Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

075-028 SWMP Report

Attached to the e-mail Email 1 of 3 - 51993_575_01 - Information Request Response - Vista Alegre 1_11_ 2_11 and 11 Ventura St Sunrise Beach Qld 4567.

of 20

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                       CIVIL ENGINEERING PROJECT MANAGEMENT
                            SEDIMENT AND EROSION CONTROL




                SITE BASED STORMWATER MANAGEMENT PLAN
                      at 11 Ventura Street, SUNSHINE BEACH
                                         for Sasha Dettori


     DATE:         31.10.22                     REF:    075-028-01


     ATT:          Development Officer          EMAIL: [email protected]
                   Noosa Council
     REV:          A




2261 david low way, peregian beach, qld 4573   acn: 626 671 092      [email protected]
Log in to download the original file

075-028 SWMP Report.pdf · 1.6 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 19 pages

Page 2

CONTENTS PAGE




                    Peak Flows ................................................................................................................... 9
                    Peak Flow Management ............................................................................................ 11
                    Storage calculation .................................................................................................... 11
                    Peak Flow at Outlet ................................................................................................... 12




                                            Page 2 of 18
 2261 david low way, peregian beach, qld 4573      acn: 626 671 092                                    [email protected]

Page 3

LIST OF FIGURES

Figure 1 - Locality Plan ......................................................................................................................................... 5
Figure 2 – Pre-Development Catchment Plan...................................................................................................... 6
Figure 3 – Post-Development Catchment Plan .................................................................................................... 7
Figure 4 – Lawful Point of Discharge.................................................................................................................... 8
Figure 6 – Proposed Slimline Detention Tank .................................................................................................... 12
Figure 8 – Site Flooding ...................................................................................................................................... 14



LIST OF TABLES

Table A -Rational method calculation parameters (Pre Development)............................................................... 9
Table B -Rational method calculation parameters (Post Development) ............................................................. 9
Table C -Rational method calculations (Pre Development) ............................................................................... 10
Table D -Rational method calculations (Post Development) ............................................................................. 10
Table E - Rational Method vs XPSWMM Peak discharge (1%AEP) .................................................................... 11
Table F –Peak Flows at Outlet (Pre and Post Development) ............................................................................. 13



LIST OF APPENDICES

 Appendix A                  Engineering Plans
                             Prepared by Bax Engineering dated October 2022




This report was commissioned by Ms Sasha Dettori and specifically investigates the subject site. Bax Engineering Pty
Ltd accept no responsibility for the accuracy of the information supplied to use by second and third parties.




                                               Page 3 of 18
    2261 david low way, peregian beach, qld 4573      acn: 626 671 092                                                [email protected]

Page 4

           INTRODUCTION



Bax Engineering has been commissioned by Ms Sasha Dettori to provide a site-based stormwater management
plan for the proposed residential development at 11 Ventura Street in Sunshine Beach, Queensland.


The existing site covers a site area of 740m2 and the proposed development consists of the renovations and
increase in roof area of one of the two residential townhouses.


This report has been developed to address the stormwater management (both quality and quantity
requirements). The report investigates the requirements to mitigate stormwater runoff for the development
and outlines water quality treatment designed to meet the load-based reduction objectives in Council Planning
Scheme.
The stormwater runoff for the proposed development site has been assessed using the Queensland Urban
Drainage Manual (QUDM) with Rational Method calculations to determine the potential stormwater flows on
the development.




                                              Page 4 of 18
   2261 david low way, peregian beach, qld 4573      acn: 626 671 092         [email protected]

Page 5

            THE SITE AND ITS CONTEXT

                     LOCALITY

The site is described as lot 1 on BUP13368 at 11 Ventura Street and is within the Noosa Council local
government boundaries. The development is identified in Figure 1.
The property has an existing 2-unit townhouse on the property. The extent of works is focused on the
renovations proposed for the northern unit known as lot 1. The site has a gradual fall to the eastern frontage
and has residential property to the west, south and north.

The total catchment area of the subject lot is 740m2 with half of this area being the lot 1 development. The
elevation range between approximately 37.25m AHD in the west to 36.75m AHD towards the flow path in the
northeast front boundary.




Figure 1 - Locality Plan
Source: Queensland Globe




                                              Page 5 of 18
   2261 david low way, peregian beach, qld 4573      acn: 626 671 092          [email protected]

Page 6

The site experiences no overland flow from other catchments. The catchment draining towards Ventura Street
is 0.074ha in area and is channelled towards the kerb and channel. Roofwater and hardstand areas from both
lot 1 and 2 are connected to an existing field inlet in the property frontage. This pit is the connected directly
to the kerb via kerb adaptors. The pre-development catchment is shown in Figure 2 (and Bax Engineering plan
075-028-SK01 as part of Appendix A).




Figure 2 – Pre-Development Catchment Plan


As part of the proposed renovations, the existing dwelling will increase in impervious area, however the
catchment will not increase. This increase in impervious area will continue to the same outlet point via a
detention tank located in the common property (lot 0 BUP13368). The post-development catchment is
shown in Figure 3 (and Bax Engineering plan 075-028-SK02 as part of Appendix A).




                                              Page 6 of 18
   2261 david low way, peregian beach, qld 4573      acn: 626 671 092            [email protected]

Page 7

Figure 3 – Post-Development Catchment Plan




                                             Page 7 of 18
  2261 david low way, peregian beach, qld 4573      acn: 626 671 092   [email protected]

Page 8

           STORMWATER QUANTITY MANAGEMENT

The site is an existing 2 lot multi-unit development totaling 740m2 with the existing dwellings, grassed surface
and some vegetation.
The site will increase hardstand area and all runoff from the allotments will ultimately flow east towards the
existing overland flow path.


                   LAWFUL POINT OF DISCHARGE

The post-development ‘Lawful Points of Discharge’ is nominated for the subject property as the Ventura Street
frontage. This is the same location as the pre-development and is shown on Figure 4Error! Reference source
not found. as ‘LPD01’.




Figure 4 – Lawful Point of Discharge




                                              Page 8 of 18
   2261 david low way, peregian beach, qld 4573      acn: 626 671 092           [email protected]

Page 9

                        DESIGN REQUIREMENTS – HYDROLOGY

To demonstrate that no increase in peak flows is occurring to the east (LPD1), the predevelopment catchment
was compared against the pre-development for flow contribution.

                                 Peak Flows

         Flows from each catchment for the pre and post development were calculated using the Rational
         Method and compared against the XPSWMM estimates for the 63 % to 1 % Annual Exceedance
         Probability (AEP) storm event for standard duration storm events.
         The Rational Method calculation parameters are provided in Table A and Table B for the pre and post
         conditions respectively.
         Calculations of the storm events using the Rational Method are provided in Table C and Table D.



Table A -Rational method calculation parameters (Pre Development)

    Catchment             C01

      Area (ha)          0.074

   Fraction Imp. (%)       53

         1
          I10              75

       Time of
                          11.1
 Concentration (mins)




Table B -Rational method calculation parameters (Post Development)

    Catchment            P01

      Area (ha)          0.074

   Fraction Imp. (%)      71

         1
          I10             75

       Time of
                         11.1
 Concentration (mins)




                                              Page 9 of 18
   2261 david low way, peregian beach, qld 4573      acn: 626 671 092          [email protected]

Page 10

            Table C -Rational method calculations (Pre Development)

                                               1%                        2%                        5%                       10%                         18%                       39%                           63%
            Area     tc       I100    C100               I50     C50               I20     C20               I10     C10               I5         C5               I2       C2                I1         C1
Catchment                                     AEP                        AEP                       AEP                       AEP                         AEP                       AEP                           AEP

             (ha)   (min)   (mm/hr)          (m³/s)    (mm/hr)          (m³/s)   (mm/hr)          (m³/s)   (mm/hr)          (m³/s)   (mm/hr)            (m³/s)   (mm/hr)          (m³/s)    (mm/hr)             (m³/s)

  C01       0.074   11.14    248      0.96    0.049     226      0.92   0.043     197      0.84   0.034     173      0.80   0.029     152        0.76   0.024      99      0.68   0.014       80        0.64    0.011




            Table D -Rational method calculations (Post Development)


                                               1%                        2%                        5%                        10%                         18%                        39%                           63%
             Area     tc      I100    C100               I50     C50               I20      C20              I10     C10                I5        C5                I2      C2                     I1     C1
Catchment                                      AEP                       AEP                       AEP                       AEP                         AEP                        AEP                           AEP

             (ha)   (min)   (mm/hr)           (m³/s)   (mm/hr)          (m³/s)   (mm/hr)          (m³/s)   (mm/hr)          (m³/s)   (mm/hr)            (m³/s)   (mm/hr)           (m³/s)    (mm/hr)             (m³/s)

  P01       0.074   11.14     248     1.00    0.051      226     0.97   0.045      197     0.88   0.036      173     0.84   0.030      152       0.80   0.025      99      0.71    0.015       80        0.67    0.011




                                                                                        Page 10 of 18
                                             2261 david low way, peregian beach, qld 4573      acn: 626 671 092                              [email protected]


[OCR of page images]
Table C -Rational method calculations (Pre Development)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1% 2% 5% 10% 18% 39% 63%
Area te loo C100 Iso Cso ho C20 ho Cio Is Cs l Q h CG.
Catchment. AEP AEP AEP AEP AEP AEP AEP
(ha) | (min) | (mm/hr) (m?/s) | (mm/hr) (m3/s) | (mm/hr) (m?/s) | (mm/hr) (m3/s) | (mm/hr) (m3/s) | (mm/hr) (m3/s) | (mm/hr) (m3/s)
co1 0.074 | 11.14 248 0.96 | 0.049 226 0.92 | 0.043 197 0.84 | 0.034 173 0.80 | 0.029 152 0.76 | 0.024 99 0.68 | 0.014 80 0.64 | 0.011
Table D -Rational method calculations (Post Development)
1% 2% 5% 10% 18% 39% 63%
Area t loo C100 Is0 Cso lo Cro lio Cio Is Cs Ip Q hh GQ
Catchment AEP AEP AEP AEP AEP AEP AEP
(ha) | (min) | (mm/hr) (m3/s) | (mm/hr) (m?/s) | (mm/hr) (m3/s) | (mm/hr) (m3/s) | (mm/hr) (m3/s) | (mm/hr) (m/s) | (mm/hr) (m/s)
Pol 0.074 | 11.14 248 1.00 | 0.051 226 0.97 | 0.045 197 0.88 | 0.036 173 0.84 | 0.030 152 0.80 | 0.025 99 0.71 0.015 80 0.67 | 0.011

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

&

&

 

 

Pace 10 oF 18
ACN: 626 671 092

2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573

[email protected]

 

 

Page 11

        The calculated flows using the Rational Method were compared against the XPSWMM estimates for
        the catchment for 1%AEP pre and post development conditions. These are provided in Table E and
        show a reasonable calibration.



Table E - Rational Method vs XPSWMM Peak discharge (1%AEP)

                             Rational
                                         XPSWMM Difference
        Catchment            Method
                                          (m3/s)         (%)
                              (m3/s)
  C01 Pre Development         0.049       0.043         -12.3
  C01 Post Development        0.051       0.050         -2.1



                              Peak Flow Management

In order to ensure that the peak flow mitigation meets the requirements of Council’s Planning scheme policy
for development works. It is proposed to alleviate the increase of fraction impervious by installing a detention
tank connected to the roof and hardstand areas of the proposed development. XPSWMM Modelling was used
to design the detention and minor and major flow pipes from the detention system. The comparison of each
of the storm events is provided in and demonstrates that the installation of a detention tank will allow
mitigation of all events.



                              Storage calculation

The proposed design has resulted in a reduction in post development flows to the Ventura Street frontage
(LPD1). XPSWMM was used to model the storage requirements to ensure the post development flows were
not higher than the predevelopment flows at this location.
The peak flow management objectives have been addressed using detention storage. It is proposed to alleviate
the increase of fraction impervious by installing a detention tank connected to the roof and hardstand areas
of the proposed development. These detention tank will be sized to control the peak discharge and has been
calculated to total 4.6m3 based on the peak discharge temporal pattern. A slimline aboveground tank with 7m3
of capacity is suggested. This would allow 2.4m3 which could be used for site reuse.
The proposed design of the detention tank will consist of a single slimline tank with dimensions shown in Figure
5 (or similar approved). The tank has been designed with low flow discharges via a 20mm diameter orifice at
the base of the re-use and a second orifice (25mm diameter) 606mm above the base. The tank would also



                                              Page 11 of 18
   2261 david low way, peregian beach, qld 4573      acn: 626 671 092           [email protected]

Page 12

have a high flow discharge via a 100mm diameter orifice at a height 1.444m from the reuse base. This would
allow a total storage of 5KL which exceeds the 4.6KL volume requirement.
This tank is shown in Figure 5 (and detailed in Bax Engineering plan 075-028-SK03 as part of Appendix A).




Figure 5 – Proposed Slimline Detention Tank



                              Peak Flow at Outlet

However, the catchment flowing to the eastern outlet (LPD1) has increased and peak volume will need to be
maintained. With the inclusion of the detention system, post development flows have been analysed for the
outlet location. Modelling of the system was undertaken using XPSWMM for the pre and post development
to ensure no increase. The peak duration and rainfall temporal pattern was nominated as the 15min and Storm
02 for the 1%AEP event. The pre development and post development (unmitigated and mitigated) are
provided in Table F. This demonstrates that the incorporation of the detention system will show no increase
in peak flows.



                                              Page 12 of 18
   2261 david low way, peregian beach, qld 4573      acn: 626 671 092          [email protected]

Page 13

Table F –Peak Flows at Outlet (Pre and Post Development)



                                          Post Development
               Pre- Development
   AEP %                            Unmitigated       Mitigated


                 Q Peak (m³/s)      Q Peak (m³/s)    Q Peak (m³/s)

      1              0.043             0.050               0.043
      2              0.038             0.045               0.038
      5              0.033             0.039               0.032
     10              0.027             0.034               0.026
     20              0.022             0.030               0.022
     50              0.017             0.022               0.016
    63.2             0.015             0.020               0.014




                                              Page 13 of 18
   2261 david low way, peregian beach, qld 4573      acn: 626 671 092   [email protected]

Page 14

           STORMWATER QUALITY MANAGEMENT

The reconfiguring of a lot that does not include a new road and has less than 6 new lots it is exempt from
WSUD load reduction targets. Therefore, the water quality objectives are not required for this development.
Nonetheless flows from hardstand areas will be directed towards landscaped areas and vegetated buffers.



           FLOODING

Noosa Council mapping of the development site shows that the proposed site is not affected by flooding. The
mapping shown in Figure 6 highlights the extents of Extreme (0.05% AEP) flood events.




Figure 6 – Site Flooding




                                              Page 14 of 18
   2261 david low way, peregian beach, qld 4573      acn: 626 671 092        [email protected]

Page 15

              CONCLUSION

The pre and post development scenario for the subject has been reviewed to ensure non-actionable nuisance
of flows.


The following conclusions have been made:
     •    based on the design and proposed detention system, the construction of the development on the
          subject site will have negligible impact to the downstream overland flow path.
     •    the development on the subject site will result in non-actionable nuisance of stormwater runoff
          quantities with all runoff to outlet to lawful points of discharge.

It is anticipated the report, when reviewed in conjunction with the planning report and the development plans;
will assist in supporting the application seeking development approval.


Yours Faithfully,




GLENN AINSWORTH
MIEAust CPEng NER RPEQ CPESC
BAX ENGINEERING PTY. LTD.
Ph: 0407 021 300




                                               Page 15 of 18
    2261 david low way, peregian beach, qld 4573      acn: 626 671 092          [email protected]

Page 16

 REFERENCES


Civil Design
Prepared by Bax Engineering (Document No: 075-028-SK01 to SK03) dated 17.10.22

Noosa Council – Relevant Codes and Standards
Noosa Plan 2020 | interactivemaps

Noosa Council – Flood Hazard Mapping
https://www.mapping.noosa.qld.gov.au/disaster-management

Queensland Globe – Site Mapping
https://qldglobe.information.qld.gov.au/




                                              Page 16 of 18
   2261 david low way, peregian beach, qld 4573      acn: 626 671 092    [email protected]

Page 17

                               APPENDIX A
                         Engineering Plans
Prepared by Bax Engineering dated October, 2022


[OCR of page images]
APPENDIX A

Engineering Plans

Prepared by Bax Engineering dated October, 2022

Page 18

                                                                                                                                                                                                                                           TP




                                                                                                                                                                                                                                  //
                                                                                                                                                                                                                                       V
                                                                                                                                                                                                                                       V
                                                                                                                                                                                                                                       V




                                                                                                                                                                                                                                                TP




                                                                                                                                                                                                                                                                            LEGEND:




                                                                                                                                                           BAX
                                            SCALE:                                               SURVEYED:                                                                                                CLIENT:                                    NORTH POINT   TITLE:


                                                                                                                                                                                                               SASHA DETTORI & TONY CARUSO                         PRE DEVELOPMENT CATCHMENT
                                                                                                 DATUM:   AHD



A 17.10.22 ISSUED FOR APPROVAL   QT   GWA
                                            PROJECT NO:

                                                     075-025
                                            LOCAL AUTHORITY APPROVAL NO:
                                                                           DATE

                                                                           CHECKED

                                                                           DRAWN
                                                                                      17.10.22
                                                                                       GWA
                                                                                        QT
                                                                                                 APPROVED:

                                                                                                                             GLENN AINSWORTH
                                                                                                                                  CPESC No: 7678
                                                                                                                                  RPEQ No: 19204
                                                                                                                                                           Engineering                        PTY. LTD.
                                                                                                                                                                                                          PROJECT:

                                                                                                                                                                                                                    11 VENTURA ST SINRISE BEACH
No.   DATE           REVISIONS   BY   CKD                 ---              DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
                                                                                                                                                   2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
                                                                                                                                                           [email protected]                                        QLD 4576                               PLAN No   075-028-SK01   REVISION   A   A1

Page 19

                                                                                                                                                 DN




                                                                                                                                                                                                                                                                            LEGEND:




                                                                                                                                                              BAX
                                            SCALE:                                             SURVEYED:                                                                                                     CLIENT:                                 NORTH POINT   TITLE:


                                                                                                                                                                                                                  SASHA DETTORI & TONY CARUSO                      POST DEVELOPMENT CATCHMENT
                                                                                               DATUM:   AHD



A 17.10.22 ISSUED FOR APPROVAL   QT
                                            PROJECT NO:

                                                     075-025
                                      GWA LOCAL AUTHORITY APPROVAL NO:
                                                                         DATE

                                                                         CHECKED

                                                                         DRAWN
                                                                                    17.10.22
                                                                                     GWA
                                                                                      QT
                                                                                               APPROVED:

                                                                                                                           GLENN AINSWORTH
                                                                                                                                CPESC No: 7678
                                                                                                                                RPEQ No: 19204
                                                                                                                                                              Engineering                        PTY. LTD.
                                                                                                                                                                                                             PROJECT:

                                                                                                                                                                                                                       11 VENTURA ST SINRISE BEACH
No.   DATE           REVISIONS   BY   CKD                 ---            DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
                                                                                                                                                      2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
                                                                                                                                                              [email protected]                                        QLD 4576                            PLAN No   075-028-SK02   REVISION   A   A1

Page 20

                                                                                                                                                                                                                                           TP




                                                                                                                                                                                                                                     //
                                                                                                                                                 DN




                                                                                                                                                                                                                                                TP




                                                                                                                                                                                                                                                                            LEGEND:




                                                                                                                                                              BAX
                                            SCALE:                                             SURVEYED:                                                                                                     CLIENT:                                 NORTH POINT   TITLE:


                                                                                                                                                                                                                  SASHA DETTORI & TONY CARUSO                      OPERATIONAL CONTROL PLAN
                                                                                               DATUM:   AHD



A 17.10.22 ISSUED FOR APPROVAL   QT
                                            PROJECT NO:

                                                     075-025
                                      GWA LOCAL AUTHORITY APPROVAL NO:
                                                                         DATE

                                                                         CHECKED

                                                                         DRAWN
                                                                                    17.10.22
                                                                                     GWA
                                                                                      QT
                                                                                               APPROVED:

                                                                                                                           GLENN AINSWORTH
                                                                                                                                CPESC No: 7678
                                                                                                                                RPEQ No: 19204
                                                                                                                                                              Engineering                        PTY. LTD.
                                                                                                                                                                                                             PROJECT:

                                                                                                                                                                                                                       11 VENTURA ST SINRISE BEACH
No.   DATE           REVISIONS   BY   CKD                 ---            DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
                                                                                                                                                      2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
                                                                                                                                                              [email protected]                                        QLD 4576                            PLAN No   075-028-SK03   REVISION   A   A1

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.