Original source · versioned page text
TPC 1483 - Approval Letter with Conditions - 17 December 1981
Bage 2 12. 13. 14. 15. 16. 17. 1s. 19. STANDARD CONDITIONS FOR MULTIPLE DWELLINGS In accordance with Clause 3 of Part II of Council's By-laws, Chapter XLIV (Town Planning), Council's approval is valid for a period of two (2) years at the expiration of which period the Council may take action to revoke its approval if in the opinion of the Council, substantial progress has not been made in erecting the building or other structure the subject of the consent permit; or the land, the subject of the consent permit, is not being used substantially in accordance with the purposes for which consent was granted. An identification survey of the subject site is to be carried out by an authorised surveyor and is to be submitted to Council at the time of the foundation inspection by the Council's Building Surveyor or immediately thereafter. Such survey shall set out the boundaries of the site and the position of the building(s) on the site. To ensure compliance with any and all conditions of this approval, Council will require that you enter into a Bank Bond to guarantee performance. The value of such bond would be determined and would need to be lodged prior to issue of a building permit and any costs incidential thereto will be the applicant's responsibility. The conditions of this permit are to be completed prior to occupancy of the building and if this is not done, Council reserves the right to call on bond moneys lodged to carry out the works involved. Provision shall be made for the storage and removal of refuse in accordance with the Council's policies and to the requirements of the Council's Health Surveyor. Filling, other development works or the erection of any buildings or other structures shall be carried out so as not to cause any ponding of water on adjoining land or any blockage or interference with any natural water course or in any other way unduly affect adjoining property. In any case where it is unavoidable that the proposed development May cause any of the above disabilities, such remedial drainage or other works shall be carried out to the requirements of the Shire Engineer. The design of such works shall be approved by the Shire Engineer prior to the issue of a Building Permit. In accordance with an offer made, in letter dated 17th Octobey, 1981 Council accepts an offer to contribute towards augmentation of services in the area at the rate $2,488 per unit. Frontage works to be carried out and to include installation of kerb and channel, bitumen widening, and installation and grassing of footpath areas.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.