyba Location Plan 3
Figure 2-2 Existing Public Transport Route 4
Figure 2-3 SRC Existing Future Cycle Network 5
Figure 2-4 Aerial View of Eumundi Noosa Road/Emu Mountain Road Source: nearmap.com 7
Figure 2-5 Emu Mountain Road/Walter Hay Drive/Eumarella Drive Intersection Source: nearmap.com 7
Figure 2-6 Aerial View of Walter Hay Drive/Noosa Civic (North) Roundabout Source: nearmap.com 8
Figure 2-7 Aerial View of the Walter Hay Drive/Noosa Civic (South) Roundabout Source: nearmap.com 8
Figure 2-8 Aerial View of the Walter Hay Drive/Eenie Creek Road Roundabout Source: nearmap.com 9
Figure 3-1 Transport Planning Constraints/Opportunities 10
Figure 3-2 Access Option 1 12
Figure 3-3 Access Option 2 14
Figure 3-4 Access Option 3 16
Figure 3-5 Access Option 4 18
Figure 3-6 Access Option 5 20
Figure 3-7 Access Option 5 22
Figure 4-1 Indicative Public Transport Provision 26
Figure 4-2 Active Transport Strategy 27
Figure 4-3 Internal Intersections 28
Figure 4-4 Potential Speed Control Treatments – Tidswell Road 30
Figure 5-1 Eumundi-Noosa Road/Emu Mountain Roundabout Layout 35
Figure 5-2 Emu Mountain Road/Walter Hay Drive/Eumarella Road Roundabout Layout 36
Figure 5-3 Proposed Site Access Roundabout Layout 37
Figure 5-4 Walter Hay Drive/Noosa Civic Access Roundabout Layout 38
Figure 5-5 Walter Hay Drive/Eenie Creek Road Existing Roundabout Layout 39
Figure 5-6 Walter Hay Drive/Eenie Creek Road Mitigated Roundabout Layout 40
Figure 5-7 Walter Hay Drive/ Noosa Civic Southern Access 42
510119 Cardno September 2013
Prepared for Northbrook Corporation Pty Ltd iv
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.