Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208

of 204

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                                 Noosa on Weyba
                                         Revised Traffic Impact Assessment as Response to Council’s Request for Further Information



remains less than the time taken via Eumundi-Noosa Road, regardless of the development access
intersection. Even so, with the development, Walter Hay Drive presents a 12.7% benefit in terms of time
saved when compared to Eumundi-Noosa Road. Hence, the addition of the development access will not
compromise Council’s intent for Walter Hay Drive.

6.5            Active and Public Transport Connectivity
Current planning practice and policies detail a public transport coverage target to ensure that 90% of
dwellings are located within 400m of a public transport service. This principal has been at the forefront of
developing a precinct layout and local street network plan for the Noosa on Weyba site. Given the location of
an existing bus route on Walter Hay Drive, the recommended strategy for the provision of public transport to
Noosa on Weyba is to provide an opportunity for this route to divert through the eastern portion of the
development and then south towards Eumarella Road and Weyba Downs. Although the need for bus
turnaround and dead end running is less efficient than a design without turnarounds, the 90% dwelling
coverage provided as part of the proposed route diversion is considered more salient.
A network of pedestrian and cycle routes are proposed within the development allowing access to key
activity nodes including the lake, rental precinct and external pedestrian/cycle infrastructure. The intent of
this high quality connectivity plan is to encourage the use of active transport modes for local trips. It is noted
that the active transport network is only in the preliminary stages and a detailed design will be issued as part
of the DA stage.




510119                                                        Cardno                                              September 2013
Prepared for Northbrook Corporation Pty Ltd                                                                             Page 51

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.