Original source · versioned page text
Reference Document MCU23-0145 - Vehicle Access and Car Parking Requirement
Very large file (11.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 12, section 1. The text section number identifies this passage in the reader.
No.54 No.54
CONCRETE WAREHOUSES CONCRETE WAREHOUSES
METAL ROOF METAL ROOF
ET
RE
R
ST
ST
7.20m 73.202m (31°53'35") 7.20m 73.202m (31°53'35")
0")
0")
NE
NE
°40'3
°40'3
RP2
RP2
Admin Admin
Waste Room Waste Room
(140
(140
EM. 05
EM. 05
WS WS WS WS WS WS WS WS WS WS
RE
RE
8 x Bike 8 x Bike
Spaces Spaces
289
289
tug tug
2m
m
D
D
Disabled / Disabled /
Trade Hub 1 Trade Hub 2 Trade Hub 3 Trade Hub 4 Trade Hub 5 Trade Hub 1 Trade Hub 2 Trade Hub 3 Trade Hub 4 Trade Hub 5
2
End of trip End of trip
Trade Hub 6 Trade Hub 6
6.16
6.16
A :83.68sqm A :57.77sqm A :57.77sqm A :57.77sqm A :58.85sqm facility A :83.68sqm A :57.77sqm A :57.77sqm A :57.77sqm A :58.85sqm facility
Motorbike A :118.88sqm Motorbike A :118.88sqm
Parking Parking
)
0")
0"
(129°25'3
(129°25'3
WS
A WS
A
PROPOSED CONCRETE DRIVEWAY & PROPOSED CONCRETE DRIVEWAY &
14.716m
14.716m
CAR PARKING CAR PARKING
Lower Level Lower Level
8.00 FFL : 8.00 8.00 FFL : 8.00
D C D C
WS WS
")
0")
8.20 8.20
8'30
Trade Hub 7 Trade Hub 7
°08'3
PROPOSED CONCRETE PROPOSED CONCRETE
°0
A :44.24sqm A :44.24sqm
(106
CROSSOVER
(106
CROSSOVER
11.60 11.60
Trade Hub 17 Trade Hub 17
45m
45m
A :67.62sqm A :67.62sqm
b 16 b 16
e Hu e Hu
B Trad:63.44sqm B B Trad:63.44sqm B
49.5
49.5
b 15 b 15
4 e Hu A WS Trade Hub 8
b 14 e Hu A WS Trade Hub 8
ub 1 Trad 5.15sqm e Hu Trad 5.15sqm
de H m
Tra :83.42sq A :7
WS A :42.66sqm
WS
Trad 3.42sqm A :7
WS A :42.66sqm
WS
A :8
30")
30")
A
EA
EA
WS WS
WS WS
14.716m (118°10'
14.716m (118°10'
SE
SE
DRA
DRA
WS WS
ME
ME
INAG
IN
SEW
SEW
AGE
NT
NT
E SE
ER
ER
Trade Hub 9 Trade Hub 9
SER
SER
SER
A :71.77sqm A :71.77sqm
6.282m
6.282m
e e
rbik rbik
RVIC
Moto ing Moto ing
VICE
V
VIC
Park Park
ICE
RE
RE
E
E
12.00 12.00
0 0
ub 1 ub 1
°0')
°0')
NE
NE
de H m de H m
8.00
Tra :48.95sq 8.00
Tra :48.95sq
(284
(284
800-1000
800-1000
1 A 1 A
1200
1200
ub 1 ub 1
de H m WS de H m WS
WS WS
Tra :48.06sq .D E Tra :48.06sq .D E
m
m
EM 905 GE SE11.80
RVIC EM 905 GE SE11.80
RVIC
500-600
500-600
8.20 8.20
2 A
12 A
58.0
58.0
ub 1
ST
ST
de H m 2 2 8 RAINA Hub 2 2 8 RAINA
H ABOVE GROUND
Tra .06sq 8 RP D 50MMDIA BOLLARD 1300MM HIGH ABOVE GROUND
T rade 6sqm
8.0 RP D
A :4 ) A :4
ub 1
3 '45" T ub 1
3 5") T
°55 N 55'4 N
de H m de H m
RE
RE
°
Tra :54.15sq (10 EW
AY ME Tra :54.15sq (10 EW
AY ME
RE TO HAVE A GRADIENT WS
73m RIV SE ACCESSIBLE CARPARKING BAYS ARE TO HAVE A GRADIENT WS
73m RIV SE
E D in 10 E A E D in 10 E A
THE SURFACEHAS A OF NO GREATER THAN 1:33 WHERE THE SURFACEHAS A
A A
ER THAN 1:40 WHERE THE
52.6 RET de 1
BITUMENOUS SEAL AND NO GREATER THAN 1:40 WHERE THE
52.6 RET de 1
CON
CON
CCORDANCE WITH AS-2890.1 SURFACE IS CONCRETE FINISH IN ACCORDANCE WITH AS-2890.1
C
N Gra C
N Gra
CO CO
C See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.