16102 DB Minor Change Application 141999.982589 - Landscaping - 32 Hastings St Noosa Heads
•
2.1 Fire Dampers
The Committee noted that the works scheduled for Building 1 will commence on 2 December.
RESOLVED THAT the Building Manager be commended for her initiative and efforts to bring owners in that
Building up-to-date with the timeframe.
RESOLVED THAT, armed with the lessons learned with Building 1, work on the other 5 Buildings will be
scheduled for May/June next year
YES 6 NO 0 ABSTAIN 0 ACTION: BM
2.2 Noosa Parade Entrance
RESOLVED THAT the following quotations from Sheldon Toms of Noosa Shapes be accepted:
• Stage 1 at $31,086.00 including GST— with the timing being dependent on Council approval;
• Stage 2 at $20,953.00 including GST plus $5,500.00 including GST for the agreed artwork—to be carried
out in the new Financial Year; and
• A proposal be developed for the contractor to visit the site to review and maintain the gardens
quarterly rather than once a year.
The Committee thanked Bryan Houlihan on behalf of all owners for his patience and commitment in developing
and bringing this project to fruition.
YES 6 NO 0 ABSTAIN 0 ACTION: BM/BH
2.3 Bin Room
The Committee noted that the Bin Room extension has been completed with the cost split 50/50 with the
Laguna on Hastings Arcade Body Corporate and the new Bin Mover is in place, with trials being undertaken for
the allocation of bins.
YES 6 NO 0 ABSTAIN 0 ACTION: CLOSE
2.4 Footpath and Gardens on Bella Casa side
RESOLVED THAT the following expenditure be approved to resolve the issues with the footpath and tree and
root removal:
• $1,826.00 including GST for repairs to the footpath;
• $2,640.00 including GST to remove the trees whose roots are creating major problems;
• $400.00 for a Council permit; and
• $495.00 including GST to grind down the tree stumps.
YES 6 NO 0 ABSTAIN 0 ACTION: BM
2.5 Lift Phones
The_Conimittee RESOLVED THAT this remains a_fwork,in-_pmgress' until the Building Manager has received some
further information from Telstra.
YES 6 NO 0 ABSTAIN 0 ACTION: BM
2.6 Gutter & Roof Leaks
The Committee RESOLVED THAT Ocean Fencing have carried out repairs to Buildings 2, 3 and 5 to deal with
leaks which occurred in the recent heavy rain.
YES 6 NO 0 ABSTAIN 0 ACTION: CLOSE
2
Laguna on Hasting CTS 28082
Committee Meeting 5 November 2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.