Skip to the record
Every meeting, every word.

Original source · versioned page text

SUPERSEDED Compiled Plans OPW20/0145.02

of 205

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (48.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 77, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                  Noosa Civic | Page 4




1. INTRODUCTION
Queensland Bushfire Planning has been engaged on behalf of Stockwell Development Group to conduct a
site-based Bushfire Management Plan in relation to a Reconfiguration of Lot (1 Lot into 23) development at
28 Eenie Creek Road, Noosaville.

1.1. Site Details

Site Address                                          28 Eenie Creek Road, Noosaville
Local Government                                      Noosa Council
Real Property Description                             Lot 3 on SP246584
Zoning                                                Major Centre
Area of Site                                          31.73 ha
Tenure                                                Freehold
Applicant                                             Stockwell Development Group Pty Ltd
Current Land Use                                      Shopping Centre and Peripheral land
Proposed Land Use                                     Commercial, Residential, Mixed Use

1.2. Site History

Prior to 2003 the site had been partially cleared and enjoyed a range of uses. In 2003 an unplanned bushfire
burnt the entire site (Refer to Photographs in 2004 Bushfire Management Plan). There has been no burning,
planned or unplanned, on the site since 2003. The development that has occurred to date has effectively
eliminated the bushfire hazard from the north and west. Prior to 1990, the subject site was partly cleared
with some regrowth (Figure 1).




                                                                 Bushfire Planning Specialists | qldbushfireplanning.com.au
Log in to download the original file

SUPERSEDED Compiled Plans OPW20_0145.02.pdf · 48.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.