                      Landscaping Works
               20.    The development site must be landscaped in accordance with the PSP2 – Landscaping. The
                      works must be undertaken in accordance with the Noosa Plan for that specific area and must
                      include in particular:
                      a.      a minimum 2 metre landscape setback on the front boundary, excluding driveway
                              areas;
                      b.      the works generally shown on the approved landscape plan except where varied by
                              the conditions of this approval;
                      c.      planting of shrubs and trees to the site’s frontage that will visually frame and soften the
                              presentation of the built form to the street;
                      d.      provision of screen planting along the side and rear boundaries to protect the privacy
                              of adjoining properties;
               21.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
                      Waste Management
               22.    A waste storage area must be provided in accordance with Planning Scheme Policy 9, Waste
                      Management and the Noosa Plan’s Waste Management Code, including an external
                      imperviously paved area correctly sized for all refuse and recycling containers and suitably
                      screened from public places and neighbouring properties.
                      Community Management Statement
               23.    Any proposed Community Management Statement required for the development pursuant to
                      the Body Corporate and Community Management Act 1997 must be submitted to Council for
                      endorsement at the same time as submission of the Building Format Plan (or similar) to
                      Council for compliance assessment.
               24.    All clauses and by-laws of the proposed Community Management Statement must accord
                      with the requirements of this Decision Notice and, in particular, must include the following
                      additional clauses:
                      a.      The dwelling units are not permitted to be used for short term accommodation, unless
                              where identified as accepted development by the Noosa Plan or where there is a
                              Development Permit for Material Change of Use for Short Term Accommodation in
                              effect. Short term accommodation means the use of the premises for providing
                              accommodation of less than 3 consecutive months to tourists or travellers.
               ENGINEERING
                      Bonds
               25.    A site compliance bond of $50,000 is to be submitted to Council prior to the pre-start meeting.
                      The pre-start meeting will only be held once Council's Construction Engineering Officer has
                      confirmation that the bond monies have been received by Council.
                      The bond will be refunded less any costs incurred by Council in ensuring compliance with
                      these conditions or any additional inspections incurred for substandard work or work
                      undertaken not in accordance with this permit.
               26.    Bonds must:
                      a.      meet the requirements of council’s relevant Planning Scheme Policy for performance
                              and uncompleted works;
                      b.      be lodged with Council and accompanied by the Bond Administration Fee/s; and
                      c.      be requested for release by writing to Council, when relevant approval requirements
                              have been met.


                                                                                                          Page 4 of 16
Document Set ID: 24236900
Version: 4, Version Date: 22/10/2025

Used in these records

About this file

File size
208 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - MCU22 0196 01 & OPW22 0295 01 (As Published).pdf · 208 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.