Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208

of 204

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                                 Noosa on Weyba
                                         Revised Traffic Impact Assessment as Response to Council’s Request for Further Information



Drive would really be much less when considering the overall delay likely to be experienced for the wider
journey.
Figure 5-11 2028 Travel Time Impact – Walter Hay Drive – Average Journey of AM and PM Peak
Hours



                                                                           Additional
                                                                          development
                                                                       scenario travel time,
                             2028 Background
                                                                             14 sec
                            travel time, 313 sec




The delay components calculated are presented in Table 5-12 and Table 5-13 for the 2018 and 2028
scenarios, respectively.

Table 5-12 Travel Time Delay – Walter Hay Drive 2018 Year of Opening
        Delay                  N/B AM Peak                NB PM Peak                S/B AM Peak                S/B PM Peak
                                                     2018 Year of Opening
   2012 Surveyed
                                5 min 9 sec               5 min 13 sec               4 min 55 sec               4 min 57 sec
    Travel Time
   Noosa Civic
                                  5.1 sec                    3.4 sec                    3.4 sec                    5.1 sec
 Roundabout Delay
Additional BG Delay               7.4 sec                    4.0 sec                    0.5 sec                    0.5 sec
   2018 BG Travel
                               5 min 22 sec               5 min 20 sec               4 min 59 sec               5 min 3 sec
        Time
Development Access
                                  4.6 sec                    5.3 sec                    4.2 sec                    5.0 sec
 Roundabout Delay
    Speed Limit
                                  7.5 sec                    7.5 sec                    7.5 sec                    7.5 sec
  Reduction Delay
 Additional BG+Dev
                                  6.7 sec                    4.4 sec                    1.0 sec                    1.0 sec
        Delay
 Total Travel Time
                               5 min 34 sec               5 min 33 sec               5 min 11 sec              5 min 15 sec
 with Development
   Marginal Delay
    attributed to                  12 sec                    13 sec                     12 sec                     12 sec
   Development
Percentage Change                   3.7%                      4.1%                       4.0%                       4.0%




510119                                                        Cardno                                              September 2013
Prepared for Northbrook Corporation Pty Ltd                                                                             Page 46

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.