Original source · versioned page text
6.5.22 - Flooding Report 5 may
The original of this document is very large (21.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 65, section 1. The text section number identifies this passage in the reader.
Glenridge Road
Flood Hazard Overlay Code Response
Performance Outcomes Acceptable Outcomes Response
Floodplain Protection
P01 A01 Development layout has ensured building envelopes
Development is undertaken in a manner that Not acceptable outcome provided. are located outside of the 1% (2100) AEP flood plain
ensures:- with minimal change to the natural landform. An
(a) natural hydrological systems are protected; internal road crossing proposed across waterway that
(b) natural landforms and drainage lines are traverses the site has been design to minimise impact
maintained to protect the hydraulic performance to flow regimes.
of waterways; and Lot 1 inundation is associated with overland flow /
(c) development integrates with the natural sheet flow from a small catchment to the north and is
landform of the floodplain rather than not influenced from the flood plain of the main
modifying the landform to suit the development. waterways through the site.
P02 A02 Development layout has ensured building envelopes
In a flood and inundation area, as identified on a Flood Not acceptable outcome provided. are located outside of the 1% (2100) AEP with minimal
Hazard Overlay Map, or in areas otherwise change to the natural landform. An internal road
determined as being subject to the defined flood event crossing proposed across waterway that traverses the
(DFE) or defined storm tide event (DSTE):- site.
(a) any development involving physical alteration to Lot 1 inundation is associated with overland flow /
land does not occur; or sheet flow from a small catchment to the north and is
(b) urban and rural residential development, and not influenced from the flood plain of the main
other development involving the erection of a waterways through the site
building or structure or significant earthworks
satisfies at least one of the following criteria:-
(i) the development is on land that is already
committed to urban or rural
residential development by an approval
granted prior to the commencement of the
planning scheme;
(ii) the development is on land identified in a
structure plan or a local plan as an area
intended for urban development;
(ii) the development is redevelopment or infill
development within an existing developed
area;
(iv) an overriding community need in the public
interest has been demonstrated that
warrants approval of the development
despite its occurrence within an area
subject to flooding;
or
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.