Log in to see the plans as drawnG) Earthworks and Construction Phase
1. The Contractor shall ensure that to the extent possible
project infrastructure and auxiliary works (laydown areas,
stockpile sites, site office) are constructed in a manner that
does not create additional hazards for wildlife.
2. Inspect open trenches, culverts and other structures prior
to works being undertaken within an area to determine
whether there are any trapped or injured native fauna
species present and act as appropriate.
To reduce the 3. Educate staff, including sub-contractors, in relation to the
impact the Construction
risk of fauna injury and deaths and how to manage animals Clearing Works
project has on Crew
native fauna which are displaced, including threatened species
4. All native wildlife is protected (including snakes) and shall
not be intentionally harmed as a result of work or workers
actions.
5. The Contractor is obliged to ensure that any fauna injured
during construction should be promptly treated by a
veterinarian. Any fauna that are injured or killed during
construction by actions related to the contract shall be
reported as an environmental incident.
5. Conclusion
Australia Wide Environmental Consultants (AWEC) were commissioned by Stockwell Development
Group Pty Ltd to compose a Fauna Management Plan for the Noosa Civic on Walter Hay Drive in
Noosaville, Queensland (See Figure 1).
The aim of this Fauna Management Procedure is to outline the fauna management measures that are
to be implemented pre, during and post clearing works. The fauna management measures in this
procedure are designed to minimise the impact that this development will have on any fauna occupying
or utilizing the site.
All the fauna management measures need to be adhered to throughout the clearing, earthworks and
construction phases of this project in order to minimise the impact on native fauna.
28 | P a g e
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.