Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208

of 204

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Sunshine Coast Regional Council RFI Item                            Reference in Revised TIA
54 Provide additional detail in regard to the proposed         Provided at Section 4.1 and Figure 4-1.
public transport routes to and through the proposed
development. The detail is to include:
(a) The routes through the development site.
(b) The full extent of works necessary along Hollett Road       To be provided as part of the detailed
and Tidswell Road to provide for the various vehicle types         design process at a later date.
and road users (pedestrians, cyclists etc)
(c) Areas to be set aside for bus stops (including shelters,    To be provided as part of the detailed
bike racks etc), set down and turning areas.                       design process at a later date.
(d) Translink approval to utilise those sections of the         To be provided as part of the detailed
routes that are located within proposed common property            design process at a later date.
areas.
(e) Provide comment on the delineation between private             Refer to Civil Engineering report.
and public infrastructure in regard to public access and
ongoing maintenance responsibilities (roads, paths, car
parking areas, parks etc)
56 Demonstrate that the proposed connections from the             Refer to Vee Design Connectivity
proposed development to the external pathway network                         reporting.
are:
(a) Of a suitable urban standard to service the proposed
development (off-road and on-road only where
applicable).
57 Justify why pathways throughout the development                      Clarified at Section 4.2.
regularly terminate at roads with no continuation along the
road verge or connectivity to other pathways within the
site.
64 Submit revised plans that provide for at least a 9.4          1m cycle lanes have been provided in
metre wide carriageway (or 5 metre wide carriageways in         addition to 7.4m wide running lanes, as
each direction for divided carriageways) on the section of                stated in Section 4.3.
the Road 2 – Hollett Road connection currently proposed
as 7.4 metres wide.
65 Submit a revised layout for the proposed development          Justification for layout at Section 4.5.
east of Tidswell Road such that any collector street
connecting this development to Tidswell Road is at least
9.4 metres wide and does not have direct lot access for
as far as is necessary such that the furthest lot in the
catchment will be not more than 700 metres travel
distance from the end of this street type.
67 The traffic planning horizon adopted should be ten          The traffic assessment has accounted for
years after the completion of the construction in              2018 year of opening and 2028 ten year
accordance with normal practice.                                design horizon, as explained at Section
                                                                                  5.2
68 Provide assessments for future year operations.             Updated intersection analyses at Section
                                                                                 5.3.
69 Provide a comprehensive analysis of access options           A brief summary of the access options
which would not necessitate speed limit reductions and         analysis is included at Section 3.2, with
intersection delays on Walter Hay Drive. Council officers       the comprehensive report included at
would be available to discuss other site access options to                    Appendix G.
ensure all relevant options are tested, particularly those     Analysis of travel time delays is included
which would not add to through traffic travel time on                        at Section 5.4.
Walter Hay Drive.

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.