Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Appendix A - Proposal Plans

of 6

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                   GENERAL SPECIFICATION                                                                                                                 Construction Notes
    Written Dimensions take Precedence over scale If in doubt call Accolade Building Designs                              Timber Frame: Framing to be built in accordance with AS 1684 Termite protected timbers shall be used on all framing
    Builder to verify all dimensions & levels on site prior to commencement of work                                       Approved type flashing & sarking to be attached between cladding & frame along with slab & frame to prevent moisture getting to the
                                                                                                                          frames
    All boundary setbacks to be strictly adhered to as minimum setbacks apply
    Verify location of all services on site & all floor levels allow for connection to these services                     All wet areas to be made waterproof or resistant to comply to AS 3740 & BCA 3.8.1
    All building work to be carried out to Aust Standards & to the relevant building codes of Australia                   Linings used shall be approved for use in wet areas & shall be fixed in strict accordance
    Builder to supply footpath protection & show required signage to comply to council regulations &                      with Manufactures specifications. Recommended that all showers have a waterproofed hob
    comply to the Workplace Health & Safety act.                                                                          Or recessed into concrete slab during construction & shower screens fitted to above standards
                                                                                                                          Baths to installed to above standards & approved type sealants to be used to prevent water or Moisture getting into framework
    Builder to supply sediment control where needed                                                                       Water stops or vertical barriers in the waterproofing system be installed to prevent passage of moisture in the floor to non wet areas of
    All work to comply to the National Construction Codes 2014                                                            building
    Termite protection to AS. 3660.1 2/durable notices to be installed in prominent locations stating                     Recommend Laundry floor to have a dry waste in floor & grade floor to it or to door to allow for overflow
    method of protection, Date of installation, Life expectancy & frequency of inspections                                Wet Areas include Bathrooms Ensuite Laundry & WC or Powder rooms
    Smoke alarms to comply to AS. 3786 Hardwired in & interconnected
                                                                                                                          Tiled areas: Tiles to laid or fixed to a clean dry substrate to comply to AS 3958
    Concrete slab & footings to be designed by Engineers from Soils Tests & to comply with AS. 2870                       Ensure water proofing is dry & is suitable for the adhesives or grouts to be applied to
    All Masonry to be constructed to comply with AS. 3700                                                                 Ensure the correct tile is being used for the application (ie. Floor tiles on Floors)
    All structural Timbers to comply with National Timber Framing Codes AS. 1684.2 & AS . 1720 &
    Construction Timbers Queensland(CTIQ)                                                                                 All walls to be checked to ensure they are fixed correctly, straight & plumb prior to fixing plasterboard or interior lining
    All Steelwork to comply to AS. 4100 for steel structures                                                              Plasterboard or interior linings to be fixed to dry frames in strict compliance with manufactures details. Setting of plasterboard to be done
                                                                                                                          in strict compliance with manufactures specifications, Sanded to provide a flat smooth finish
    Roof trusses to be designed by manufacture & Certified, Truss manufacture to determine or confirm
    all lintel sizes under standard & Girder trusses for load bearing capabilities                                        Painting: Paints & application to comply to AS 2311 Min 3 coat application system to be used
    Lighting to comply with AS.1680.1 & B.C.A. Vol 2 Part 3.8.4.2 & 3                                                     Substrate to be clean & dry correct type sealers & primers to be used for substrate
    Electrical installations to comply to AS. 3000 & other relevant regulations                                           If paint is sprayed on then a back roll should be done between coats & after final coat
    Plumbing & drainage to comply to AS. 3500 Hot water system to AS. 3500 4.1                                            Mould resistant paint to be used in Bathrooms, Ceilings to have approved ceiling paint applied & be a matt finish
    Internal Wet Areas to comply to AS. 3740 as in B.C.A. Vol 2, Part 3.8.1                                               All external manufactured timbers to be H3 Treated & sealed painted or encased made weather proof
    External waterproofing to comply to AS. 4654                                                                          in strict accordance with the manufactures specifications
    Windows & Glazing to AS.2047 -1999 Screening or security screens to comply to
    relevant regulations.                                                                                                 Concrete slabs & footings to be poured to Structural Engineers Specifications & in accord with AS 2870
    Plasterboard to AS. 2589 Painting to AS. 2311 Tiling to AS. 3958                                                      External concrete shall be have a NON-Slip Finish or a NON-slip coating applied to the surface
    Insulation to roof cavity & walls to be determined by Licensed Energy Efficiency Consultant to                        All external windows & doors to have appropriate flashing & seals fitted to prevent water getting into building or to the frame work
    Comply to Aust. & QLD. Standards & requirements                                                                       For all installations of windows follow manufactures instructions or Installation & Fixing Guide at www.awa.org.au
    Structural members Wind bracing & tie-down to be certified or designed by Structural Engineer
    WC to be installed with 4.5/3 L dual flush cistern or better                                                          New Dwelling; to have Min. 50 % of specified bracing installed prior to roof going on
    All taps & Shower roses to be AAA Conservation rating                                                                 Existing Dwelling; During construction temporary propping & bracing to consulting Engineers satisfaction
    All roof water to be discharged to approved type Holding Tanks Min. 45,000 litres                                     Gang nail Splice plates NOT permitted for exterior timber beams
    All waste water to be connected to approved type Efflunent system
    These plans are for Certification & Building only. Items like Flooring, Tiles, Painting & other finishes
    Cabinetry Etc. to be decide by Owner & Builder prior Contract being signed Items must comply to relevant codes
    The Builder must have Building Approval for the proposed works from a Building Certifier prior to work commencing




Client: Rod Mcmahon & Diane Gibson       Address: 20 Middle Crk Rd. Federal      Noosa Shire Council                                                                                      Mobile: 0407 693 018                               Date     5/05/2021 10:51:53 AM
                                                                                                             ACCOLADE Building Designs                                                                                                      Drawn by: S.Horn Drawn for A3 Sheet
RPD: Lot 1 on SP 237573         Site Area : 2902 m²       Wind Classification N3                                        Proprietor: Steven Horn                                Email: [email protected] Project Number
                                                                                                                                                                                                                                                                           0620MRGD
Proposed Residence Slab on Ground, Timber Framed, Sheet Roof                                                               QBCC Lic. 54806                                     Issue Date            05 - MAY - 21                                Sheet No. 5         of     6
Log in to download the original file

Appendix A - Proposal Plans.pdf · 456 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.