whilst a 3 metre landscape buffer is provided to the eastern and southern common boundaries with
the golf course. Bulk earthworks for the site include an extensive cut area across the majority of
the elevated area, up to maximum depth of approximately 4.5 metres. Filling of the lower lying
ground in the north and south is expected to be generally 1 to 4 metres in height, although in areas
adjacent to the proposed bio-basins, it is noted that retained embankments may range from 3 to 5
metres. The proposed earthworks include filling a significant area within the site’s identified
Riparian Buffer.
The following images provide detail of the proposed development with additional proposal plans
and the Infrastructure Agreement included at Attachments 1, 2, 3, 4 and 5.
Figure 1: Indicative seniors living facility layout perspective
Figure 2: Seniors living facility site plan
Page 8 of 112
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.