Council archive · source document
SUPERSEDED Decision Letter - Change to an Existing Approval - 010.2003.00221157.002 [As Published] · 132003.221157.2
Officer: Tracy Jones
Direct Telephone: (07) 5449 5228
Response Address: Locked Bag 72
Sunshine Coast Mail Centre QLD 4560
Email: [email protected]
Our Reference: 23648 DA
Your Reference: 01090
19 August 2009
Melda Investments Pty Ltd
CARE Martoo Consulting Pty Ltd
PO Box 1684
NOOSA HEADS QLD 4567
Dear Madam
Change to an Existing Approval
Integrated Planning Act 1997
I refer to your request to make a change to an existing approval. On 17 August 2009 Council decided
your requested changes.
Details of the decision with the consolidated conditions are as follows:
1 APPLICATION DETAILS
Application No: 23648 DA
Street address: 33 Douglas Street, Sunshine Beach
Real property description: Lot 324 RP 48111
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
Council on 30 June 2005 decided to issue the following type of approval:-
Material Change of Use - Non Conforming Dwellings
In relation to your request to extend the relevant period for the above development approval, Council
on 17 August 2009 decided to:
A. Extend the relevant period until 30 June 2013
B. Approve to change conditions 1 & 13
C. Issue a Change to an Existing Approval.
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
Page 1 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 10 pages
Page 2
2003/221157
4 ASSESSMENT MANAGER CONDITIONS
Land Use
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are labelled: Proposed Residence – Lot
324 Douglas Street: Site Plan, Garage Floor Plan, Ground Floor Plan, First Floor Plan, Lower
Roof Plan, Upper Roof Plan, Sections A & B, Section C, Elevation 1, Elevations 2 & 4,
Elevation 3, Douglas Street Elevations, Lane Elevations and Northeast Elevation; numbered:
A-01B, A-02B, A-03B, A-04A, A-05A, A-06B, A-07B, A-08A, A-09A, A-10A, A-11A, A12A,
A13A, dated 1/12/2003 and A16A dated Nov 2004 and as amended, prepared by Middap
Ditchfield Architects Pty Ltd and as may be amended by these conditions.
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably
qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to
the premises being occupied and maintained at all times thereafter. The landscape plan is to
clearly indicate and include: -
3.1. 1 x 100 Litre native coastal tree to be planted in the setback area in the southeast
corner at the front of the subject site;
3.2. 1 x 100 Litre native coastal tree to be planted in the setback area in the southern
corner at the front of the subject site;
3.3. 1 x 100 Litre native coastal trees to be planted in the setback area in the northwest
corner of the site. The length of the pool is to be reduced to accommodate this
species;
3.4. The two large mature paper bark trees in the road reserve in front of the subject site
are to be retained and protected. An arborist’s report shall be submitted with the
application for Operational Works addressing the retention of the above trees;
3.5. Screening vegetation in the form of native coastal trees and shrubs with understorey
plantings is required to be planted in the setback areas, to include a mix of plant
species ranging up to 45 litres.
4. All fencing shall be setback at least 1 metre from the front property boundary, with at least half
of the fencing setback 2 metres. The area of land between the fence and the front property
boundary shall be densely landscaped to screen any fencing from the street.
5. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use. These landscape
plans required to be submitted are to denote areas of existing vegetation or existing trees
proposed or required to be retained.
6. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
6.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
6.2. Disposal for firewood.
6.3. Disposal for landscaping purposes.
Page 2 of 11
Page 3
2003/221157
6.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
6.5. The disposal method for clearing works is to be submitted in conjunction with an
application for a Development Permit for Operational Work. The Applicant is advised
that other methods may be considered provided full details of the method are
submitted.
6.6. The Applicant is advised that burning off is an unacceptable method of disposal.
7. The northeastern wall of the building is to incorporate a mixture of materials including timber
boards and pre-cast concrete wall panel.
8. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
9. Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
thus remaining as open structures.
10. The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
Dishwashers and washing machines are excluded from this requirement.
11. Security in the form of a cash bond or trading bank guarantee to the sum of $5000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
12. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
13. The Development Permit for a material change of use of premises lapses if the use has not
happened by 30 June 2013, unless an application to extend the currency is approved by
Council.
14. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
Building Services
15. An identification survey of the subject site is to be carried out by a Licensed Surveyor and is to
be submitted to Council at the time of foundation inspection or immediately thereafter. Such
survey shall set out the boundaries of the site and the position of the buildings on the site.
16. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum building height above natural surface, required by the provisions of the Planning
Scheme.
17. The plans submitted for a Development Permit for building works on each allotment are to
comply with the following: -
17.1. The maximum height of each garage within 0.75 metres of the applicable side
boundary shall not exceed 4.5 metres.
17.2. The mean height as above shall not exceed 3.5 metres.
Page 3 of 11
Page 4
2003/221157
17.3. The side walls of the garages and the alcoves, closer than 0.75 metre from a side
boundary shall be of “maintenance free” construction to comply with the requirements
of Part 11 of the Queensland Development Code.
17.4. The rooftop pergolas shall remain unroofed and unenclosed at all times.
Land Development
Vehicle Access
18. A vehicular access driveway to serve each allotment shall be constructed from the Douglas
Street frontage of the site to a maximum width of 3.5 metres.
19. The driveway shall be designed and constructed to Council’s design standards and to grades
that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
movements along the footpath without any level difference. Should any driveways be
constructed to grades that do not comply with AS2890.1-2004, Council will require that the
driveway be removed and reconstructed to levels that do comply.
Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
to have the footpath continue at a constant grade to minimise the potential for pedestrians to
trip or fall.
Carparking
20. Carparking shall be provided within the sites as shown on the stamped approved plans.
21. A minimum of 2 covered carpark spaces shall be provided on each site.
22. The carparking areas shall be designed to comply with the provisions of AS 2890.1-2004 for
user class 1A with a minimum head clearance (headroom) at any point of 2.2m.
Vegetation Protection
23. Vehicular pavements within the drip zone of any existing trees to be retained or new trees to
be planted shall be designed as a pervious pavement (such as grass paving cells or similar),
as this will allow water that falls on this surface to penetrate to the trees root system. The
pavement shall be constructed so as not to damage the tree or their root system and in this
regard temporary fencing shall be provided around the trees during construction to help
protect them.
Plans shall be submitted to the Council for approval that clearly show the type and extent of
the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
Operational Works.
Roadworks Contributions (Local Road Network)
24. A roadworks contribution of $627 towards the future upgrading of the local road network shall
be paid to the Council prior to obtaining a Development Permit for Operational Works. This
amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from
March 2005 until the date of payment.
Frontage Works
25. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
Douglas Street frontage of the site in accordance with Planning Scheme Policy PSP1
Landscaping Guidelines. Grass shall be couch, free of weeds.
26. A new 1.2m wide concrete path shall be constructed along the Douglas Street frontage of the
site in accordance with Council’s design standards and to an alignment that protects any
significant vegetation or any underground services.
27. All paths shall be designed and constructed to ensure pedestrian safety using non-slip
materials and to produce an evenly graded surface finish.
Page 4 of 11
Page 5
2003/221157
28. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
footpath paving and landscaping such as trees and grasses in accordance with Council’s
Standard specifications prior to commencement of the use permitted by this permit.
Pathway Contributions
29. A pathway contribution of $168 towards external major pathways, in accordance with Planning
Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior
to obtaining a Development Permit for Operational Works. This amount will be subject to
variations in the Consumer Price Index, All Groups Brisbane from March 2005 until the date of
payment.
Stormwater Drainage
30. All stormwater drainage shall be collected on site and discharged so there is no net increase
in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall
be discharged to Council’s kerb & channel street drainage system in Douglas Street. Plans of
the drainage design shall be prepared by a Registered Professional Civil Engineer and
submitted to Council prior to obtaining a Development Permit for Operational Works. The
maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
drainage system at any one location is 25 litres/second.
31. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
32. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
33. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
Earthworks
34. If any filling works are required on site, it shall be carried out in accordance with Section 3.8 of
Council’s Engineering Design Standards Manual and so as not to cause the additional
ponding of water on any adjoining lands or the blockage of, or interference with, any natural
watercourses.
This may require the design and construction of drainage pipes and/or an overland flow-path
within the development site that caters for drainage from the adjoining sites for a design storm
with an Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of
Water encompassing the drainage pipes or overland flow-path will also be required. In this
regard a Development Permit for Operational Works shall be obtained.
Should evidence be provided to Council indicating that no additional ponding of stormwater will
occur on the adjoining properties the requirement for the drainage pipes, overland flow-path
and easement shall not apply.
35. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences or structures that border the development site. Fences that are affected shall be
replaced prior to Final Building Approval. In this regard any fences to be replaced shall be
clearly shown on the plans submitted for Operational Works approval.
Erosion and Sediment Control
36. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
Page 5 of 11
Page 6
2003/221157
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
General
37. For the following classes of work associated with development, a Development Permit for
Operational Works must be obtained prior to commencement of works relating to that class of
work. The application may combine any or all of these classes of work:-
37.1. Access and/or Carparking.
37.2. Site Civil Works.
37.3. Stormwater Drainage.
37.4. Frontage Works.
37.5. Earthworks.
37.6. Excavation of materials to fill another site.
37.7. Landscaping.
38. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be
submitted in conjunction with an application for a Development Permit for Operational Works.
In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
submitted in conjunction with any application for Operational Works.
39. Digital detailed design drawings and calculations shall be submitted with any application for a
Development Permit for Operational Works in respect of roadworks and stormwater drainage
works. To avoid conflict with underground pipes or services, all existing and proposed
services required by the development shall be shown on the plans.
40. To facilitate production of As Constructed drawings it is suggested that all design drawings are
submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
use of ADAC are available at www.adac.com.au).
41. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
42. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
43. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
44. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
type of all services and structures. All of which shall be submitted to Council for checking and
for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
are available at www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been supplied
and accepted by Council
Page 6 of 11
Page 7
2003/221157
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
A-01B Site Plan - prepared by Middap 1/12/2003
Ditchfield Architects Pty Ltd
A-02B Garage Floor Plan - prepared by 1/12/2003
Middap Ditchfield Architects Pty Ltd
A-03B Ground Floor Plan - prepared by 1/12/2003
Middap Ditchfield Architects Pty Ltd
A-04A First Floor Plan - prepared by Middap 1/12/2003
Ditchfield Architects Pty Ltd
A-05A Lower Roof Plan - prepared by Middap 1/12/2003
Ditchfield Architects Pty Ltd
A-06B Upper Roof Plan - prepared by Middap 1/12/2003
Ditchfield Architects Pty Ltd
A-07B Sections A & B - prepared by Middap 1/12/2003
Ditchfield Architects Pty Ltd
A-08A Section C - prepared by Middap 1/12/2003
Ditchfield Architects Pty Ltd
A-09A Elevation 1 - prepared by Middap 1/12/2003
Ditchfield Architects Pty Ltd
A-10A Elevations 2 & 4 - prepared by Middap 1/12/2003
Ditchfield Architects Pty Ltd
A-11A Elevation 3 - prepared by Middap 1/12/2003
Ditchfield Architects Pty Ltd
A12A Douglas Street Elevations - prepared 1/12/2003
by Middap Ditchfield Architects Pty Ltd
A13A Lane Elevations - prepared by Middap 1/12/2003
Ditchfield Architects Pty Ltd
A16A Northeast Elevation - prepared by Nov 2004
Middap Ditchfield Architects Pty Ltd
Page 7 of 11
Page 8
2003/221157
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Advice
1. Approval of this development application will trigger an Infrastructure Charge in accordance
with the Coastal Major Road Network Infrastructure Charges Plan for the estimated amount of
$1,716. This amount will subject to variations in the Consumer Price Index, All Groups
Brisbane from March 2005 until the date of payment. An Infrastructure Charge Notice will be
issued in accordance with Chapter 5 of the Integrated Planning Act 1997.
2. Payment via credit card transaction will not be an acceptable method of payment for
development contributions conditioned in this permit or for infrastructure charge notices issued
separately.
3. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
3.1. On a Sunday or public holiday, at any time; or
3.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
4. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
the cost of operational works exceeds $80,000, then a portable long service leave levy is
required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
the approved form issued by the Building and Construction Industry (Portable Long Service
Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
declaration outlining the cost of the operational works must be submitted to Council with the
lodgement of any application for operational works over the site.
5. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where
it could reasonably be expected to move into a roadside gutter, stormwater drain or a water
course. On the spot fines apply for such offences
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
Page 8 of 11
Page 9
2003/221157
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building Works All Building Works
Development Permit for Operational Works Landscaping, car parking and access, frontage works,
stormwater drainage and filling of the site
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Not applicable
12 SUBMISSIONS
Not applicable
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
15 OTHER DETAILS
Please note that an Infrastructure Charge in accordance with the Coastal Major Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Decision Notice History
30 June 2005 - Original Decision Notice.
17 August 2009 - Extend the relevant period & approve a change to Conditions 1 & 13
Yours faithfully,
Tracy Jones
SENIOR DEVELOPMENT PLANNER
Page 9 of 11
Page 10
2003/221157
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated (6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
for the application are not available against the part of
Division 8 - Appeals to court relating to the approval that represents the concurrence agency’s
development applications response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following- jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development development approval for a development application if-
application; (a) the development application involves impact
(b) a matter stated in a development approval, including assessment; and
any condition applying to the development, and the (b) the advice agency told the applicant and the
identification of a code under section 3.1.6;1 assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for; (2) The appeal must be started within 20 business
(d) the length of a relevant period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal. submitter.
(2) An appeal under subsection (1)(a) to (d) must be Appeals for matters arising after approval given
started within 20 business days (the “applicant’s appeal
(co-respondents)
period”) after the day the decision notice or negotiated
decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
development application, a person to whom any of the
(3) An appeal under subsection (1)(e) may be started
following notices have been given may appeal to the
at any time after the last day a decision on the matter
court against the decision in the notice-
should have been made.
(a) a notice giving a decision on a request for extension
Appeals by submitters
of the relevanrt period for an approval;
4.1.28.(1) A submitter for a development application may
(b) a notice giving a decision on a request to make a
appeal to the court about-
minor change to an approval.
(a) the giving of a development approval, including any
(2) The appeal must be started within 20 business
conditions (or lack of conditions) or other provisions
days after the day the notice of the decision is given to
of the approval; or
the person.
(b) the length of a relevant period for the approval.
(3) Subsection (1)(a) does not apply if the approval
(2) The appeal must be started within 20 business resulted from a development application (superseded
days (the “submitters appeal period”) after the day the planning scheme) that was assessed as if it were an
decision notice or negotiated decision notice is given to application under a superseded planning scheme.
the submitter.
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the against a deemed refusal of the request.
decision.
(5) An appeal under subsection (4) may be started at
(4) If an application involves both impact assessment any time after the last day the decision on the matter
and code assessment, appeal rights for submitters are should have been made.
available only for the part of the application involving
impact assessment. Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application (no co-respondents)
are available only for the aspects of the development that 4.1.31.(1) A person to whom any of the following notices
would have required public notification under the have been given may appeal to the court against the
repealed Act. decision in the notice-
(a) a notice giving a decision on a request to change or
cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local
planning instrument)
Page 10 of 11
Page 11
2003/221157
(b) a notice under section 6.1.442 giving a decision to (c) the decision to give a preliminary approval when a
change or cancel a condition of a development development permit was applied for;
approval. (d) the length of a period mentioned in section 3.5.21
(2) The appeal must be started within 20 business relevant period;
days after the day the notice of the decision is (e) a deemed refusal.
given to the person.
(2) An appeal under subsection (1)(a) to (d) must be
(3) Also, a person who has made a request started within 20 business days (the “applicant’s appeal
mentioned in subsection (1)(a) may appeal to the period”) after the day the decision notice or negotiated
court against a deemed refusal of the request. decision notice is given to the applicant.
(4) An appeal under subsection (3) may be started at (3) An appeal under subsection (1)(e) may be started
any time after the last day the decision on the at any time after the last day a decision on the matter
matter should have been made. should have been made.
Appeals against decisions to change approval conditions The Registrar for the Building and Development
under the repealed Act Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court 4.1.36 Appeals about particular infrastructure
against- charges
(a) the decision; or (1) This section applies to a person who has been
(b) a deemed refusal of the application. given, and is dissatisfied with, an infrastructure charges
notice or a regulated State infrastructure charges notice.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of (2) The person may appeal to the court against the
the decision is to be given to the person. notice.
(3) An appeal under subsection (1)(b) may be started (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter after-
should have been made. (a) if the notice is given because of a development
Appeals against local laws approval or master plan approval-the day the
applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a
approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the (b) otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the (4) An appeal under this section may only be about-
planning scheme may appeal to the court against the
(a) whether a charge in the notice is so unreasonable
decision or the conditions applied. that no reasonable relevant local government, State
(2) The appeal must be started within 20 business infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the have imposed it; or
applicant.
(b) an error in the calculation of the charge.
For Building Works Only (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the under this section can not be about the methodology
Integrated Planning Act 1997 as follows: used to establish the charge in the relevant infrastructure
Division 3 – Appeals to tribunals relating to charges schedule or regulated State infrastructure
development applications charges schedule.
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval, including
any condition applying to the development, and the
identification of a code under section 3.1.6;3
2
Section 6.1.44 (Conditions may be changed or
cancelled by assessment manager or concurrence
agency in certain circumstances)
3
Section 3.1.6 (Preliminary approval may override local
planning instrument)
Page 11 of 11
Used in these records
SUPERSEDED Decision Letter - Change to an Existing Approval - 010.2003.00221157.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 71 KB (small file)
- File type
No other editions are linked here.