NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 10
Local Laws, Policies & State
Regulation Requirements
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
CONDITIONS OF APPROVAL
1. The applicant is advised that development contributions and infrastructure charges applicable to this
development approval have been based on the following Uses Class/ Uses and applicable quantities:-
Existing Development Approved Development
Existing Use Class / Approved Use Class /
Existing Quantity Approved Quantity
Use Use
Vacant Land (one Multiple Housing - Type
Detached House 2 x 2 Bedroom Units
Dwelling allocation) 2 – Duplex
2. The applicant is informed that approval of this development application will trigger an Infrastructure
Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated
amount of $3,747 and is subject to variations in the Consumer Price Index, All Groups Brisbane from
June 2007 until the date of payment. An Infrastructure Charge Notice will be issued in accordance with
Chapter 5 of the Integrated Planning Act 1997.
3. The applicant is informed that payment via credit card transaction will not be an acceptable method of
payment for development contributions conditioned in this permit or for infrastructure charge notices
issued separately.
4. The applicant is advised that a Compliance Permit for all plumbing and drainage works within the
boundaries of the development site shall be obtained from Council’s Plumbing Services Section prior to
obtaining a Development Permit for Building Works.
5. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of
operational works exceeds $80,000, then a portable long service leave levy is required to be paid. In
accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the
Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the
requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational
works must be submitted to Council with the lodgement of any application for operational works over the
site.
6. The development should be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions in accordance
with the nuisance provisions of the Environmental Protection Regulation 1998 or Council’s Local Law No.
12 – Control of Nuisances.
7. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement,
concrete, builder’s waste or rubbish should not be permitted to enter or be placed where it could
reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot
fines apply for such offences.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@d8085b9e\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015A873.001.pdfRelated documentPublic source context ↗
Decision Notice - 010.2007.00000799.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 47 KB (small file)
- File type
No other editions are linked here.