2212-32529 SRA Response with conditions

Attached to the e-mail MCU22/0203 and OPW22/0304 - SRA application correspondence - SARA referral agency response.

of 13

Page text shows just the words. Original shows the document exactly as it was published.

RA6-N




SARA reference:      2212-32529 SRA
Council reference:   MCU22/0203 and OPW22/0304



28 February 2023

Noosa Shire Council
PO Box 141
Tewantin QLD 4565
[email protected]

Attention: Diogo Carrico


Dear Diogo


SARA referral agency response—Claude Batten Drive, Noosa
Heads
(Referral agency response given under section 56 of the Planning Act 2016)

The development application described below was confirmed as properly referred by the State
Assessment and Referral Agency (SARA) on 23 December 2022.


Response
Outcome:                            Referral agency response – with conditions
Date of response:                   28 February 2023
Conditions:                         The conditions in Attachment 1 must be attached to any
                                    development approval
Advice:                             Advice to the applicant is in Attachment 2
Reasons:                            The reasons for the referral agency response are in Attachment 3


Development details

Description:                        Development permit         Operational work for Prescribed Tidal
                                                               Works
                                                               Material change of use for Environmentally
                                                               Relevant Activity (ERA) 16(1)(c) for
                                                               dredging

SARA role:                         Referral agency
SARA trigger:                       Schedule 10 Part 17, Division 3, Subdivision 1, Table 1 (Planning

                                                                             DA Advisory Team (DAAT)
                                                                             Level 13, 1 William Street, Brisbane
 Page 1 of 13                                                                PO Box 15009 CITY EAST QLD 4002
Log in to download the original file

2212-32529 SRA Response with conditions.pdf · 350 KB (small file)

Full text of the other 12 pages

Page 2

                                                                                                   2212-32529 SRA




                                          Regulation 2017) – Operational work that is tidal works or work in a
                                          coastal management district
                                         Schedule 10 Part 17, Division 3, Subdivision 2, Table 1(Planning
                                          Regulation 2017) – Operational work that is tidal works or work in a
                                          coastal management district in tidal waters
                                         Schedule 10 Part 6, Division 3, Subdivision 1, Table 1 (Planning
                                          Regulation 2017) – Operational work involving removal, destruction
                                          or damage of marine plants
                                         Schedule 10 Part 5, Division 4, Table 2, Item 1- Environmentally
                                          Relevant Activity (Planning Regulation 2017)
SARA reference:                         2212-32529 SRA
Assessment manager:                     Noosa Shire Council
Street address:                         Claude Batten Drive, Noosa Heads
Real property description:              Lot 114 on MCH839107
Applicant name:                         Noosa Council
Applicant contact details:               Level 5, 348 Edward Street (or PO Box 203)
                                         Brisbane QLD 4000
                                         [email protected]
Environmental Authority:                This referral included an application for an environmental authority
                                        under section 115 of the Environmental Protection Act 1994. Below
                                        are the details of the decision:
                                         Approved
                                         Reference: P-EA-100375359
                                         Effective date: 10 February 2023
                                         Prescribed environmentally relevant activity (ERA): ERA 16-
                                           Extraction and Screening 1: Dredging, in a year, the following
                                           quantity of material (b) more than 10,000t but not more than
                                           100,000t

                                        If you are seeking further information on the environmental authority,
                                        the Department of Environment and Science’s website includes a
                                        register. This can be found at: www.des.qld.gov.au


Representations
An applicant may make representations to a referral agency, at any time before the application is
decided, about changing a matter in the referral agency response (section 30 of the Development
Assessment Rules). Copies of the relevant provisions are in Attachment 4.

A copy of this response has been sent to the applicant for their information.

For further information please contact Lucy Stenzel, Principal Planner, on 3452 6805 or via email
[email protected] Assessment and Referral Agency                                                                 Page 2 of 13

Page 3

                                                                                     2212-32529 SRA



Yours sincerely,




Steve Conner
Executive Director

cc      Noosa Council, [email protected]

enc     Attachment 1 - Referral agency conditions
        Attachment 2 - Advice to the applicant
        Attachment 3 - Reasons for referral agency response
        Attachment 4 - Representations about a referral agency response provisions
        Attachment 5 - Documents referenced in conditions




 State Assessment and Referral Agency                                                  Page 3 of 13

Page 4

                                                                                                    2212-32529 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)


 No.       Conditions                                                                        Condition timing

 Operational work

 The chief executive administering the Planning Act 2016 nominates the Director-General of Transport and
 Main Roads to be the enforcement authority for the development to which this development approval
 relates for the administration and enforcement of any matter relating to the following conditions:

  1.       All vessels, structures, plant, and equipment associated with the                 For the duration of
           construction of the approved works must be lit/marked in accordance               works and for
           with the following specifications and requirements such that undertaking          operation to be
           the construction works does not cause a risk to the safe navigation of            maintained at all times
           ships:
                (a) any anchors deployed must be marked with yellow buoys and
                    fitted with FL yellow lights fitted
                (b) lighting provided must not obscure, disguise or otherwise
                    interfere with the effectiveness of navigational lighting.

  2.       (a) Prepare a Marine Execution Plan (MEP) by an appropriately                     (a) and (b)
               qualified person(s), that includes, but not limited to the following:         At least 20 business
                  i. demonstrating that the construction and operation of the                days prior to the
                       development will not impede the safe navigation of other              commencement of
                       vessels or restrict safe access to or from neighbouring               works
                       structures
                  ii. is consistent with any requirements of Maritime Safety                 (c) For the duration of
                       Queensland guidelines for major development proposal                  works
                  iii. lighting/marking requirements, any anchors deployed must be
                       marked with yellow buoys and fitted with FL yellow lights
                       fitted. Any floating plant, equipment and pipelines shall be
                       appropriately lit and / or marked to the satisfaction of the
                       Harbour Master.
           (b) Submit to the Marine Execution Plan (MEP) prepared in accordance
               with part (a) of this condition to
               [email protected] or mailed to:
                 Maritime Safety Queensland
                 PO Box 1094
                 Mooloolaba 4557
           (c) Carry out the construction and dredging as applicable in accordance
               with the Marine Execution Plan (MEP) in accordance with part (a) of
               this condition.

 The chief executive administering the Planning Act 2016 nominates the Director-General of Environment
 and Science to be the enforcement authority for the development to which this development approval
 relates for the administration and enforcement of any matter relating to the following conditions:

  3.       The construction of the dredge channel, sand plugs and beach For the duration of the
           nourishment must be undertaken generally in accordance the plans works



 State Assessment and Referral Agency                                                                  Page 4 of 13

Page 5

                                                                                            2212-32529 SRA




No.       Conditions                                                                 Condition timing

          titled:
               i.       General Arrangement
               ii.      Typical Sections and Volumes.

4.        Submit “As Constructed drawings” to [email protected] or mail to:        Within two (2) weeks of
                                                                                     the completion of the
             Department of Environment and Science
                                                                                     works
             Permit and Licence Management
             Implementation and Support Unit
             GPO Box 2454
             Brisbane Qld 4001

5.        (a) In the event that the works cause disturbance or oxidisation of acid   (a) Upon disturbance
              sulfate soil, the affected soil must be treated and thereafter             or oxidisation until
              managed (until the affected soil has been neutralised or contained)        the affected soil
              in accordance with the current Queensland Acid Sulfate Soil                has been
              Technical Manual: Soil management guidelines, prepared by the              neutralised or
              Department of Science, Information Technology, Innovation and the          contained
              Arts, 2014.
                                                                                     (b) At the time the
          (b) Certification by an appropriately qualified person, confirming that        soils have been
              the affected soil has been neutralised or contained, in accordance         neutralised or
              with (a) above is to be provided to [email protected] or mailed          contained
              to:
                 Department of Environment and Science
                 Permit and Licence Management
                 Implementation and Support Unit
                 GPO Box 2454
                 Brisbane Qld 4001

6.        Sand placed under this approval, must not cover any dune vegetation.       At all times

7.        Beach nourishment is to be finished to a maximum of 1 vertical: 3          At all times.
          horizontal ratio for the material being placed.

8.        Sand for beach nourishment must be excavated only from the sand            At all times.
          extraction zone denoted within General Arrangement, prepared by
          BMT, Drawing Number A10342-02-02.

9.        Sand must have the following characteristics:                              At all times.
           (a) the sand used for the work is not finer than the upper beach sand
               at the site
           (b) the sediment is clean, free of contaminants and does not contain
               any building waste or rock.

10.        (a) Prepare a hydrographic survey plan by a registered surveyor in        Within one month of
               accordance with Standards for Hydrographic Surveys within             completion of the
               Queensland Waters to Class A of the dredge area and the               works
               immediate adjacent area likely to be affected by the dredging.



State Assessment and Referral Agency                                                          Page 5 of 13

Page 6

                                                                                          2212-32529 SRA




No.       Conditions                                                                Condition timing

            (b) Submit the hydrographic survey plan to [email protected] or
                mailed to:
                   Department of Environment and Science
                   Permit and License Management
                   GPO Box 2454
                   Brisbane Qld 4001

The chief executive administering the Planning Act 2016 nominates the Director-General of Agriculture and
Fisheries to be the enforcement authority for the development to which this development approval relates
for the administration and enforcement of any matter relating to the following conditions:

11.       Development authorised under this approval is limited as follows:         At all times
          Operational work for the permanent removal, destruction or damage of
          marine plants for beach nourishment being limited to 244.2m2 of dead
          marine wood and shown in Figure 2-1 of Dog Beach Sand Nourishment
          project: Marine Plant Monitoring Plan prepared by BMT, reference
          R.A10342.002.00.Marine Plant MP.docx
          Operational work for the temporary removal, destruction or damage of
          marine plans for beach nourishment being limited to 45.9 m2 of subtidal
          detritus and shown in Figure 2-1 of Dog Beach Sand Nourishment
          project: Marine Plant Monitoring Plan prepared by BMT, reference
          R.A10342.002.00.Marine Plant MP.docx

12.       The dredging and beach nourishment must be carried out generally in       At all times
          accordance with the following plans:
               -     General Arrangement prepared by BMT, reference A10342-02-
                     02; and
               -     Typical Sections and Volumes prepared by BMT reference
                     A10342-02-03.

13.       The marine plant monitoring must be undertaken generally in               Monitoring:
          accordance with Dog Beach Sand Nourishment project: Marine Plant
          Monitoring Plan prepared by BMT, reference R.A10342.002.00.Marine
          Plant MP.docx                                                             A post construction
                                                                                    monitoring survey
          Monitoring reports must be submitted to [email protected] in
                                                                                    within two months of
          accordance with Table 2-1 of the Dog Beach Sand Nourishment project:
                                                                                    construction
          Marine Plant Monitoring Plan.
                                                                                    completion;
                                                                                    Six months after the
                                                                                    post-construction
                                                                                    survey; and
                                                                                    Yearly for a period of
                                                                                    three years after
                                                                                    completion of the
                                                                                    works.




State Assessment and Referral Agency                                                         Page 6 of 13

Page 7

                                                                                             2212-32529 SRA




No.       Conditions                                                                   Condition timing

                                                                                       Reporting:
                                                                                       Within two months of
                                                                                       construction
                                                                                       completion;
                                                                                       Six months after the
                                                                                       first post construction
                                                                                       monitoring survey; and
                                                                                       Yearly for a period of
                                                                                       three years after
                                                                                       completion of the
                                                                                       works, unless adaptive
                                                                                       measures and
                                                                                       corrective actions are
                                                                                       implemented

14.       Development works must only be conducted between April and                   As indicated
          September (inclusive) to minimise the impacts on fish spawning and the
          flowering and fruiting of marine plants.

15.       Enter into an agreed delivery arrangement to deliver an environmental        Prior to commencing
          offset in accordance with the Environmental Offsets Act 2014 to              any works that impact
          counterbalance the significant residual impacts on the matter/s of state     on the marine plants
          environmental significance being 244.2 m2 of marine plants.

16.       Provide written notice to [email protected], when the             As indicated
          development authorised under this approval:
               (a) will start
               (b) when it has been completed.
          These notices must state this permit number 2212-32529 SRA.

17.       Spoil is managed to prevent acid soil development.                           At all times

18.       This fisheries development (as defined by the Fisheries Act 1994)            At all times
          constitutes a place that is required to be open for inspection by an
          inspector at all times, pursuant to section 145 of the Fisheries Act 1994.

19.       Marine plants that are temporarily removed, damaged or destroyed by          Within 5 years of
          this development must be restored to pre-disturbance condition.              removal, damage or
                                                                                       destruction of the
                                                                                       marine plants

20.       Other material used in the development (e.g. debris, construction            As indicated
          material etc.) are to be promptly removed from the intertidal zone.

21.       Tidal land profiles that are temporarily disturbed by the development        As indicated
          works (other than those within the permanent development footprint, as
          shown on the plan titled General Arrangement, must be promptly



State Assessment and Referral Agency                                                            Page 7 of 13

Page 8

                                                                                         2212-32529 SRA




No.       Conditions                                                               Condition timing

          restored to pre-work profiles.

Material Change of Use – Environmentally Relevant Activities

The chief executive administering the Planning Act 2016 nominates the Director-General of Environment
and Science to be the enforcement authority for the development to which this development approval
relates for the administration and enforcement of any matter relating to the following condition(s):

22.       The dredging must be undertaken generally in accordance with the         For the duration of the
          plans titled General Arrangement and Typical Sections and Volumes.       works

23.       Development authorised under this approval for ERA 16(1)(c) is limited   At all times
          to extraction within USL adjacent to Lot 114 on MCH839107 and
          placement within the approved land in Lot 114 on MCH839107 and
          USL adjacent to Lot 114 on MCH839107 for dredging 100,000t to
          1,000,000t in a year.




State Assessment and Referral Agency                                                        Page 8 of 13

Page 9

                                                                                          2212-32529 SRA




Attachment 2—Advice to the applicant

General advice
1.      Terms and phrases used in this document are defined in the Planning Act 2016, its regulation
        or the State Development Assessment Provisions (SDAP) (version 3.0). If a word remains
        undefined it has its ordinary meaning.
Removal, destruction, or damage of marine plants
2.      The Notice of Election for the Significant Residual Impact should be submitted to
        [email protected]. An Agreed Delivery Arrangement must be entered into prior to any
        impact on the matter of State environmental significance.

Marine Safety Queensland
3.       Repair or replace of any navigational aid that are damaged due to the construction, operation
         or maintenance of the development will be required. Any replacement or repair of aids to
         navigation must be carried out at no cost to the Department of Transport and Main Roads and
         to the satisfaction of the Harbour Master.

4.       The dredging operations are to be conducted in a manner that ensures a suitable navigation
         channel is always open to vessel traffic.

5.       All navigation lights, buoys, marks, or signs associated with the development must be
         supplied, installed, and maintained in accordance with The Department of Transport and Main
         Roads through Maritime Safety Queensland ’s requirements.




State Assessment and Referral Agency                                                         Page 9 of 13

Page 10

                                                                                              2212-32529 SRA




Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)

      The Operational Work and Material change of use for an ERA achieves compliance with the
       applicable performance outcomes of State codes 8, 11 and 18 of the SDAP as follows:
           o will not adversely impact coastal processes
           o does not significantly increase the risk or impacts to people and property from coastal
               erosion
           o conditions will ensure that rehabilitation and long-term management of erosion will be
               appropriately monitored and managed.

Material used in the assessment of the application:

      The development application material and submitted plans
      Planning Act 2016
      Planning Regulation 2017
      The State Development Assessment Provisions (version 2.3), as published by the department
      The Development Assessment Rules
      SARA DA Mapping system


The reasons for the SARA’s decision are:
The proposed development complies with the assessment benchmarks and purpose statement within the
following codes:

State Code 7 – Maritime Safety as the proposed development is considered to:
      not distract attention away from, or otherwise reduce the effectiveness of, aids to navigation
      be designed and constructed to be visible to mariners, to avoid the risk of collision
      does not interfere with the operation of aids to navigation
      be conditioned to ensure it does not obstruct the safe movement of vessels in a navigable
         waterway
State Code – Coastal development and tidal works 8 as the proposed development is considered
to:
      protect life, buildings and infrastructure from the impacts of coastal erosion
      maintain and conserve coastal resources
      maintain appropriate public use of, and access to and along, State coastal land
      account for the projected impacts of climate change
      avoid impacts or, where the matters of state environmental significance cannot be reasonably
         avoided, impacts are reasonably minimised and mitigated
      does not result in a significant residual impact on a matter of state environmental significance
         unless the significant residual impact is acceptable, and an offset is provided
State code 11- Removal, destruction, or damage of marine plants as the proposed development is
considered to:
     maintains the extent, distribution, diversity and condition of marine plant communities and
        protects the ecological functions to which they contribute
     maintains the health and productivity of fisheries resources and fish habitat
     minimises impacts on the management, use, development and protection of fisheries resources
        and fish habitat
     is designed and located to avoid impacts or, where the matters of state environmental
        significance cannot be reasonably avoided, impacts are reasonably minimised and mitigated
        through conditions



    State Assessment and Referral Agency                                                       Page 10 of 13

Page 11

                                                                                       2212-32529 SRA



State code 22- Environmentally relevant activities as the proposed development is considered to:
    be located and designed to avoid or mitigate environmental harm on environmental values of the
       natural environment, adjacent sensitive land uses and sensitive receptors
    are designed and located to avoid impacts or, where the matters of state environmental
       significance cannot be reasonably avoided, impacts are reasonably minimised and mitigated
       through conditions of approval
    does not result in a significant residual impact on a matter of state environmental significance


Material used in the assessment of the application:
 the development application material and submitted plans
 Planning Act 2016
 Planning Regulation 2017
 the SDAP (version 3.0), as published by SARA
 the Development Assessment Rules
 SARA DA Mapping system
 State Planning Policy mapping system [delete if not used]
 section 58 of the Human Rights Act 2019




 State Assessment and Referral Agency                                                    Page 11 of 13

Page 12

                                                        2212-32529 SRA




Attachment 4—Representations about a referral agency response
provisions
(page left intentionally blank)




 State Assessment and Referral Agency                    Page 12 of 13

Page 13

                                                  2212-32529 SRA




Attachment 5—Documents referenced in conditions
(page left intentionally blank)




 State Assessment and Referral Agency              Page 13 of 13

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.