Council archive · source document
Decision Notice - MCU22 0171 [As Published] · MCU22/0171
Property Access and Driveways
29. Vehicle access to 128 Gympie Terrace is limited to the existing access easement via Mill
Street and must be constructed generally in accordance with DME Project’s Proposed
Layout Driveway and Basement (Revision C) dated March 2023.
Car Parking
30. A minimum of 5 car parking spaces must be provided and marked on the site. The works
must be undertaken in accordance with an Operational Works approval and must include
in particular dimensions, crossfalls and gradients in accordance with Australian Standard
AS2890: Parking Facilities.
Stormwater Drainage
31. The site must be provided with a stormwater drainage system connecting to a lawful point
of discharge. The works must be undertaken in accordance with an Operational Works
approval and be generally in accordance with DME Project’s Stormwater Details (Revision
C) dated March 2023.
32. A site-specific Dewatering and Acid Sulfate Management Plan must be submitted and
accepted by Council prior to the issue of an Operational Works permit. The site-specific
Dewatering and Acid Sulfate Management Plan must be prepared by a suitably qualified
person and demonstrate how Acid Sulfate affected water encountered during excavation
will be treated and disposed of.
33. A clause must be included in any future Community Management Statement that states:
a. the ongoing maintenance of the basement sump is wholly the responsibility of the
property owner(s).
Services
34. Unless otherwise stipulated by telecommunications legislation at the time of construction,
the development must be provided with all necessary conduits, pits and pipes to
accommodate the future connection of optic fibre technology telecommunications.
35. Certification must be submitted to Council from all relevant service providers (Energex,
NBN and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
36. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
37. All easements must be designed in accordance with the planning scheme and granted at
no cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
38. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
39. All works must be carried out in accordance with a Geotechnical Report (or part thereof)
prepared by a qualified person* and endorsed through an Operational Works approval.
*(Refer to Advisory Note)
Earthworks and Retaining Walls
40. All fill and associated batters must be undertaken in accordance with an Operational Works
approval, contained entirely within the subject site unless written permission from the
respective landowner(s) is provided to Council and be generally in accordance with DME
Project’s Earthworks Sections 1 and 2 (Revision B and C, respectively) dated March 2023.
Page 5 of 8
Document Set ID: 22375366
Version: 3, Version Date: 19/04/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - MCU22 0171 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 159 KB (small file)
- File type
No other editions are linked here.