Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2021-02-25 Special Meeting Agenda

of 112

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (29.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SPECIAL MEETING AGENDA                                                             25 FEBRUARY 2021

Sewer connection:
Documentation provided by the applicant includes a Decision Notice from Unitywater which
authorises and is limited to connection of network infrastructure and property services
infrastructure at Lots 2 & 3 SP115864 to Unitywater’s network infrastructure, and where relevant,
the establishment of water supply and sewerage network works infrastructure, subject to
conditions. The approval requires works to be in accordance with a Water Supply and Sewerage
Network Capacity Assessment prepared by the applicant which states the proposed development
will be serviced by a private pump station and rising main that is planned for connection to the SPS
CRY012 catchment, via a gravity main crossing across Myall Street. The rising main alignment will
be located within the subject site and allotments to north, parallel to the western property
boundaries.
The proposed location of the private pump station and rising main are detailed in the following
image:




                            Figure 21: Location of pump station and rising main

The proposed pump station within the dam catchment area raises concern, as it would potentially
result in the catchment being polluted should the system fail or not be adequately maintained.
Furthermore, the proposed siting of the pump station as detailed in the engineering plans is not
included on the architectural plans with the architectural plans detailing this area as a driveway.
It is noted that the alignment of the private main is within the vicinity of the existing tree line within
the golf course. This vegetation is an important component of the tree lined character experienced


                                                                                        Page 35 of 112
Log in to download the original file

2021-02-25 Special Meeting Agenda(PDF, 28MB).pdf · 29.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.