LANE SUMMARY                                                                                                       Site: 12AM BG Existing
Emu Mountain Road/Eumundi Noosa Road
2012 AM Peak Hour Traffic Count
Existing Layout
Roundabout



 Lane Use and Performance
                  Demand Flows               Deg. Lane Average Level of 95% Back of Queue Lane     SL    Cap. Prob.
                L     T     R Total HV Cap. Satn Util. Delay   Service Vehicles Distance Length Type      Adj. Block.
           veh/h veh/h veh/h veh/h % veh/h     v/c  %      sec              veh        m      m             %      %
 South: Eumundi Noosa Road
                                                       6
 Lane 1         0 335       0  335 5.0 1443 0.232   93     3.1  LOS A        1.4     10.3   500     –      0.0    0.0
                                           1
 Lane 2         0    96 349    446 5.0 1782 0.250 100      9.7  LOS A        1.6     11.4   120 Turn Bay 0.0      0.0
 Approach         0   432    349     781 5.0           0.250               6.9   LOS A          1.6         11.4

 East: Emu Mountain Road
 Lane 1      243      0   0          243 5.0 1391 0.175         100        5.1   LOS A          0.9          6.5     500     –      0.0   0.0
 Lane 2        0      0 126          126 5.0 1106 0.114         100       12.3   LOS A          0.5          3.8     120 Turn Bay   0.0   0.0
 Approach       243      0   126     369 5.0           0.175               7.5   LOS A          0.9          6.5

 North: Eumundi Noosa Road
                                                                      6
 Lane 1      151     10    0         160 5.0 1225 0.131          76        5.6   LOS A          0.7          5.4     500     –      0.0   0.0
 Lane 2         0 279      0         279 5.0 1628 0.171         100        3.6   LOS A          1.1          7.7     115 Turn Bay   0.0   0.0
 Approach    151 288       0         439 5.0      0.171                    4.3   LOS A          1.1          7.7

 Intersection                       1589 5.0           0.250               6.3   LOS A          1.6         11.4


Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.

1 Reduced capacity due to a short lane effect
6 Lane underutilisation due to downstream effects

Processed: Monday, 5 August 2013 2:58:06 PM          Copyright © 2000-2011 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 5.1.5.2006                        www.sidrasolutions.com
Project: G:\510119 - Lake Weyba DA\510119 Modelling\RFI\1 Emu Mountain_Eumundi Noosa 2013 04 15.sip
8000955, CARDNO, ENTERPRISE

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.