Referral Agency Response - 28 Eenie Creek Road, Noosaville
Attached to the e-mail MCU23/0135 - Energex Referral agency response - 28 Eenie Creek Rd, Noosaville.
27 November 2023
Noosa Council
PO Box 141
Tewantin QLD 4565
Attention: Nadine Gorton
Via email: [email protected]
Cc Stockwell Development Group Pty Ltd
PO Box 3144
South Brisbane QLD 4101
Attention: Kelly Alcorn
Via email: [email protected]
Dear Sir/Madam,
Referral Agency Response – Development Permit for a Material Change
of Use – Shopping Centre (Extension to Existing Shops and Food and
Drink Outlets) at 28 Eenie Creek Road, Noosaville (Lot 1 on SP322201)
Council Ref: MCU23/0135
Applicant Ref: 21-0694P/13
Our Ref: 13353163-15128046
We refer to the abovementioned Development Application, which has been
referred to Energex Limited pursuant to section 54 of the Planning Act 2016.
In accordance with Schedule 10, Part 9, Division 2 of the Planning
Regulation 2017, the application has been assessed against the purposes of
the Electricity Act 1994 and Electrical Safety Act 2002. This notice is
provided in accordance with section 56 of the Planning Act 2016.
Should the Assessment Manager decide to approve the proposed Material
Change of Use, Energex advises the following in relation to the proposed
development:
Enquiries
Benjamin Freese
1. The development is to be carried out in accordance with the plans
Mobile
identified below. Any changes to these plans should be resubmitted 0455 403 399
to Energex for further review and comment. Email
benjamin.freese@
Approved Plans energyq.com.au
Title Plan Number Issue Date Corporate Office
Title Sheet and A-DA-0000 A 9 October 2023 26 Reddacliff Street,
Development Site Plan Newstead QLD 4006
GPO Box 1461
Ground Floor Plan A-DA-1000 A 9 October 2023 Brisbane Qld 4001
Telephone (07) 3664 4000
Basement Floor Plan A-DA-1010 A 9 October 2023
Facsimile (07) 3025 8301
Level One/Roof Floor A-DA-1020 A 9 October 2023 www.energex.com.au
Plan
Energex Limited
ABN 40 078 849 055
Reference: 13353163-15128046
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 3 pages
Page 2
2
2. The conditions of any easements in favour of Energex must be maintained at all
times.
3. Access to the easement and access along the easement must be available to
Energex personnel and heavy equipment at all times.
4. Any costs or damages incurred by Energex as a result of the carrying out the
development are to be met by the Applicant/Developer.
5. Any future works on an Energex easement or in the vicinity of Energex assets
are to be carried out in accordance with Energex Standard Guideline UG-03/12.
A copy of this guideline is attached for reference.
Should you require further information regarding this matter, please contact the
undersigned on 0455 403 399 or [email protected] faithfully,
Benjamin Freese
Town Planner
Encl. Energex Standard Guideline UG-03/12
Reference: 13353163-15128046
Have you seen our fact sheets?
See the ‘considerations when developing around electricity infrastructure’ section of our website
www.energex.com.au/referralagency
Page 3
3
Standard Guidelines UG-03/12
When considering Works either on Energex easements or in the vicinity of Energex assets,
please be aware of the following general conditions:
• No civil works are to occur within 3 metres of the cable centreline unless otherwise
approved by the Senior Project Engineer- underground.
• Where large excavations are taking place in the vicinity of our cables, there should be no
greater than a 45 degree batter to the cables (i.e. if excavating to a 5 metre depth- need to
maintain a 5 metre horizontal clearance to the edge of the cable trench).
• Excavations in excess of 5 metres in depth must have a minimum horizontal separation,
from the excavation to cable centreline, at least equal to the excavation depth.
• If the easement is to be re-surfaced, the developer must consider that Energex require
timely access to the cables, especially under network emergency conditions. Re-enforced
concrete pavements (or similar) over the easement are generally NOT allowed as they will
impede timely access to the cables. Energex will consider surfaces that are easier to
remove. (e.g.- asphalt, etc) over the easement up to a thickness of 100mm. please submit
detailed plans of any proposal for consideration by Energex.
• The easement may be excavated at any time (and without notice for emergency situations)
to maintain/repair existing cables and install new cables if required. Access across/along
the easement could be prohibited for an indeterminate length of time, possibly weeks for
new cable installations while the works are undertaken.
• Natural ground levels on the easement shall not be changed without Energex approval.
• Final ground levels should slope gently to the edge of the easement, surrounding area or
kerb such that pooling of water on the easement is avoided.
• Stockpiling of spoil on the easement is prohibited.
• Any proposed underground services are to be kept out of the easement and are to only
cross the easement as near as possible to right angles to the cables.
• Any excavation for services across Energex transmission cables should be no deeper than
the barrier boards protecting these cables. Under no circumstances should barrier boards
be removed and the backfill around the cables disturbed.
• Any excavation under Energex cables should be referred to the senior project engineer-
underground to determine if cables need to be supported during excavation. Energex will
be required to fill back around the cables on completion of the works.
• When directional drilling across Energex cables a trench should be dug beside the cables
to sight the location of the drilling head as it passes over/under the cables. There should be
a minimum 500mm separation between the drilling head and cables.
• Any further proposal for works or development on the easement including those involving
changes in ground level and retaining wall designs around cables must have prior approval
from Energex. Please submit the relevant civil design to Energex for approval.
Reference: 13353163-15128046
Have you seen our fact sheets?
See the ‘considerations when developing around electricity infrastructure’ section of our website
www.energex.com.au/referralagency
Page 4
4
• Access to the easement and access along the easement must be available to Energex
personnel and heavy equipment at all times. Energex will require the Developer / owner to
supply and install gates where fencing prohibits access to and along the easement area.
To enable travel along the easement at anytime the gates must be series locked with an
Energex padlock. Both the padlock and a design drawing of an acceptable gate will be
provided by Energex.
• Any costs or damages incurred by Energex as a result of the works on the easement are to
be met by the property Developer / owner.
• Landscaping on the easement is generally not permitted.
Reference: 13353163-15128046