Original source · versioned page text
SUPERSEDED Compiled Plans OPW20/0145.02
Plans and drawings: the text below has words only, no drawings.
Very large file (48.8 MB): may take a few minutes to open.
Original PDF page 172, section 1. The text section number identifies this passage in the reader.
1 2 3 4 5 6 7 8 9 10 11 12
0
P10
NBN SYMBOL LEGEND
PIT-002
5
55.
7
Transformer / Kiosk / Pad Mount
60.1
A PWR A
Sub-station / Pole Mount Transformer
PIT-ID Network Boundary/Local Network Pit
5 (Single Lid) (700mmX450mmX650mm)
P100
2
PIT-ID
PRIVATE ROAD
P50
9.8
Distribution/Local Network Connection Pit
PIT-0
03
P100
8 (1360mmX555mmX860mm)
8
B
PIT-ID Fibre Distribution Hub (FDH) Pit B
9
38.5
24 (2000mmX555mmX900mm)
AD
AT E RO
PRIV
Shared Trench Symbol
WALTER HAY DR
Energex Pillar
P100
PWR
Lot 147
NPW889
04
PIT-0
56.
9
8
P50
TRENCH SECTION
C 7.9 C
P50 ELECTRICAL ALIGNMENT
10.8 SEPARATION FROM NBN CONDUITS CROSSING
69.3
DIMENSION RADIAL
PIT-
005
5
P100 LV 100mm Min
HV 100mm Min
P100
21.9
NBN SEPARATION FROM NBN CONDUITS PARALLEL
PIT-006 P100
8
refer separations table DIMENSION VERTICAL
LV LV P/L LV 150mm Min
ENERGEX/ESSENTIAL HV HV
HV 300mm Min
PRIVATE ROA
D D
D
CONDUIT CONFIGURATION
CONDUIT SIZE
CONDUIT LENGTH
P100 DCT-001 26.5
E E
CON001
73.5
7
DUCT/CONDUIT ID
P100 27.5
STANDARD NBN PIT OFFSET
PIT-007
8
TO ENERGEX PILLAR
118.3
F F
0.6m ENERGEX SERVICES
EXCLUSION ZONE
NBN
-
NOOSA COUNCIL
G
APPROVED PLAN CONSTRUCTION ISSUE WHERE PITS ARE NOT LOCATED BESIDE PILLARS, OFFSETS WILL BE SHOWN
G
D
OA
OPW20/0145.01 25 FEB 2021 ON THE LAYOUT TO THE NEAREST TRUNCATION. IF NO OFFSET DISTANCE IS
R
TE
SHOWN, PLEASE CONTACT DESIGN CONSULTANT PRIOR TO INSTALLATION.
IVA
PR
DRAWING TITLE:
-
STRICTLY N KEY PLAN 9
6
EENI
E CREE
K RD STG-M000053677
HOFMANN DR
Lot 4
SP246584
NBNCO APPROVAL RECORD: 8
22
PIT & PIPE LAYOUT
SHEET 001
ROAD
P100 CROSSI
NG BY
UNDERB
ORE
-
P50
57.3 PIT-024 8.2
Lot 1 5
SP222982 DR
N
MAN
HOF
8
NOO
25 LOT C&I SUBDIVISION
SA
CIVIC
ACCE
SIGNATURE DATE
SS
ROA
D
PWR
NOO
SA PWR
CIV
IC
ACC
ESS
SHEET 002
ROA
D
LOT 1 EXISTING COMMS
INFRASTRUCTURE TO REMAIN
F 08.12.2020 AP ISSUE FOR CONSTRUCTION. DD 28 EENIE CREEK RD
WAL
TER
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.