Skip to the record
Accept no substitutions.

Council archive · source document

09/0103 - Approved plans [As Published] · 132009.103

of 9

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

 

?
dy
y ENS)
Zinn. a
ANN,
— see | . woe “iN i
! r SO WN
2 =! A ‘ designers
= g| KN? ky
x
e s “et
‘| @ ‘| "
20 Duke Street
1 Sunshine Beach QLD 4567
PO Box 262
Noosa Heads QLO 4567

 

 

 

Telephone O7 5447 5633
Facsimile 07 $447 5833

 
  

!
5

t
‘ t

maf ay
f 1 1
!

t
I

t
!
1

1
1
!

|
i

1
1

!
1

1

o |
Swans | NY, Se ee,
[ NS ee
ses sprns Pong 1) \ AF - me,
Hil

 

   

       
 

~ A
it
a Hj} — we) —
M ais €® H ‘ R ho A 32.400 TOP OF PARAPET [email protected] au
/ OA, R r Who i Ni} AN \ AM 7 www kiddco.com.au
LA, K IE ASS 1 31,400 TOP OF WALL -com.
S <4 ic ay
@LKY] A This drawing is to be read in

 

i

’

Conjunction with Engineers Drawings &
Reports

| GS

__V 30,200 MIDLEVEL_[/ | VN

Ww

   
   
 

‘Construction to comply

' with all relevant SAA &

 

     
  

 

 

 

 

 

 

 

 

   

  
 

 

 

   
  
   
 

 

 

   

 

  

 

 

 

iT
— Hi — y A
| = Fw. = Vif . BCA Codes & standard
ES - BH 8)—— ) Bidg By-taw 1975 & as,
= So ro
| = 7 HI ENS? WAlt Vert a dimensions on
yf} 5 ‘site prior to. commencement
eS: SPW) _—— 5 Gi any works. These
__W 27,200 LOWER LEVEL b> . - - ‘oa > ————— | —— eal oe 27,200 LOWER LEVEL drawngs arenat tobe
- es rn ns ToT Bs used for scaling
\ POOL TERRACE Copyright for design &
pope de alters
— to | —_ _.
Le WAI ERIS Stuctal Engineers
WES ee
ANN \7/ a Prune
\ '
| EXTERNAL FINISHES LEGEND onan
; (refer to Ad schedules for material description) Poe
Emat:
“NORTH ELEVATION > aan soven ee
o_O EEE VANTIN @® aluminium framed louvres, refer sched. ne Cotter
-$D.501 * SCALE%:100 @) aluminium louvres, refer sched. Phone
. ° @3_ aluminium framed slider, refer sched. nae icEnginoor
€D) aluminium framed door, refer sched. Hydraulic Engineer
@¥ aluminium framed window, refer sched. auet
pore rc nine ee : sun control battens, refer detail. Emai:
JJ , i @D balustrade type 1, refer detail.
5 S G2 balustrade type 1, refer detail.
e ‘z @® masonry blockwork.
5 @ g lo @ ceiling lining.
N
g ® ee “W 34,675 TOP OF BLOG Ee concrete slab.
34,100 SPRING POINT | ——— down pipe.
—Y. 4.100 SPRING PONT LP ~ oe Sor oe - - OO ; XW 33,950 SPRING POINT _ © _ fibre cement extemal cladding.
12qo ' rr ae ae I l @ a i | & fascia gutter.
__W 32,900 SPRINGPOINT ,_ pS = AFS): @FS) ( ORB rendered hebel block
| sh MASTER BED 1 |/DECK He BPE @ metal awning, refer deta
. oH | @ a | AW | - ie yy we | @8 _ polycarbonate roof sheeting, refer schedule.
SOSH y | / / GIs “I, AW | @® metal roofing.
; _ i 4 4 He ~ *y 31,200 UPPER LEVEL _ 4 natural grown line.
i PAS 4 Parapel I.
= ey i as In ' 3) powder coated alum. battens /
30,200 MIDLEVEL ft ad sh the | i 2p | © ridge capping. 6020 Ne
5 en _ 9 _ rain water head, refer detail. P7: Issue for MCU App. 27.01.09
, oS AE | @} silicon butt join, refer detail. PG: Issue for information 12.12.08
 & Bey. | | GW® skylight refer detail & schedule. PS: se formation 121.08
| -BED3/ ws). | \ GS _ structural post, refer engineer. 3: Issue for information 22.08.08
EP BUNKROoM HSS - | | @ soffit fining 2: Issue for information 25.07.08
_W 27,200 Lower te Ey F - AR 277-200 LOWER LEVEL @) structural fooling, refer engineer. 1: Issue for information 22.07.08
. 27,200 LOWER LEVEL - tJ a : 200 LOWER LEVEL _ 1B _ stair, refer engineer. Project
- ==| i | ® timber deck. PROPOSED
| | Beret em ters RESIDENCE
7s timber floor. Location
~ ® turbo vent 61 ORIENT DRIVE
- S finber framed door, ele Sched. | SUNRISE BEACH
@®) timber framed window, refer sched. OBRIEN
P weaterboard dadiing Drawing Tt
ELEVATIONS
ON oo BS Be Scale Date
a EAST ELEVATION as shown @A2_ Feb. ‘08
: Drawn By Job No:
 $D.501 © SCALE1:100 LF/SC 0743
. , Drawing No Issue No.

SD.501 Fs

Used in these records

About this file

File size
2.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0103 - Approved plans [As Published].pdf · 2.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.