10/529 Decision Notice [As Published] · 132010.529
2010/529
General
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
Relevant Period
3. The Development Permit for Material Change of Use lapses if the use has not happened by
14 September 2014, unless an application to extend the currency is approved by Council.
Signage
4. Any advertising sign or device is to comply with Council's policies on advertising.
5. All goods to be displayed on site within the property boundaries and/or on the premises
approved for the use.
6. The premises to be identified by the provision of a street number in a prominent location to
ensure it is identifiable to all persons, particularly emergency services personnel.
Building Design
7. The shop front shall provide a minimum of 50% transparent glazing, which must not be
blocked out.
Construction Management
8. Construction works associated with this development must not adversely impact on the traffic
or the safety of the road users or the availability of existing street parking spaces during the
construction phase.
9. A Construction Management Plan must be submitted and approved by Council prior to
approval of Building Works. The Construction Management Plan shall include, but not limited
to the following:
9.1. Traffic management during all aspects of the construct phase including:
9.1.1. A Traffic Management Control Plan in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction;
9.1.2. Mitigate any adverse impact and disturbance on the local residential area and
on the traffic in the local and main roads to acceptable limits;
9.1.3. Define the routes for heavy vehicles on the road network;
9.1.4. Indicate provision for on-site and off-site parking for the required workforce;
9.1.5. Indicate the location of loading and unloading areas;
9.1.6. Indicate the location of any “holding” areas for heavy vehicles
9.2. Mitigate dust disturbance caused by vehicles and machinery movements within and
outside the site;
9.3. Maintenance of safe and secure construction site both during daily construction and
after daily construction has ceased, use temporary fencing where necessary;
9.4. Maintenance and protection of water quality and existing drainage lines through the
construction site, through the implementation of appropriate erosion and sediment
control measures;
9.5. Works program identifying key components of the works and their respective durations;
9.6. Establishment of a communication protocol with the general public, adjoining owners,
local businesses and residents to advise of impacts on traffic and services and other
relevant issues; and
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/529 Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 56 KB (small file)
- File type
No other editions are linked here.