Powerlink (advice agency) response - MCU2/0184
Very large file: it may take a few minutes
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
A Material Change of Use not associated with Reconfiguring a lot if:
)> Any part of the premises is subject to an Easement in favour of a Distribution
Entity or Transmsission Entity under the Electricity Act 1994 and the Easement is
for a transmission grid or distribution supply network under that act; and
)> any structure or work that is the natural and ordinary consequence of the use is,
or will be, located wholly or partly in the Easement; or
)> any part of the premises is situated within 100 metres of a substation site; and
. Operational work that is filling or excavation, not associated with reconfirguring a lot,
if:
)> any part of the premises is subject to an Easement in favour of a Distribution
Entity or Transmission Entity under the Electricity Act 1994 and the work is
located wholly or partly in the Easement; or
)> the work is located wholly or partly within 10 metres of a substation site.
Being an Advice Agency means that even though local authority or private certifier approval
is forthcoming, Powerlink’s ~dvice on certain activities will still be required. This advice is
required in addition to Powerlink’s consent.
4.2.2 Local Authority Approval
Powerlink’s consent must be sought for the dedication of a Road Reserve on land covered
by its easements.
5. APPLICATIONS FOR EASEMENT CO-USE
Powerlink has responsibility for safe and continuous operation of the transmission network
and requires access for maintenance, repair, replacement and renewal. It is essential that
Powerlink’s access along the Easement is not obstructed. Therefore buildings, structures or
other objects should not be placed on an Easement.
Powerlink also places high priority on public safety. For the safety of property owners and
members of the public, activities which may create a public safety risk should not occur on
the Easement. Such risks could possibly arise from induction, step or touch potentials under
fault conditions, infringement of safety clearances to conductors or uncovering the structure’s
earthing system.
Easement conditions give Powerlink the right to construct, maintain, operate, re-construct
and dismantle assets on the Easement and to allow vehicle access along the Easement.
Some Easement conditions also allow access from the nearest public road across a property
containing an Easement.
5. 1 Assessment Considerations
When evaluating co-use applications on Easements, Powerlink will also consider probable
future plans for augmentation or reconstruction of transmission lines to ensure the co-use
applications do not jeopardise future Powerlink plans for the Easement.
In the assessment of a request for a:
)> co-use;
)> Material Change of Use;
)> Reconfiguration of a lot; or
)> operational work
Page 6 of 14 Management of Easement Co-use Requests Guideline Updated 06 September 2010 Version 6.0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.