Skip to the record
Every meeting, every word.

Original source · versioned page text

2016-06-07 - Planning & Environment Committee Agenda

of 60

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      7 JUNE 2016


The applicant’s description of the proposal includes:

On site storage, production kitchen and administration provide for the operation of the Kitchen
Shed’s primary business which is wholesaling food and beverage directly to restaurants, off site
function and event catering, production kitchen for Gaston’s restaurant, and the provision of such
product from onsite as a shop / café with seating for up to 10 persons.

The shop as defined provides the opportunity for the product produced or wholesaled from
Kitchen Shed to be available for customers to purchase and if they choose sit on site and
consume. Provision has been made for up to 10 chairs and a table to enable this to occur.

Hours of operation for the shop are from 7am – 3pm Monday to Friday, to coincide with the
worker activity within the Lionel Donovan Drive precinct. You are able to purchase a coffee,
freshly baked product or sandwich and takeaway or eat on site. This use as a shop is ancillary to
the primary focus of the industrial use and as such only uses 19.7m2 [subsequently amended to
14.7m2] of the Gross Floor Area of the development.

An extract from the proposal plan is shown in Figure below, with the green and pink areas
nominated by the applicant as the shop use areas and the balance being the compliant industrial
floor space. Note the tenancy is 232m2 in total and includes an upper floor office and storage
area.




                                Figure 1 – Proposal Plan Extract

The full proposal plan is included as Attachment 1. No additional works are proposed, with the
shop fitout already complete. A photograph of the existing retail shop component is shown in
Figure 2 below. The application also seeks a reduction in the application fee, as detailed later in
this report.




                                                                                    Page 29 of 65
Log in to download the original file

2016-06-07 - Planning & Environment Committee Agenda(PDF, 15MB).pdf · 15.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.