Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
a catchment walkability or pedshed analysis, Detailed investigation into the proposed
overlayed with the proposed street network. Such pedestrian and cycle facilities are
information is important to demonstrate how the provided in Vee Design’s submission.
proposed development will optimise future
walkable access to the proposed future dwellings,
bus services and connectivity with any other
points of attraction, within and beyond the
development.
(b) An Access and Mobility Plan for the proposed Section 4.1 and Figure 4-1 illustrate an
development including: indicative street network allowing
an indicative street network at neighbourhood cell potential future public transport
level that demonstrates any proposed public developments to serve the proposed
transport options are efficient to operate and are development.
convenient and able to be safely accessed by
future residents;
existing bus routes and amended proposed bus Figures 2-2 and 4-1 illustrate the existing
routes in accordance with the amended Traffic and potential future public transport
Impact Assessment report required in this networks which would serve the
information request; proposed development.
existing and proposed active transport Sections 2.3 and 4.2 outline the existing
(pedestrian and cycleways), including how these and proposed Active Transport Facilities.
provide accessibility to existing and proposed bus Further information is provided by Vee
routes, residential neighbourhoods and Design.
destinations within and external to the
development; and
evidence on how the proposed development will Section 4.1 outlines the potential public
support public transport provision by achieving transport provision for the proposed
minimum standards of service coverage for buses development.
by demonstrating how at least 90% of residents
will have access to an existing bus stop or a
future bus route within 400m.
(c) An Amended Traffic Impact Assessment which Section 4.1 outlines the potential public
demonstrates: transport provision for the proposed
how the development will support proposed bus development. The Holistic Report, which
routes which will maintain the efficiency and is attached at Appendix G, details the
reliability of existing service patterns. This means design balance between provision of
that the bus turnaround and dead end optimum public transport provision and
connections proposed in section 3.4 would not other design elements such as ecology
result in efficient and cost effective bus service and civil engineering design principles.
operations; and
considers and evaluates options for achieving The Holistic Report, which is attached at
potential bus routes giving consideration to the Appendix G, details access principals
surrounding future development areas and and design process utilised to provide
whether there is a possibility that the the development layout, this includes
development could connect directly into these public transport concerns.
adjoining areas.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.