Original PDF page 145, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
G) Earthworks and Construction Phase

                    1.   The Contractor shall ensure that to the extent possible
                         project infrastructure and auxiliary works (laydown areas,
                         stockpile sites, site office) are constructed in a manner that
                         does not create additional hazards for wildlife.
                    2.   Inspect open trenches, culverts and other structures prior
                         to works being undertaken within an area to determine
                         whether there are any trapped or injured native fauna
                         species present and act as appropriate.
To reduce the       3.   Educate staff, including sub-contractors, in relation to the
impact the                                                                                Construction
                         risk of fauna injury and deaths and how to manage animals                        Clearing Works
project has on                                                                            Crew
native fauna             which are displaced, including threatened species
                    4.   All native wildlife is protected (including snakes) and shall
                         not be intentionally harmed as a result of work or workers
                         actions.
                    5.   The Contractor is obliged to ensure that any fauna injured
                         during construction should be promptly treated by a
                         veterinarian. Any fauna that are injured or killed during
                         construction by actions related to the contract shall be
                         reported as an environmental incident.




     5. Conclusion
     Australia Wide Environmental Consultants (AWEC) were commissioned by Stockwell Development
     Group Pty Ltd to compose a Fauna Management Plan for the Noosa Civic on Walter Hay Drive in
     Noosaville, Queensland (See Figure 1).

     The aim of this Fauna Management Procedure is to outline the fauna management measures that are
     to be implemented pre, during and post clearing works. The fauna management measures in this
     procedure are designed to minimise the impact that this development will have on any fauna occupying
     or utilizing the site.

     All the fauna management measures need to be adhered to throughout the clearing, earthworks and
     construction phases of this project in order to minimise the impact on native fauna.




                                                                                                         28 | P a g e
Log in to download the original file

SUPERSEDED Compiled Plans OPW20_0145.02.pdf · 48.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.