Removal Complete tree removal leaving stump as close as possible to ground level. Process will include chipping of
all foliage limbs and timber and re-instatement of work site. Recommendation typically based on tree
being assessed as representing a health and safety concern [Dead, dying, structurally unsound, unstable,
poor form].
Remove and Grind Complete tree removal to include grinding of stump to a depth of 75 millimetres unless otherwise
specified. Process will include chipping of all foliage limbs and timber and reinstatement of work site.
Stump site will be cleaned of all grinding debris and sawdust and backfilled with premium topsoil free from
weeds.
General Pruning Pruning process will include removal of broken, crossing, rubbing, diseased, stressed or dying branches or
limbs with poor attachment. Additional work process will include pruning to define leaders, balance the
crown, reduce the weight load or clear the tree from obstructions. In summary, to rectify, as far as is
possible, any structural defects and eliminate undesirable growth.
Canopy Lift / Raise Pruning process will be restricted to raising of the tree’s lower canopy to a height specified the defaulted
parameters will be to provide 2.5 metres clearance from ground level. From time to time pruning
requirements may be altered to accommodate various factors such as view, light penetration, vehicle
thoroughfare etc and consulting arborist will advise accordingly.
Remedial Pruning Pruning process will encompass crown restoration and remedial works where the tree has been previously
lopped or otherwise damaged. Not feasible when tree has extensive decay and should only be considered
when there is evidence of healthy regrowth. When performed correctly, the process of remedial pruning
will most likely take several years to complete.
Hanger Limb Pruning process will be restricted to the removal of any hangers or dangerous/dead/dying limbs and will
typically involve the removal of a single limb. In some instances, removal of an individual limb may be
necessary to accommodate an obstruction and the consulting arborist will advise accordingly.
Directional Pruning Pruning process will be restricted to pruning canopy away from buildings/service wires/property boundary
and will typically be performed to avoid future growth in these areas [where necessary clean trunking of
undesirable growth]. Where appropriate future growth will be directed away from obstruction selecting
new leaders.
Boundary Pruning Pruning process will involve pruning of tree back to tree owners’ boundary. In every situation every effort
should be made to obtain the relevant authorisation to perform pruning to Australian Standards and to
avoid “lopping” limbs to the immediate boundary. As with directional pruning, optimum results will be
achieved when it’s feasible to eliminate undesirable growth and direct future growth. If authority to enter
and work in neighbouring property is not forthcoming processes will be restricted to access on clients
property and work standards will be appropriately comprised. Consulting arborist will duly advise client as
appropriate.
Arborist Report for 28 Eenie Creek Road, Noosaville
Prepared by Arbor Operations – July 2020
15 | P a g e
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.