Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Reference Documents - MCU23 0058 (As Published)

of 59

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                  Performance outcomes                                   Acceptable outcomes                                 Performance solution
                  Earthworks

                  PO10                                                   AO10                                                Performance solution proposed. Filling:
                  Excavation and filling for operational works only      Filling, other than accessways:                         d) Filling, other than accessways:
                  occur where they:                                                                                                 does not extend more than the equivalent
                                                                             c)   does not extend more than the equivalent          of 3 metres from existing fill measured from
                       i) result in the protection, rehabilitation and            of 3 metres around the main building,             the toe of existing fill.
                          repair of ecologically important areas,                 measured from the outer walls of               e) is limited to a maximum of 500m2; and
                          watercourses, drainage lines and                        the building;                                  f) does not impact on the local drainage of
                          wetlands;                                          d)   is limited to a maximum of 500m2; and             adjoining properties.
                       j) do not adversely impact on the overall             e)   does not impact on the local drainage of
                          hydrology, hydraulics and flood capacity of             adjoining properties.                      Note that fill is estimated as being 360m2.
                          a waterway;
                       k) do not directly, indirectly or cumulatively
                          cause adverse impacts external to the site;
                       l) do not cause increased flooding, which
                          adversely affects the safety or use of any
                          land upstream or downstream;
                       m) do not cause ponding of water on
                          the site or nearby land;
                       n) do not result in a reduction in flood
                          storage capacity;
                       o) do not adversely affect the flow of water in
                          any overland flow path; and
                       p) do not adversely affect the privacy or
                          visual amenity of surrounding property.




                 23-0102-SMP01-V1A | Preliminary Stormwater Management Plan | Cooroy Sportsground Preliminary SMP

Document Set ID: 22785418
Version: 1, Version Date: 29/01/2024
Log in to download the original file

Reference Documents - MCU23 0058 (As Published).pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.