         GENERAL:
         1.           TO BE READ IN CONJUNCTION WITH 'SEDIMENT CONTROL DEVICES', REFER STD DRG IPWEA DS-040 &                                                                                                                                                                                                                                                                                                    2m (MIN)                                                             2m (MIN)
                      DS-041.                                                                                                                                                                                                                                                                                                             FLOW CONTROL BERM INCORPORATED INTO THE
                                                                                                                                                                                                                                                                                                    MINIM                                 ROCK PAD IF THE PAD RECEIVES RUNOFF FROM
         2.           TEMPORARY DRAINAGE CONTROL FLOW SHOULD BE DIVERTED AROUND THE WORK SITE WHERE                                                                                                                                                                                                       U   M LEN
                                                                                                                                                                                                                                                                                                                   GTH 1                  THE BUILDING SITE (LOCATION MAY VARY)                                                                               BUILDING
                      POSSIBLE.                                                                                                                                                                                                                                                                                          0m (M
                                                                                                                                                                                                                                                                                                                              IN)                                                                                                                               SITE
         3.           ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND BE OPERATIONAL BEFORE                                                                                                                                          40-75mm CRUSHED ROCK                                     300mm (MIN)                                                                    BUILDING                         LAND                                                                     LAND




                                                                                                                                                                                                                                                                                                                                                                                                     10m (MIN)




                                                                                                                                                                                                                                                                                                                                                                                                                                                                      10m (MIN)
                      COMMENCING UP-SLOPE EARTHWORKS.                                                                                                                                                                                                                                                                                                                                          SITE                           SLOPE                                                                    SLOPE
         4.           CONTROL MEASURES TO BE INSPECTED AT LEAST WEEKLY AND AFTER SIGNIFICANT RUNOFF                                                                                                                                                                                          150-200mm                            N
                                                                                                                                                                                                                                                                                                                                MI                              KERB
                      PRODUCING STORMS.                                                                                                                                                                                                                                                                                     m
                                                                                                                                                                                                                                                                                                                      2.0                                                                                                                                                                        SEDIMENT FENCE
         5.           IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES TO BE EITHER                                                                                                                                                                                                                                 DY
                      MULCHED, COVERED WITH EROSION CONTROL BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTED                                                                                                                                                       UP-SLOPE RUNOFF
                                                                                                                                                                                                                                                                                                         R                            P B FOOTPATH                                                                           MAKE SAFE FOR                                                          MAKE SAFE FOR
                                                                                                                                                                                                                                                                 DIRECTED TO AN                                                                                                              FOOTPATH                                                         FOOTPATH
                      TO BE DELAYED FOR MORE THAN I4 DAYS.                                                                                                                                                                                                        APPROPRIATE                                                                        ROADWAY                                                                 PEDESTRIAN TRAFFIC                                                     PEDESTRIAN TRAFFIC
                                                                                                                                                                                                                                                                                              MAKE
         6.           CONTROL MEASURES MAY BE REMOVED WHEN ON-SITE EROSION IS CONTROLLED AND 70%                                                                                                                                                                 SEDIMENT TRAP              PEDE    S A
                                                                                                                                                                                                                                                                                                 STRIA FE TO
                      PERMANENT SOIL COVERAGE IS OBTAINED OVER ALL UPSTREAM DISTURBED LAND.                                                                                                                                                                   GEOTEXTILE FILTER CLOTH (MANDATORY      N TRA
                                                                                                                                                                                                                                                                                                            FFIC                                                                                                 ROADWAY                                                              ROADWAY
         7.           STRAW BALE SEDIMENT TRAPS ARE TO BE SECONDARY OPTION WHICH GENERALLY SHOULD NOT BE                                                                                                                                                      WHEN WORKING ON CLAYEY SOILS)
                      USED IF OTHER OPTIONS ARE AVAILABLE.
         8.           ALL CAPTURED RUNOFF MUST BE TREATED TO <75NTU PRIOR TO DISCHARGE.                                                                                                                                                                                                      (a) ROCK ENTRY/EXIT PAD FOR BUILDING SITES                                                         (b) ROCK PAD SLOPING AWAY FROM ROAD
         9.           SITE TO BE PROGRESSIVELY STABILISED, AIMING FOR 60% STABILISATION WITHIN 20 DAYS FROM START                                                                                                                                                                                                                                                                                                                                              (c) ROCK PAD SLOPING TOWARD THE ROAD
                      OF WORKS AND 70% OR GREATER WITHIN 2 MONTHS.
         10.          ALL INLET PITS TO BE PROTECTED IMMEDIATELY.
         11.          EROSION AND SEDIMENT CONTROL MEASURES TO BE PROGRESSIVELY REMOVED AS SITE
                      STABILISATION IS ACHIEVED.                                                                                                                                                                                                                                         ROCK PADS FOR BUILDING                                                                             CONSTRUCTION NOTES:
                      SEDIMENT CONTROL                                                                                                                                                                                                                                                                                                                                                      MATERIALS
         1.           ALL SEDIMENT & EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH INTERNATIONAL                                                                                                                                                                                             SITES                                                                                      ROCK: WELL GRADED, HARD, ANGULAR, EROSION RESISTANT ROCK, NOMINAL DIAMETER OF 40 TO 75mm. FOOTPATH
                      EROSION CONTROL ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE SPECIFICATIONS. THE BASIC                                                                                                                                                                                                    N.T.S                                                                    STABILISING AGGREGATE: 25 TO 50mm GRAVEL OR AGGREGATE (IF REQUIRED). GEOTEXTILE FABRIC: HEAVY-DUTY,
                      PRINCIPLES ARE TO:                                                                                                                                                                                                                                                                                                                                                    NEEDLE-PUNCHED, NON-WOVEN FILTER CLOTH (‘BIDIM’ A24 OR EQUIVALENT).
                        -  MINIMISE THE AREA OF DISTURBANCE;
                        -  CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS FROM SITE;                                                                                                                                                                                                                                                                                                INSTALLATION
                        -  MINIMISE EROSION;                                                                                                                                                                                                                                                                                                                                                  1. INSPECT ALL SITE ENTRY AND EXIT POINTS PRIOR TO FORECAST RAIN, DAILY DURING EXTENDED PERIODS OF
                        -  MINIMISE SEDIMENTATION;                                                                                                                                                                                                                                                                                                                                               RAINFALL, AFTER RUNOFF-PRODUCING RAINFALL, OR OTHERWISE AT FORTNIGHTLY INTERVALS.
                        -  PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE                                                                                                                                                                                                                                                                                                                 2. IF SAND, SOIL, SEDIMENT OR MUD IS TRACKED OR WASHED ONTO THE ADJACENT SEALED ROADWAY, THEN
         2.           SEDIMENT & EROSION CONTROL DETAILS SHOWN ARE MINIMUM REQUIREMENTS. IT IS THE                                                                                                                                                                                                                                                                                               SUCH MUST BE PHYSICALLY REMOVED, FIRST USING A SQUARE-EDGED SHOVEL, AND THEN A STIFF-BRISTLED
                      CONTRACTOR'S RESPONSIBILITY TO INSTALL ADDITIONAL CONTROL MEASURES AS DEEMED                                                                                                                                                                                                                                                                                               BROOM, AND THEN BY A MECHANICAL VACUUM UNIT, IF AVAILABLE.
                      NECESSARY THROUGHOUT CONSTRUCTION.                                                                                                                                                                                                                                                                                                                                      3. IF NECESSARY FOR SAFETY REASONS, THE ROADWAY SHALL ONLY BE WASHED CLEAN AFTER ALL
         3.           THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL DEVICES IN A FUNCTIONAL                                                                                                                                                                                                                                                                                     REASONABLE EFFORTS HAVE BEEN TAKEN TO SHOVEL AND SWEEP THE MATERIAL FROM THE ROADWAY.
                      ORDER AND REPLACE ALL BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF                                                                                                                                                                                                                                                                                         4. WHEN THE VOIDS BETWEEN THE ROCK BECOMES FILLED WITH MATERIAL AND THE EFFECTIVENESS OF THE
                      MAINTENANCE OF WORKS.                                                                                                                                                                                                                                                                                                                                                      ROCK PAD IS REDUCED TO A POINT WHERE SEDIMENT IS BEING TRACKED OFF THE SITE, A NEW 100mm LAYER
         4.           CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE SATISFACTION OF THE                                                                                                                                                                                                                                                                                                 OF ROCK MUST BE ADDED AND/OR THE ROCK PAD MUST BE EXTENDED.
                      SUPERINTENDENT. SHALL BE COMPLETED AND EFFECTIVE PRIOR TO:                                                                                                                                                                                                                                                                                                              5. ENSURE ANY ASSOCIATED DRAINAGE CONTROL MEASURES (e.g. FLOW CONTROL BERM) ARE MAINTAINED IN
                      a.   STRIPPING OF TOPSOIL AND GRASS.                                                                                                                                                                                                                                                                                                                                       ACCORDANCE WITH THEIR DESIRED OPERATIONAL CONDITION.
                      b.   BULK EARTHWORKS TO THE SITE.                                                                                                                                                                                                                                                                                                                                       6. DISPOSE OF SEDIMENT AND DEBRIS IN A MANNER THAT WILL NOT CREATE AN EROSION OR POLLUTION HAZARD.
                      c.   SERVICES INSTALLATION.
                      d.   PAVEMENT CONSTRUCTION.
         5.           ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL INSTRUCTION IS RECEIVED IN
                      WRITING FROM THE SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT CONTROL APPLICATIONS.                                                                                                                                                                                   OPTIONAL GEOTEXTILE SPLASH PAD PLACED
         6.           BOTH TEMPORARY AND PERMANENT SEDIMENT MANAGEMENT/EROSION CONTROL DEVICES SHALL BE                                                                                                                                                                                         BELOW DAM TO REDUCE EROSION AT THE BASE
                      MAINTAINED AT A SUITABLE LEVEL/CONDITION THROUGHOUT CONSTRUCTION TO THE SATISFACTION                                                                                                                                                                               1      OF THE CHECK DAM (GENERALLY NOT REQUIRED)
                      OF THE SUPERINTENDENT. SEDIMENT FENCES ARE TO BE CLEANED OUT WHEN CAPACITY IS REDUCED
                      BY 30%.
         7.           THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE READ IN CONJUNCTION
                      WITH THE APPROVED DRAWINGS.
         8.           PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE OBTAINED FROM THE                                                                                                                                                                                          1
                      SUPERINTENDENT FOR THE LOCATION OF THE SITE ACCESS POINT AND WASH DOWN AREA WHICH ARE
                      TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.
         9.           IF EROSION AND SEDIMENT CONTROL DEVICES HAVE BEEN FOUND TO BE DIFFERENT OR FAILED IN                                                                                                                                                                     150mm (MIN)
                      SERVICE, CORRECTIVE ACTION IS TO BE UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE                                                                                                                                                             A                       A
                                                                                                                                                                                                                                                                                                    OUTER WING POINTS A TO BE AT




                                                                                                                                                                                                                                                                          B
                      AMENDMENTS' ADDITIONS TO THE ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH
                      AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF DEEMED NECESSARY AND RELEVANT.                                                                                                                                                                                            LEAST 150mm ABOVE CREST B
         10.          SEDIMENT TRAP TO BE FLOCCULATED AND DE-SILTED AS NECESSARY.
         11.          WATER QUALITY TESTING / MONITORING TO BE UNDERTAKEN BY CONTRACTOR.                                                                                                                                                                     SECTION 1-1                                                                                                                                                                            'RETURNS' PLACED AT 20m SPACING
         SEDIMENT FENCE:                                                                                                                                                                                                                        FIGURE 1 - LAYOUT PROFILE OF CHECK DAMS                                                                                                       3m (MAX.) WITH WIRE                                   (MAX.) IF FENCE IS LOCATED ALONG
         1.           NOT TO BE LOCATED IN AREAS OF CONCENTRATED FLOW.                                                                                                                                                                                     (ROCK CHECK DAMS SHOWN)                                                                                          DIRECTION OF      BACKING OTHERWISE 2m                                  THE CONTOUR. OTHERWISE 5 TO 10m
         2.           NORMALLY LOCATED ALONG THE CONTOUR WITH A MAXIMUM CATCHMENT AREA 0.6Ha PER 100m                                                                                                                                                                                                                                                                       FLOW              (MAX.)                                                DEPENDING ON SLOPE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      1.5m
                      LENGTH OF FENCE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      (MIN)
         3.           WOVEN FABRICS ARE PREFERRED, NON-WOVEN FABRICS MAY BE USED ON SMALL WORK SITES, I.E.                                                                                                                                              ROCK CHECK DAMS
                      OPERATIONAL PERIOD LESS THAN 6 MONTHS OR ON SITES WHERE SIGNIFICANT SEDIMENT RUNOFF IS                                                                                                                                                                        N.T.S
                      NOT EXPECTED.
         4.           WHERE FENCES NEED TO BE LOCATED ACROSS THE CONTOUR THE LAYOUT SHALL CONFORM TO
                      'TYPICAL LAYOUT' ACROSS GRADE.
         5.           FENCES ARE REQUIRED 2m MIN. FROM TOE OF CUT OR FILL BATTERS, WHERE NOT PRACTICAL ONE
                      FENCE CAN BE AT THE TOE WITH A SECOND FENCE 1m MIN AWAY. FENCE SHOULD NOT BE LOCATED
                      PARALLEL WITH TOE IF CONCENTRATION OF FLOW WILL OCCUR BEHIND THE FENCE.
         TEMPORARY CONSTRUCTION ENTRY / EXIT:
         1.           ADJACENT STORMWATER RUNOFF TO BE DIVERTED AWAY FROM ENTRY/EXIT.                                                                                                                                                                                                                                                                                                                                                                                                        ALL SUPPORT POSTS PLACED
         2.           WHEEL-WASH OR SPRAY UNIT MAY BE REQUIRED DURING WET WEATHER.                                                                                                                                                                                                                                                                                                                                                                                                           DOWN-SLOPE OF FABRIC
         STANDARD SPECIFICATIONS:
         DRAWING TO BE READ IN CONJUNCTION WITH INTERNATIONAL EROSION CONTROL ASSOCIATION (IECA)                                                                                                                                                                                                                                                                       FABRIC BURIED
         AUSTRALASIA BEST PRACTICES STANDARD DRAWINGS & SPECIFICATIONS. IECA STANDARD DRAWINGS                                                                                                                                                                                                                                                                         200mm
         GENERALLY AS LISTED BELOW BUT NOT LIMITED TO:                                                                                                                                                                                                                                                                                                                                                                         SEDIMENT FENCE FABRIC, NOT
             EXIT-01 - CONSTRUCTION EXIT - ROCK PAD                                                                                                                                                                                                                                                                                                                                                                            FILTER CLOTH OR SHADE CLOTH
             EXIT-02 - CONSTRUCTION EXIT - ROCK PAD
             EXIT-03 - ROCK PADS FOR BUILDING SITES
             CD-01 - CATCH DRAINS
             CD-02 - CATCH DRAINS - EARTH LINED                                                                                                                                                                                                                                                                                                                                                                             INSTALLATION OF SEDIMENT
             RCD-01 - CHECK DAMS
             FF-01 - FILTER FENCE                                                                                                                                                                                                                                                                                                                                                                                                    FENCE
             SF-01 - SEDIMENT FENCE                                                                                                                                                                                                                                                                                                                                                                                                                 N.T.S
             SF-02 - SEDIMENT FENCE
             ESC-02 - GRATED STORMWATER (FIELD) INLET SEDIMENT TRAP                                                                                                                                                                                                                                                                                                                    SEDIMENT FENCE CONSTRUCTION NOTES
             ESC-03 - KERB INLET SEDIMENT TRAPS                                                                                                                                                                                                                                                                                                                                        1.   SEDIMENT FENCE TO BE INSTALLED ALONG A LINE OF CONSTANT GROUND ELEVATION WHEREVER
             R-01 - RENEGOTIATION - GENERAL                                                                                                                                                                                                                                                                                                                                                 PRACTICAL.
                                                                                                                                                                                                                                                                                                                                                                                       2.   BOTH ENDS OF THE SEDIMENT FENCE TO EXTEND UP THE SLOPE AT LEAST 1m.
                                                                                                                                                                                                                                                                                                                                                                                       3.   SUPPORT POST TO BE SPACED MAXIMUM 2m UNLESS THE FENCE IS SUPPORTED BY ATOP WIRE OR
                                                                                                                                                                                                                                                                                                                                                                                            WORE MESH BACKING, IN WHICH CASE 3m MAXIMUM SPACING.
                                                                                                                                                                                                                                                                                                                                                                                       4.   FENCE 'RETURN' SHALL BE INSTALLED AT MAXIMUM 20m SPACING IF FENCE IS INSTALLED ALONG THE
                                                                                                                                                                                                                                                                                                                                                                                            CONTOURS, OTHERWISE 5 TO 10m MAXIMUM SPACING.
                                                                                                                                                                                                                                                                                                                                                                                       5.   MINIMUM 4 STAPLES OR TIE WIRES PER STAKE.




                                                                                                                             APPROVED                                                                                                                                           CLIENT                                      PROJECT                                    DRAWING
                                                                                                                                             DRAWN DS                                                                                                                                                                                                                                                                                                                       STATUS           APPROVAL
                                                                                                                             CHARLES COOK                                                                                                                                                MEGAN O'LEARY &                                 RESIDENTIAL DRIVEWAY               EROSION & SEDIMENT CONTROL
                                                                                                                            RPEQ NO: 8480    DESIGN JW
                                                                                                                                                                                                                                                                                          REES MADDREN                                                                            NOTES & DETAILS                                                                                 PROJECT NO.    STAGE NO.     DRAWING NO.    REV NO.
  C      UPDATED QUANTITIES                                                                     12.08.26             CC      APPROVED DATE
                                                                                                                             10.07.26        CHECK   CC                                                                                                                                                                                 392 SISTER CREEK ROAD
  B      FOR APPROVAL                                                                           29.07.26             CC
                                                                                                                            SIGNED                                                                                                                                                                                                            KIN KIN, QLD                                                                                                                          260139         1           OPW-1-225        C
  A      FOR APPROVAL                                                                           10.07.26             CC                                   COPYRIGHT © All rights reserved.
                                                                                                                                                          This work is copyright and cannot be reproduced
                                                                                                                                                                                                            CIVIL | PROJECT MANAGEMENT | TECHNICAL SERVICES
                                                                                                                                                                                                            www.infinityce.com.au | ABN 72 677 371 532 | INFINITY CE PTY LTD
REV                                DESCRIPTION                                                    DATE              APPR.                                 or copied in any form without the prior consent
                                                                                                                                                                                                                                                                                                                                                                                                                                       SHEET SIZE   A1
Last saved by: JESSWARD(2026-07-06) Last Plotted: 2026-08-12
Filename: C:\ICE\ICE\PROJECTS - DOCS\2026\260139 - SISTER CREEK RD KIN KIN\04_DESIGN\CAD\OPW\260139-OPW-1-225.DWG

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Amended Plan rec'd 13-8-26 260139-OPW-1-(REV C).pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.