In the Planning and Environment No. 1505 of 2013
Court
Held at: Brisbane

el
MENT COURT
LAND

\\|. 2g(Between: HYDROX NOMINEES PTY LTD (ACN 139 Appellant
262 123)

 

FILED
RISBANE

   

NOOSA SHIRE COUNCIL Respondent

 

JUDGMENT

Before His Honour Judge Rackemann
Date of Hearing: 28 — 31 January 2014 and 15 July 2014

Date of Order: 15 July 2014

THIS MATTER HAVING on 28 - 31 January 2014 and this day come on for
hearing by way of appeal against the decision of the Respondent to refuse a
development application for a development permit for a material change of use
of premises for an Undefined Use (Home Improvement Store) & Retail
Business Type 4 (Showroom) (the “Development Application”) in respect of
land described as Lot 4 on SP246584 and Lot 1 on SP222982 and situated at

2 - 18 and 20 Hofmann Drive, Noosaville

UPON THE COURT BEING SATISFIED THAT the change to the Development

Application referred to the affidavit of Christopher Gerard Buckley sworn on 9

 

Judgment CONNOR O’MEARA
Filed‘on behalf of the Appellant Solicitors
Form PEC-7 Level 5, 370 Queen Street

BRISBANE 4000
Phone: 3221 3033
Fax: 3221 6661

FINAL ORDER Email: [email protected]

1303407 Judgment.docx
Log in to download the original file

8. Appendix E - Previous Approval.pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

Full text of the other 52 pages

Page 2

July 2014 is a minor change for the purposes of section 495(2)(b) of the

Sustainable Planning Act 2009

IT IS ADJUDGED THAT:

1s The appeal be allowed, with the issue of costs to be determined.

2: The changed Development Application be approved subject to the
conditions and plans attached hereto and marked “A”, contained in

pages 1 to 51.

Filed on (7 F% 72014

Filed by: Connor O'Meara Solicitors

Service Address: Level 5, 370 Queen Street, Brisbane 4000
Telephone: (07) 3221 3033

Facsimile: (07) 3221 6661

Email: [email protected]

 

Registrar

Page 3

“A”

[1.__ APPLICATION DETAILS |

 

 

 

 

 

 

 

 

Application No: MCU12/0051

Street Address: 2-18 & 20 Hofmann Dr NOOSAVILLE QLD 4566
Real Property Description: Lot 4 SP 246584 & Lot 1 SP 222982

Planning Scheme: The Noosa Plan (8 August 2011)

 

 

[2. DECISION DETAILS |
The following type of approval has been issued:

° Development Permit for Material Change of Use — Masters Home Improvement Store &
Retail Business Type 4 - Showroom

 

[.3.___ RELEVANT PERIOD OF APPROVAL |

The relevant period for this development approval is 4 years starting the day that this
development approval takes effect.

 

4. ___ ASSESSMENT MANAGER CONDITIONS |

PLANNING
When Conditions must be Complied With

‘ly Unless otherwise stated, all conditions of this Decision Notice must be complied with prior
to the use commencing, and then compliance maintained at all times while the use
continues.

Approved Plans

Zz Development authorised by this approval must be undertaken generally in accordance
with the Approved Plans listed within this Decision Notice.

Nature and Extent of Approved Use

3. The ancillary café must not exceed 150m” of gross floor area.
Sunset Clause for Completion of Approved Development
5. The stage 2 Retail Business Type 4 - Showroom development lapses if the use has not

happened by 28 March 2019.
Land Amalgamation

6. All properties the subject of the development must be amalgamated, prior to the
commencement of the use.
Building Height

Ke The maximum height of the main part of the Masters Home Improvement building
(comprising the retail, timber and receiving areas) must not exceed 10 metres above
finished ground levels.

8. The mechanical plant shall be screened in accordance with the Approved Plans.

2 The, maximum height of the garden centre area shall not exceed 9m above finished floor
levels, and shall include a 5 degree pitch as generally indicated on the approved plans.

10. Certification must be submitted to Council from a Licensed Surveyor which certifies that
the Masters Home Improvement Store building does not exceed the maximum height
requirement of this Decision Notice.

 

Page 1

Page 4

 

11:

12.

13.

14.

15.

16.

18.

19.

Performance Bond

Security in the form of a cash bond or trading bank guarantee to the sum of $35,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to
the issue of a Development Permit for Operational Works. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit. Council reserves
the right to call upon the bond or guaranteed sum to effect compliance with conditions.

Built Form

The exterior finishes indicated on the approved plans shall be maintained in the finished
building, and include at minimum the modwood screen panels to the south elevation, PIR
panels with exposed joints, FC sheet cladding, paint finish, groove lines to concrete wall
panels in selected paint finish to those walls on the north.

The canopy proposed to the front entrance of the Masters building shall be in accordance
with the Approved Plans, and remain exposed and open as a roof on columns. s.

The electrical transformer shall be located to the rear of the building, as indicated on the
approved plans as ‘Transformer Option 1’.

Signage

Any advertising sign or device is to comply with Council's policies on advertising,
alternatively, an application for Operational Works (Signage) is required for any signage
in excess of this requirement.

No signage is to be located along the northern elevation of the building facing Eenie
Creek Road.

Fencing
Waste Management

Refuse storage, removal and collection facilities must be provided in accordance with the
following:

(a) The provision of separate waste bins for general and recyclable waste must be
provided.

(b) The provision of hardstand impervious area for the permanent storage location of
separate waste bins for general and recyclable waste; and

(c) The provision of a purpose built enclosure to the bin store to provide visual and
aesthetic screening from streets and pedestrian pathways.

(d) The provision of a roofed wash-down area/s for the purpose of waste bin cleaning
for all general and recyclable waste bins and fitted with a hose-cock and a drain
connected to the sewer.

The development site must provide for the entry and exit of waste vehicles from the site in
a forward direction and the means, without difficulty to align the vehicle with any waste
container (includes waste compactor equipment) and enable waste collection at any time
scheduled for collection. The means to full-fill this requirement, details must be provided
as part of the application for Operational Works approval and must include in particular:

(a) Demonstration that all waste vehicles entering the site can appropriately
manoeuvre on-site in accordance with the above and can readily align the
collection vehicle with the waste containers, stored within a temporary on-site
storage position to enable waste collection. *(Refer to Advisory Note)

LANDSCAPING

Landscaping Works

 

Page 2

Page 5

 

20.

21.

22.

23.

The development site must be landscaped generally in accordance with the Landscape
Master Plan LC-02 Issue D dated 26/5/14 and prepared by LVO, except where amended
by these conditions. The works must be undertaken in accordance with an Operational
Works approval and The Noosa Plan Planning Scheme Policy 3 Landscaping Plants and
Guidelines and must include in particular:

Road frontages and covenant areas

(a) Landscaping treatments to all road frontages to provide screening of the
development.

(b) Restoration and replanting of all covenant areas and the northern road reserve
area adjacent to Eenie Creek Road to provide a visual buffer to the development,
including understorey, mid-story and canopy species in accordance with a
restoration plan submitted for operational works approval.

(i) vegetated screening of northern and eastern boundaries of the site
designed such that 75% of the bulk of the building, including roof form will
be screened within 5 years.

(c) vegetated screening of any electrical transformers, pumps bin storage areas or
ancillary mechanical plant equipment from the car park and road frontages.

Car park area
(d) Provision of 100 litre shade trees of local native species to every 6 car parks.
(f) Provision of dense understorey planting to car park shade tree mulched beds.

(g) Provision of permanent pedestrian cross over strips (i.e. pavement, pavers) to car
park shade tree beds to facilitate pedestrian movement, in order to prevent mulch
compaction in beds.

(h) Provision of root barriers to all car park shade trees adjacent to any storm water
treatment devices to prevent tree root infiltration of storm water media or pipes.

(i) Provision of 12 x 100 litre local native species in the garden beds on the southern
side of the pedestrian shared zone aisle.

(i) removal of all weeds species listed in the following standards and legislation:

(i) declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003

(ii) Undesirable species as listed in Planning Scheme Policy 3 Landscaping
Plants and Guidelines *(Refer to Advisory Note)

All landscape works must be established and maintained in accordance with horticultural
best practice with construction techniques and irrigation that allow for healthy, sustained
and vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.

All landscape works must be maintained generally in accordance with the approved
design for the life of the development.

Treatment of Temporarily Vacant Land

Where some or all of the land remains vacant or undeveloped for more than 3 months,
following the commencement of Stage 1, the following works must to be carried out:

(a) the site must be graded (to the same level as the adjoining footpath wherever
practicable) and turfed.

(b) the site must be landscaped with perimeter planting consisting of advanced
specimens of fast growing tree species.

(c) drainage must be provided to prevent ponding.

 

Page 3

Page 6

 

(d)
(e)

(f)

the site must be maintained so there is no sediment run-off onto adjacent
premises, roads or footpaths.

the site must be maintained to ensure no nuisance to adjacent premises, roads or
footpaths.

where fencing is installed to secure boundaries:

(i) the fencing must be durable and not capable of being pushed or blown
over.

(ii) the fencing type must not detract from local amenity (barbed wire is not
acceptable).

(iii) | vandalism must be promptly repaired and any graffiti removed.

Retention of Existing Trees

24. Existing trees in the covenant area and in the road verge must be retained in accordance
with an Arborist Report submitted for operational works for the development prepared by
a qualified person and referenced in a Development Permit for Operational Works.
FAUNA MANAGEMENT
Fauna Management Plan
25. Prior to the commencement of any works over the subject land, a detailed Fauna
Management Plan (FMP) must be lodged and approved by council delegate.
26. |The FMP must include the following information:
(a) Staging of the clearing,
(i) areas to be cleared.
(ii) proposed dates for clearing.
(iii) if fauna spotter presence is needed in each and every stage.
(b) The Fauna Spotter is to:
(i) Provide a copy of the QPWS Rehabilitation Permit of the fauna spotter
catcher.
(ii) An assessment of the fauna likely to be impacted,
(iii) Ensure the clearing is conducting in a lawful manner.
(iv) Contact details of the nearest wildlife animal specialist veterinarian or other
appropriate party to humanely deal with injured wildlife.
(v) Provide comment on the clearing with relation to the provision contained
within SEQ Koala Conservation State Planning Regulatory provisions
Table 7 , column 2, parts 4 -7.
Clearing of Vegetation
27. Prior to the commencement of any works over the subject land, a Vegetation

Management Plan must be lodged with any operational works permit application. The
plan must document the following items:

(a)

(b)

Vegetation removal, tree felling and lopping must be undertaken in an
environmentally sensitive manner that avoids damaging surrounding vegetation,
trees and habitat.

Cleared vegetation is to be suitably processed by one of the following methods
and removed from the site:-

(i) Processing through a woodchipper or shredder. The resulting mulch is to
be stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5
metres high with a minimum of 10 metres between edges of heaps.

Page 4

Page 7

 

(ii) Disposal for firewood.
(iii) | Disposal for landscaping purposes

(iv) | Transport to alternative site for breaking down materials provided that all
necessary permits have been obtained to allow the alternate site to be
used for this purpose

(v) Re-use for construction materials

(vi) | Environmental weed species (camphor laurel, lantana) cleared from the
site shall not be mulched, with the material to be removed from the site
and disposed of in a Council approved refuse tip.

(vii) Disposal of cleared vegetation by burning or burying is not permitted.

CIVIL ENGINEERING UNIT

28.

29.

30.

31.
32.

33.

Easements

Prior to the commencement of use, a 9 metre wide easement for access purposes must
be registered against the title of Lot 1 SP222982 in favour of Lot 2 SP222982 over the
land area along the southern boundary of Lot 1 SP222982.

Site Access and Driveways

A sealed access driveway must be provided from Hofmann Drive and the Eenie Creek
Road service road to all parking and manoeuvring areas of the development. The works
must be undertaken in accordance with an Operational Works approval.

Parking

A minimum of 246 car parking and 4 motorcycle spaces must be provided and marked
within stage 1, 34 car parking and 2 motorcycle spaces must be provided and marked
within stage 2. The works must be undertaken in accordance with an Operational Works
approval. ,

Motorcycle parking is to be provided in a location close to the entrance of the buildings.

All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.

Service Vehicles

Service vehicle parking, manoeuvring and standing spaces must be provided on the site.
The works must be undertaken in accordance with an Operational Works approval.

Pedestrian and Bicycle Facilities

Pedestrian and bicycle facilities must be provided for the development. The works must
be undertaken in accordance with an Operational Works approval and must include in
particular:

(a) a 2.5 metre wide footpath within the Hofmann Road verge extending from the
existing footpath adjacent to the roundabout at the entrance to the site to the
existing footpath adjacent to the next roundabout to the northeast.

(b) pedestrian pathways extending through the middle of the carpark generally in
accordance with the approved plans.

(c) adequate separation of all specific pedestrian routes from vehicle access and
manoeuvring areas, and clear demarcation by pavement marking, signposts or
changes in surface materials or levels.

(d) signage and lighting at strategic locations to direct people to building entries and
public toilet facilities.

 

Page 5

Page 8

 

(e)

()

(9)

pedestrian refuge areas at strategic locations within the carpark to ensure safe
and convenient congregating of pedestrians waiting to cross major access
driveways

a total of 30 bicycle parking spaces for stage 1, and 10 bicycle parking spaces for
stage 2, which are to be located close to the entrance of the building.

end of trip facilities involving 15 lockers, 2 showers and change rooms for stage 1,
and 5 lockers, 1 shower and change rooms for stage 2.

HYDRAULICS & WATER QUALITY
Stormwater Drainage

The site must be provided with a stormwater drainage system connecting to a lawful point
of discharge. The works must be undertaken in accordance with an Operational Works
approval and QUDM, and must include in particular:

35.

36.

(a)

(b)
(c)

(d)

(e)
*(Refer to Advisory Note)
Stormwater Quality Management

the works described in section 3 and 5 of the Site Based Stormwater Management
Report listed in this Decision Notice.

collection and discharge* of stormwater to Hoffman Drive.

extension of the site stormwater system to accommodate stormwater from the
external catchment as nominated and shown in section 4 of the site based
stormwater management report.

Design calculations and comments outlining how external stormwater flows will be
managed through the site from the external upstream catchment as proposed in
section 4 of the site based stormwater management plan. Any final design must
include:

(i) a site based drainage system which accepts and conveys existing minor
flows from Eenie Creek Road, Commerce Court and existing industrial
development to the west. Detailed design calculations must be submitted
with a concurrent operational works application which demonstrates no
additional afflux on upstream private and public land.

(ii) a site based drainage system which accepts and conveys external
upstream major flows up to and including the 1% AEP flood event, without
increasing afflux to existing upstream private and public land.

(iii) analytical justification that demonstrates design flows can enter any
proposed underground drainage system under appropriate blockage
conditions.

(iv) potential effects of flows in excess of the design flow including the
consequences of the Probable Maximum Flood.

(v) allowances made in the design for debris blockages of the inlet.

(vi) potential effects of debris blockages in excess of that allowed for in the
design.

(vii) | an easement for drainage purposes to be registered against the title of the
property in favour of Council over the land and drainage system which
conveys external flows through the site. The easement must be granted at
no cost to council.

the use of gravity stormwater drainage and not surcharge pits.

A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and the latest

 

Page 6

Page 9

 

37.

38.

39.

40.

41.

version of the Water Sensitive Urban Design Technical Design Guidelines for South East
Queensland, and must include in particular:

(a) stormwater quality treatment devices of a size and location generally in
accordance with those shown in section 5 of the of the Site Based Stormwater
Management Plan listed in this Decision Notice.

(b) bioretention devices which:

(i) are designed generally in accordance with IPWEQA Standard Drawing No.
WSUD-001.

(ii) incorporate a coarse sediment forebay (in addition to the required filter
media surface area), which is sized in accordance with the latest version of
the Water Sensitive Urban Design Technical Design Guidelines for South
East Queensland and designed generally in accordance with IPWEQA
Standard Drawing No. WSUD-005.

(iii) | have safe, unobstructed and all weather access from the road frontage for
maintenance purposes, particularly for the coarse sediment forebay.

(iv) are provided with a high flow bypass to ensure that flows which exceed the
treatment capacity of the device are bypassed in order to avoid damaging
of the filter media or subjecting the filter media to excessive sediment
loads.

(v) are provided with a free-draining outlet from the sub-soil drainage system.

(vi) treat stormwater from all developed catchments (including roof and carpark
catchments) prior to discharge.

Permanent educational signage must be erected to educate the customers to the
development about the function of the bioretention device(s). The dimensions, standard,
presentation and location of the educational signage must be in accordance with an
Operational Works approval. *(Refer to Advisory Note)

Vegetated Devices

All stormwater quality treatment devices must be maintained in accordance with the
Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The
approved Operational Works drawings for the stormwater quality treatment system and
detailed life cycle costing of the system must be attached as an addendum to this
document. Records of all maintenance activities undertaken must be kept and made
available to Council upon request.

Rainwater Harvesting

Operating rainwater collection tanks must be provided for the development. The tanks
must be provided in accordance with an Operational Works approval and must include in
particular:

(a) the details identified in section 5 of the Site Based Stormwater Quality
Management Plan listed in this Decision Notice

(b) a total tank capacity of 50 000 litres
(d) re-use of harvested rainwater for internal non-potable uses and outdoor uses.

Certification must be submitted to Council from a qualified person* which certifies that the
rainwater collection tank and associated reticulation have been installed in accordance
with the requirements of this Decision Notice. *(Refer to Advisory Note)

Easements

Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement

 

Page 7

Page 10

 

42.
43.

45.

registered against the title of the property. All easements must be designed in
accordance with the planning scheme and granted at no cost to the Grantee. Where the
Grantee is Council or a service authority, the easement documentation must be in
accordance with the Grantee’s standard easement terms.

Draft easement documentation must be submitted to Council for endorsement.

All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.

Earthworks and Retaining Walls

All fill and associated batters must be must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.

Damage to Services and Assets

Any damage caused to existing services and assets above or below the ground must be
repaired:

(a) where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or

(b) where otherwise, upon completion of the works associated with the development.

(c) Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.

UNITYWATER

46.

47.

48.
49.

50.

51.

52.

53.

54.

Water and Sewerage

The fire-fighting demand on Unitywater’s water supply system from the development must
not exceed 30 litres per second.

A single Unitywater installed primary water meter must be provided immediately inside
the property boundary. Additional water meters must be installed for each title of a
community title or sub-lease scheme. Meters must be Unitywater approved, installed in
accordance with Unitywater standards and requirements and remain accessible at all
times for reading and maintenance purposes.

Water meters must be located on alternative boundaries to electrical pillars.

Buildings and other structures must maintain a minimum clearance of 1.5 metres from
Unitywater sewer mains, and 1.0 metre from sewer manhole chambers and inspection
openings.

The applicant must adjust the level of the existing sewerage inspection opening as
necessary to suit the proposed finished levels. Work must be undertaken by Unitywater
at the owner’s cost. Where the existing sewerage inspection opening point is located
within a sealed or concreted area, a brass cap is required to be fitted.

Storm water retention systems and gross pollutant traps must maintain a minimum
clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure.

Redundant sewer pipes within the development site must be removed or slurry filled.

Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping
plants within these clearances must be low growing when mature and suitable approved
varieties.

Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs

 

Page 8

Page 11

 

associated with repair, replacement or alteration of infrastructure must be met by the applicant.

 

| 5. REFERRAL AGENCIES

 

    

  

 

 

 

 

 

The referral encies applicable to this application are:
jerrall es en ae ieee
Concurrence | Department Of State Controlled The agency provided its
Transport & Main Road, response on 13 November
Roads : 2012. A copy of the
cae response is attached.
Railways
Concurrence | Department Of Contaminated Land | The agency ears
Environment & Coastal Management | 'SPonse on 10 July 2Uilc.
Heritage Protection Matters A copy of the response is
attached.
Advice Department Of Wetlands The agency provided its
Environment & ‘ ; response on 16 July 2012.
Heritage Protection a A A copy of the response is
attached.

 

 

 

 

 

 

[6. APPROVED PLANS _

is

The following plans are Approved Plans for the development:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Approved Plans

Plan No. Rev. | Plan Name ; _| Date

2869 DA-00 F Locality Plan, prepared by Leffler Simes 04/06/14
Architects

2689 DA-01 A Existing Site Conditions, prepared by | 13/04/12
Leffler Simes Architects

2869 DA-03 F Site Plan, prepared by Leffler Simes | 04/06/14
Architects

2869 DA-04 F Floor Plan, prepared by Leffler Simes | 04/06/14
Architects

2869 DA-05 E Roof Plan, prepared by Leffler Simes | 23/05/14
Architects

2869 DA-06 E Elevation, prepared by Leffler Simes 25/07/13

2869 DA-08 F Sections, prepared by Leffler Simes 23/05/14

2869 DA-09 E Easement Plan, prepared by Leffler | 23/05/14
Simes

2869 DA-11 A Typical Details, prepared by Leffler Simes | 26/05/14

2869 DA-12 B Sections with Sight Lines, prepared by | 23/05/14
Leffler Simes

2869 DA-020 G Site Plan - Stage 1, prepared by Leffler | 04/06/14
Simes Architects

2869 DA-21 B Tenancy Floor Plan and Elevations, | 23/05/14
prepared by Leffler Simes Architects

 

 

 

 

 

 

Page 9

 

 

Page 12

 

The following plans require amendment prior to becoming Approved Plans for the development:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Plans Requiring Amendment
‘Plan No. | Rev. | Plan Name Date
‘Amendments
[7.__REFERENCED DOCUMENTS ne]
The following documents are referenced in the assessment manager conditions:
Referenced Documents
N-B9083.20 B Site Based Stormwater Management | 05
Plan, prepared by OPUS International | October
Consultants 2012

 

The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:

Equitable Access and Facilities

The plans for the proposed building work have NOT been assessed for compliance with the
requirements of the National Construction Code - Building Code of Australia (Volume 1) as
they relate to people with disabilities. Your attention is also directed to the fact that in
addition to the requirements of the National Construction Code as they relate to people with
disabilities, one or more of the following may impact on the proposed building work:

(a) the Disability Discrimination Act 1992 (Commonwealth);
(b) the Anti-Discrimination Act 1991 (Queensland); and

(c) the Disability (Access to Premises — Buildings) Standards
Aboriginal Cultural Heritage Act 2003

There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.

The ACH Act establishes a cultural heritage duty of care which provides that: “A person
who carries out an activity must take all reasonable and practicable measures to ensure
the activity does not harm Aboriginal cultural heritage.” \t is an offence to fail to comply
with the duty of care. Substantial monetary penalties may apply to individuals or
corporations breaching this duty of care. Injunctions may also be issued by the Land and
Resources Tribunal, and the Minister administering the Act can also issue stop orders for
an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural
heritage value of Aboriginal cultural heritage.

You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to discuss
any obligations under the ACH Act.

Unitywater

Connection to Unitywater live water mains must be undertaken by Unitywater at the
applicants cost.

A Trade Waste permit is required prior to any stormwater, groundwater or sump pump
discharge into Unitywater’s sewerage system.

 

Page 10

Page 13

 

The rising main crossing the north eastern corner of the site is no longer in use. No
diversion is required. Pipework may exist in the ground and will need to be removed or
slurry filled. A redundant gravity sewer pipe may be located within the southern portion of
the site requiring removal or slurry filling.

ENGINEERING

6.

Footpath Connectivity

It is advised to enter into discussions with the owner of the Noosa Civic (Lot 3 SP246584),
so as to complete a small portion of footpath adjacent to the office buildings within the
western portion of their site adjoining the small roundabout along Hoffman Drive. This small
section of unfinished pathway within private property, will provide connectivity to both the
Noosa Civic Shopping Centre and the proposed development.

Building and Construction Industry (Portable Long Service Leave) Levy

From 1 January 2000, the Building and Construction Industry (Portable Long Service
Leave) Levy must be paid prior to the issue of a development permit where one is required
for the ‘Building and Construction Industry’. This applies to Building Works, Operational
Works and Plumbing and Drainage Works applications, as defined under the Sustainable
Planning Act 2009, where the works are $80,000 or more and matching the definition of
‘Building and Construction Industry’ under the Building and Construction Industry (Portable
Long Service Leave) Act 1991. Council will not be able to issue a Decision Notice without
receipt of details that the Levy has been paid. Should you require clarification in regard to
the amendments to the Building and Construction Industry (Portable Long Service Leave)
Act 1991, you should contact QLeave on 1800 803 481 (free call) or (07) 3212 6855.

Co-ordination of Operational Works Assessment

To assist Council to undertake an integrated assessment of the operational works
application, all aspects of the works must be included in one (1) application and be in
accordance with Council’s planning scheme. Additional application fees apply to
applications where the different aspects of the works are lodged separately. Significant
savings in application fees will result if all works are lodged in a single application.

Preparation of a Preliminary Construction Management Plan

The works identified in this Decision Notice will be required to be carried out in accordance
with a Construction Management Plan endorsed by Council through an approval for
Operational Works. To ensure expedient assessment of any Operational Works
application, the applicant is advised to submit a preliminary Construction Management Plan
that addresses the requirements of the planning scheme. In particular, the preliminary
Construction Management Plan should address the following:

(a) traffic management during all aspects of the construction phase including:

(i) a Traffic Management Control Plan in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
and traffic control measures prior to construction

(ii) maintenance of safe pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased

(iii) proposed fencing to the site during the construction phase of the
development

(iv) approval of the Traffic Management Control Plan by the Department of
Main Roads (DMR) for any works on State controlled roads

(b) maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
sediment control measures

 

Page 11

Page 14

 

(c) works programme identifying key components of the works and their respective
durations

(d) establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic and services and other relevant issues

(e) identification of complaint management procedures including:
(i) contact details for the on-site manager
(ii) dispute resolution procedures

(f) details on the location of external fill sites/sources, the haulage route, type of
vehicle to be utilised during filling operations and frequency of usage. NB any
damage to the existing road system as a result of haulage operations shall be fully
repaired at the applicant’s expense

(g) it is acknowledged that the Construction Management Plan will be a draft
document requiring finalisation upon appointment of the Principal Contractor
employed to construct the works and a final document will be required to be
submitted at the Pre-Start Meeting for the project.

HYDRAULICS AND WATER QUALITY

10.

11.

12.

13.

Qualified Person

For the purpose of certifying that the design of the rainwater harvesting system is in
accordance with the requirements of this decision notice, a qualified person is considered
to be a Registered Professional Engineer of Queensland (RPEQ), builder or plumber.

Lawful Point of Discharge

The applicant is advised that a lawful point of discharge for the development will need to be
determined and demonstrated as part of a detailed design solution included with the
Operational Works application.

Bioretention Basin Educational Signage

Suggested wording for the permanent educational signage required by this Decision Notice
is as follows:

“BIORETENTION BASIN - This bioretention basin reduces the pollution of our waterways
by reducing the amount of heavy metals, litter, suspended solids, and nutrients
discharged to (insert name of receiving waters)”.

Waste Management Operational Phase

For the purpose of demonstrating compliance with the waste management condition, the
applicant is requested to contact Council’s Waste Management Branch. The respective
waste collection vehicles (i.e. for collection of 2401 wheelie bins, 1100! and greater bulk
bins) and their dimensions will be provided upon standard drawings when requested.

Note: Council’s Waste Contract does not include the supply of waste compactor
equipment. Only the service of a compactor is provided under the contract by Council.
Subsequently the applicant must ensure that any compactor intended for use by the
development can be serviced utilising the Contractor provided Waste Compactor Servicing
Vehicle.

 

['9:

PROPERTY NOTES |

Not Applicable.

 

| 10.

PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME |

Not Applicable.

Page 12

Page 15

 

 

{11. FURTHER DEVELOPMENT PERMITS REQUIRED |

e Development Permit for Operational Work (External Works, Water and Sewerage Works,
Carparking, Driveways, Stormwater Drainage Works, Landscaping, Vegetation Clearing and
Fauna Management)

° Development Permit for Building Work
| 12. SELF ASSESSABLE CODES |

 

Advertising Devices Code.

 

[ 13. SUBMISSIONS |

There were 8 properly made submissions about the application. In accordance with Sustainable
Planning Act 2009, the name and address of the principal submitter for each properly made
submission is provided and attached.

 

[14. REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITHSCHEME __|

The Assessment Manager considers the decision conflicts with the planning scheme and the
following are sufficient grounds to justify the decision despite the conflict:

1. The proposal is similar to a Hardware store, which is identified as a consistent use within
Precincts E5 & B3 of the Noosa Business Centre and will add to the choice and variety
available to consumers, to the community's benefit.

2. The proposed development will not adversely impact upon the economic viability of the
Noosa Business Centre or any other business centre within Noosa.

3. The proposal is generally consistent with the Noosa Business Centre Review 2009, which
identifies hardware stores, garden centres and trade related showrooms within Precincts B3
& E5 as consistent uses.

4. The Home Improvement Store provides an appropriate transition in uses from the Noosaville
Industrial Estate to the Noosa Business Centre.

[15.__ RIGHTS OF APPEAL |

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from
the Sustainable Planning Act 2009 is attached.

During the appeal period, you as the applicant may suspend your appeal period and make
written representations to Council about the conditions contained within the development
approval. If Council agrees or agrees in part with the representations, a “negotiated decision
notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will
defer your appeal period, which will commence again from the start the day after you receive a
“negotiated decision notice”.

[16. OTHER DETAILS |

 

 

If you wish to obtain more information about Council's decision, electronic copies are available on
line at www.noosa.gid.gov.au, or at Council Offices.

 

Page 13

Page 16

THIS DRAWING AND DESIGN IS SUB/ECTTO

COPYRIGHT AND MAY NOT BE REPRODUCED

WITHOUT PRIOR WRITTEN CONSENT OF
LEFFLER SIMES ARCHITECTS

i

woe DA Issut we
20R 8 DASSUE waa
aan snyuto tok COORDNARON. tae
son 2 CHANGES IO DA AS REQUIRED rs
wok NYSED DA FOR ArPROWAL ast
Sates \PEVIRED DA FOR APPROWAL oe

 

PROPOSED
DEVELOPMENT

 

Locality Plan
Scale NTS.

Masters WW

SCALE: NOT TC

  

Page 17

 

ii THIS DRAWING AND DESIGN IS SUBJECT TO

aera. COPYRIGHT AND MAY NOT BE REPRODUCED

ee WITHOUT PRIOR WRITTEN CONSENT OF
LEFFLER SIMES ARCHITECTS

02 DABSUE ae

 

 

 

ie
Gf

 

 

 

 

 

 

 

 

 

 

 

 

 

m2 Eo 01 Eee ER SIMES

15

Page 18

  

25

st

 

 

 

 

 

 

 

 

BRUSHED COVERED Biv
CONCRETE SORES
STAGE 2 nee
[Aor mr racy 1 | ]
' }
ROOM aM $ LOO i |
| i
Td ssscrce ie
} PARKING. |
g } tesracen |
TENANCY ! itt
1,737 SGM {ibe Pi |
{ , 4 | |
| —
| 2motor  ¢-——
Pee ee Sg
1] nt
46300 4 | | |
= —_ BICYCLE
= PAREN ot
= <— (esPaces) =
RETANING WALL IO —
CIVIL ENGINEERS: 4 p
DETALS
SS = =~
1 vanoscare 10
ene UANerenre
CARPARK ENTRY/EXTT 6 ARCHITECTS OARS
TENANCY SERVICE

ENTRY/EST

 

 

 

 

 

 

 

 

 

 

 
  
 
  
   
 
  
   

 

 

 

 

 

 

 

 

TERS SITE AREA (STAGE 1}
STAGE
TOTAL SITE AREA
MASTERS GFA:
RETAIL CENTRE =  6.24050M
GAROEN CENTRE = 995 SQM
TIMBER CENTRE . 857 SQM
RECEIVING . 851 SQM
OFFICE = 3245QM
TOTAL MASTERS GFA = 9277 SQM
TOTAL UNCOVERED USE AREA = 545 SQM
TOTAL MASTERS USE AREA = —-9,8225QM
MASTERS CAR PARKING
DBABLED - 8 SPACES,
ORDINARY = 250 SPACES
TOTAL CARPARKING =
(38.1 Sam)

STAGE2
TENANCY GFA =

DINARY «
TOTAL CARPARKING =
TOTAL CARPARKING *

LEGEND:
SITE COVERAGE:
STAGE | SITE COVERAGE = 0m
STAGE 2 SITE COVERAGE = 22% GROSS FLOOR AREA
OVERALL SITE COVERAGE = 25%
UNCOVERED USE AREA,
LANDSCAPING TO LANDSCAPE oat 5
ARCHITECT'S DRAWINGS BOP ERNN

 

 

 

 

 

 

LANDSCAPE
LANDSCAPE
ARCHITECTS:
DETALS

2.5m wide FOOIrAT
AS PER COUNCE

     
 
 

Se

Pe

‘ “<9,
Fe
‘ =._//
Prionsion

ei

Masters PW

 

 

A THIS DRAWING AND DESIGN 15 SUBIECTTO

COPYRIGHT AND MAY NOT BE REPRODUCED

on WITHOUT PRIOR WRITTEN CONSENT OF
LEFFLER SUMES ARCHITECTS

EB IEIEIEIS

 

Page 19

a THIS DRAWING AND DESIGN 15 SUBIECT TO
ents, COPYRIGHT AND MAY NOT BE REPRODUCED

 

 

|

    
     

 

;
f

¢
+

 

 

   

 

 

 

 

 

 

 

 

 

(Cc (8
—==—— NY See
7/7 7 Mls ile 77777 7
YY SETBACK
rouse.
, A PABTAL CLAD EXTERNAL COLORBOND ABTAL CLAD EXTERNAL —y
GR nt coLomOWD 8 HEA "| “ EMERGENCY ACCESSWAY mone
Sore" ee ea or
{aaen i
tT geal = — PSULATED WALL PANEL TO. CONCRETE MRI UP PANEL TO. INSULATED WALL PANEL TO.
STRUCTURAL ENGINEERS CETAILS STRUCTURAL ENGINEERS DETAAS STRUCTURAL ENGINEER'S DETAILS:
Mam SeleCteD NICS Pat fan secer One AN Some iecteD sean Pat

CONCRETE TRI UP PANEL 1D ROOF
STRUCTURAL ENGINEER'S DETAILS acces

 

  
   
  
  
  

 

   

 

 

  

 

 

 

Q
<
2 RECEIVING
wy GFA 861 SOM
g 1 —§ verve
(SR)
% CONCRETE FLOOR Fins
= r RENFORCED CONCRETE SLAB
DESIGNED 10 STRUCTURAL ENOHVEERS INTERNAL ENTRY/EXIT. =>
5 DETAILS & SPECIRCATIONS
* EXACT LEVEL 10 BE
CO neitaED BY vk ENGEER
ermine at
MOrORSED } a
RETAIL CENTRE ne Sa ee
a i CONCRETE NLT UP PANEL 10. GEA 624050M USED AREA 1540 SQM i
timeiectes ern ANS CAE ; Ot ne
INTERNAL PAINT FINISPY CONCRETE FLOOR FINS a " EEN ON TOP OF
:
OESGNED TO STRUCTURAL
oo DETARS & SPECIFICATIONS
* EXACTLEVEL 10 BE
Contin BY CPL NCI
ULATED WALL Pant 10 an eatin wait Panes 10
SHRUCTURAL Excauees BETALS ans StmuCTURAL ewGineses DED E
een Pa infin SeurCTED neta, PAT dram seitcleo sens Pant
£ ran mon

TIMBER CENTRE
GFA 857 SGM

concent noon st

BEUORCED CONCRET FAR
DeS0NED JO STRUCTURAL
—=_—_ <5 INTERNAL ENTRY/EXIT

INTERNAL ENTRY/EXIT > »
£80.08 JR FACILITY

2 SHOWER/TONET, CHANGE
ROOMS AND 15 LOCKERS

  
   

     

CHECKOUTS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
  

(18 3 08 | ponent

 

 

 

 

 

 

     
   

ey
er pf CUSTOMER CAR PARKING
|

3 ] oe .

(c\

 

WATER TANK

Ne
Masters PW

 

Page 20

 

 

 

THIS DRAWING AND DESIGN IS SUBECT TO

COPYRIGHT AND MAY NOT BE REPROOUCED

WITHOUT PRIOR WRITTEN CONSENT OF
LEFFLER SIMES ARCHITECTS

     

 

 

 
 
 
  
 
 
    

 

 
 
 
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
    

 

 

 

 

 

 

 

 

 

 

 

 

 

        

 

’ sae
. ane
274s c SLED FOR CORONATION sae
wr ° CHANGES 10 DA SET AS REQUIRED we
COLORIOND RAN — ACCES ADDER ROOFTOP MECHANICAL Unit — PICHED ROOF — METAL ROOF SHEEING AND ROOF MECH. AC UNITS TWERMALSEYUIGHT SYSTEM TO METAL PURLIN ROOF —— e PEVBED OA FOR APPROVAL was
WATER EAVES GUTTER WUT LOUVRE SCREENING TO CANOPY STRUCTURE TO DRAIN TOMECH MASIIFACTURERS ORTALS ANCHORS 8 GABLES TO
10 WrORAUUIC MECHARICAL ENGINEERS STRUCTURAL ENGINEGRS AND NGINEER'S MANUFACTURER'S OFTALS
ENGINEERS DETARS DETARS MANUFACTURERS OETARS DRAWINGS (TYPICAL)
WAUL WH SELECTED OPENING
[— pico soot SELECTED PA FISH
! ‘CANOPY,
IAETAL ROOF SHEETING AND
METAL PURLIN ROOF ROOF STRUCTURE IO
ANCHORS & CABLES STRUCTURAL ENGAVEERS AKO
TO MANUFACTURERS. i MANUFACTURERS DETAILS
DETAKS: =
METAL ROOF SHEETING —— |
[AD ROOF STRUCTURETO
STRUCTURAL ENGINEERS
[AND MANUFACTURERS * oO
DETAAS
ROOF ste a
peeler a
POSED STEEL -
AWNING TO LOADING
AREA .
NeAVY DUTY CHAN wie ——
MESH FENCE WITH SHADE
CLOTH BEHIND. SHADE RIOGE CAPPING
CLOTH SUPPLIED BY POUT.
RIDGE CAPPING “mh i
THERMAL SKTUGHT SN eR et
SYSTEM TO
MANUFACTURER'S : ti
DeTARS i
re 3
b i a2 !
1
I
5 ‘
T
oor stee —-———-} —__ - —- —__-
nt | né |
4 | ii | . METAL ROOF SHEETING AND.
ROOF STRUCTURE TO
STRUCTURAL ENGINEERS
AND MANUFACTURERS:
U oats
1
) !
PAC WED ROOF coxomsonp raw —! ROOROP MECHAMCALUNT —! FCSHEETCLADOING — BOXED GUTTER, S@ETIO. + — | FE SHEET CLADDING coLoREOND RAIN \ — mech. we unirs
canary WATER EAVES GUTTER Weert LOUVRE ” TOMAN ‘CONFRMED BY TO MANN ENTRY ROOF 10 OUSIDE FACE OF WATER EAVES GUTTER RAIN TO MECH ‘CANOPY
TO WYORAUUC MMECHANECAL ENGINEER'S FEATURE HYDRAUUC ENGINEER canory PARAPET WALL TO MTDRAUUIC ENGIEERS
ENGINEERS DETANS DEALS ENGINEERS DETALS DRAWINGS (TYPICAL)

ROOF PLAN
50

Seale 1:2!

 

SURLONG UNE—

 

 

Masters PPe

JOB NC

LEFFLER SIMES

 

Page 21

 

  
   
    

   
     
 

FCSHESCLADDNG—  COLORBOND METAL EAVES ~ MODINOOD OR ROOFIOP MECHANICAL UNIT Wit
, TO TRADE CENTRE GUMER 8 COWNPIPE EQUIVALENT FEATURE (QUVRE SCREENING TO
LX parr Feature ‘WALL CLADDING MECHANICAL SNGINEER'S DETAUS
woDWwooD OR THERMAL SKTUGHT SYSTEM
¢ EQUIVALENT FEATURE TO MANUFACTURER'S 10? OF SCREEN
WALL CLADOING: DeTAnS RL

  

 
    

al ad Tan ante en A —
POWDER COATED-— PANT RNEHHIO— METAL CLAD EXTERNAL —! INSULATED P.LR PANELS. PAINT Fast TO PAINT ANSH 10 ——— POWDER COATES —~— TROUEY BAY —
ALUMINKIM FRAMED DADO CONCRETE (QOOR Wi COLOR TO STRUCTURAL ENG. DADO ‘CONCRETE BASE ALUMINIUM FRAMED
Gramerosnorross SAPS SONDMEAD RUSHING -OETALE. CONCRETE WALL Gtnamis TO SOPRRONT
Scale 14:250
ctooveunes 10 ——-— BOOHOP MECHANICAL UNE —— —~ EIA. CLADOING 10 REN
CONCRETE WALL PANELS, | WITH LOUVRE SCREENING TO (OF MAAIN ENTRY FEATURE
Serecren Pan PRED MecrAMOAL EwONEEES PARAPEr BEYOND
baat
p= watt n secon ant #OOFOP MECHANICAL URuT- = sislaiia — nenma serucin srs
A. Fras | WIM LOUVRE SCREENING TO Reonee TO MANUFACTURERS DETALS
Cownert | A

  

WALL WITH SELECTED OPENING
IN SELECTED PAINT ANH

 

 

Yoo

  

  

— FC SHEET CLADDING. THERMAL SKYUGHT SYSTEM TO
TO ENTRY BOX FEATURE MANUFACTURERS DETALS
MooWoOD OR ———,
EQUIVALENT FEATURE
AN WALL CLADOING

   

| aA

 

 

sscowoo OR — ROOHIOP MECHANICAL UNIT | METAL ROOF SHEETING AND. -
EQUIVALENT FEATURE WITH LOUVRE SCREENING TO, |
WALL CLADDING MECHANICAL ENGINEER'S
DeTALS
TOP OF SCREEN
aL 1998

Lee

   

— PAINT FeMSH 10 DADO L— INSULATED PR PANELS MODWOOD OR EQUIVALENT
CONCRETE WALL TO STRUCTURAL ENG. FEATURE SUDING DOOR WTH
DETAAS, ie UNI ON THE INTERNAL
Hi

TOP Pa unt — isa! =
ee ee MEIAL ROOF SHEETING COMPACIOR
MECAARICAS BHGDNEERS, [STRUCTURAL ENGINEER'S AND

MANUFACTURERS DETAILS

 
 
   

       

   

    
    
  

 

‘THIS DRAWING AND DESIGN IS SUBJECT TO.
COPYRIGHT AND MAY NOT BE REPRODUCED

 

  

ial Laruseincaes Cowanag eres. ee, WITHOUT PRIOR WRITTEN CONSENT OF
R
ims eneRen LEFFLER SIMES ARCHITECTS
rae WOOD OR EQUIVALENT iw EC
‘TURE SCREEN, DETAILS AS

BELOW. Wilh FABRIC LING. iw.0312 n PRELOVPSARY SSUE ane

OD THE INTERNAL FACE osml2 Pa PRELIVINARY SUE JAR

Fee 1ame12 A Amie uae

siuiz 8 DA SUE uak

no2 c SUED FOR COORDINATION oe

mis 8 CHANGES TO DA SET AS REGLIRED uak

SSUED FOR COORDINATION
2s0r)3 t ‘CHANGES TODA SETAS REQUIRED wae

POSED STEEL —

AWNING TO LOADING
AREA

 

 

 

 

 

 

 

 

 

   
 
    

              

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

  

 
    

 

 

\— WAKL WITH SELECTED PAINTED CONCRETE = ‘— METAL CLAD EXTERNAL =~ COLORBOND METAL —— PAINTED CONCRETE — GROOVE LINES 10
OPENING IN SELECTED WALL PANELS DOOR WITH COLOR COWNPRE WALL PANELS: CONCRETE WALL PANELS.
PAINT FINISH nC BOND HEAD FLASHING PAINT FINISHED
NORTH ELEVATION “"S"™™"""
Scale 1:250
Fc sitet CxADONG TO“ — ROOFTOP MECHANICAL UNIT WALL WITH SELECTED— ROOF BOGE COLORKOND FASCIA 10 RETAIL [ROOFTOP MECHANICAL UNIT PICKED ROOF 10
ENTRY BOX FEATURE | WITH LOUVRE SCREENING TO | OPENING INSELECTED | (CENIRE ROOF. | WITH LOUVRE SCREENING TO GARDEN CENTRE
oo PAINT RNSH | MECHANICAL ENGINEERS.
ae GROOVELNES TO — vas | COLOREOND METAL
OF MAIN TRY CONeRETE WALL i EAVES GUTER 2
/ FEATURE WALL f PANELS, SELECTED PAINT] —~ | FE BEYOND
( __ ghia oe =e ‘
ey Ros ee = pa ~
( = Seiare. | = =
* 1 bd ( ; f 7
( waicumise , |
Vag OPENING In : :
( ram : { ‘ ; | f 4
{ ; £ Be i F J | WALL WITH SLECIED.
\ 3 F { 1 ¥ OPERING IN SELECTED
or i f i 7 q i 3 J PAINT FINSH
( 1 oStee f : i f
& | | }
anit |
mani Beny ROOF” ODWOODOREQUVALET—! |. —— soxED Gur. sae 10 woowoonor ——! “sono ur satio— — _ moowoa0on
CANOPY BEYOND 1 as ne EQUIVALENT FEATURE BE CONFIRMED BY EQUIVALENT FEATURE
FuTURE DETAR. 1: WH FABRIC UNING ON NYDRALUC ENGREEe SCREENON TOP OF HYDRAUUC, SCREEN TO FUTURE DETAR
ace PAINTED WALL
Seale 1:250
CONCRETE WALL PANELS) ROOFIOP MECHANICAL UNIT =~ ‘COLORSOND METAL —
TO STRUCTURAL | was touvee scmeeneic 10 EAVES GUTTER 2
ENGINEER'S SPECIFICATION MECHANICAL ENGINEER'S DOWN PE

 

TOP OF SCREEN
%

ENTRY BOX FEATURE

 

 

 

 

 

 

    

compactor —— METAL CLAD EXTERNAL: mororareo near our Crain wae
DOOR wim COLOR Rouse sauree MESH SUDING COOR Wath
BOND HEAD RASHNG BADE LOH BEARD. ADE
CLOTH SUPPUIED BY
WEST ELEVATION
Seale 1:250

 

 

a
MAW OUTY CHAIN wie
FENCE WITH SHADE CLOTH
BEHIND. SHADE CLOTH
SUPPLED BY FATOUT.

   

      

 

| pane Concrere — etat Lao extersuae ——!
Waal Panes Doom win COLOR
saiciniienlY
3
‘iis i ——#}
210 x 20 nooWo00 isban ODODE ii 4
‘OR EQUIVALENT IOP OR EQUIVALENT POST Pee
fave Ye ok
voomm moowoo0 oR —
Eguvalent PanesTO
Manceactuners
SrecRCATONS
tomm moowoo0 oe —
ecowaipst rane Yo
Manuractunert
etcimestons

 
  

FEATURE SCREEN DETAILS

Seale 1:20

Masters PM

Tiras
Tat

Encenau
SYDNEY

yiaeeeeian

 

 

 

 

 

eS
i

HEAVY DUTY CHAIN WIRE MESH—!

¥ NORTH ELEVATION v

WEST ELEVATION =~

EAST ELEVATION

 

ITH ELEVATION
SOUTH ELEVATION

KEY PLAN

LEFFLER SIME

 

Page 22

AMTED STRUCTURAL STEEL RAFTERS —_——

10 SIRUCT. ENG. DETANS

  

Maine ENTRY ROOF CANOPY
REYOND TO FUTURE DETAR

ea
ENGINEER'S DetaRs |

GROUND ROOR

   

     

MANUFACTURERS DETALS

 

 

 

 

 

ROCFIOP MECHANICAL UNA

MECHANICAL ENGINEES
DETALS

COLORBOND FASCIA 10
WIM LOUVRE SCREENING TO RETAIL CENTREROOF

—— BOXED GUTTER. SE TO WE —
CONFIRMED BY HYDRAULIC
ENGINEER

MECHANICAL UNE COLORBQHO METAL

WITH LOUVRE IC REBNENG TO EAVES GUTTER &
COWNPIPE 2EYOND
ROOF OVERHANG.

 

       

 

 

 

THIS DRAWING AND DESIGN IS SUBJECT TO
COPYRIGHT AND MAY NOT BE REPRODUCED

 

         

Ao. WITHOUT PRIOR WRITTEN CONSENT OF
LEFFLER SIMES ARCHITECTS
amie OAs a
molt awit aan
simi. on enue se
eer ne ar) '51v8D FOR COORDINATION iss
USS STRUCTURAL er) t (REESUE FOR NFORMATION: we
RLIS25 nou + FEVSED A HOR APPROVAL ws

CONCRETE WALL PANELS 10
‘STRUCTURAL EMGIONERR'S
SPECICATION.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

  

 

 

 

 

    

CONCRETE WALL PANELS 10 GLAZED AUTOMATIC —— NOMEDGUTER STEIO == | CONCRETE STRUCTURALSTE — GLARED AUTOMATC — nxt guitea, sue 10 R CONCRETE SLAB
STRUCTURAL ENGINEREY SLIDING DOOR BEYOND HE CONMEMED BY ROOR NEN COLUVN-BEYOND AS SLIDING DOOR BEYOND 88 CONFIRMED 8Y AND FOOTING 10
IECRICATION HOORAUUT ENGINES PER STRUCTURAL HYORAUUC ENGINEER STRUCTURAL
SECTION A:A ENGINEERS ESIGN ENGINEERS OEMS
f } Scale 1:250
PARCIED SmRUCTURAL STEEL RAFTERS ——————- METAL ROOF SHEETING ROOMOP MECHANICAL UNT =—-— ROOF ROGE —-ROOFTOR MECHANICAL Unt — COLORBONO METAL ’
TO STRUCT. ENG. OETARS OOF siRUCTURE TO Witt LOUVRE SCREENING TO Wit LOUVRE SCREENING TO eaves Gutter a
aN STRUCTURAL ENGINEERS AND MECHANICAL ENGINEERS MECHANICAL ENGINEERS COmNPE
fl MANUFACTURERS OETARS OeTARS DETAKS
( ROOF OVERHANG TO STRUCTURAL — — | ROOFS” —— mie 4008 517 —— TOP OF SCREEN ROOF OVERHANG —
TOP OF MAIN ENTRY \enacinsteirs DETAILS R802
FEATURE WALL \
m 1850 | | \
NDGE LEME Gultnie OF Betsy BOR GEFEN =} ho — se Z \
STPARAPET (EVE, = = —= == 5
am ‘COLORBOND METAL EAVES. a
se x GROOVELINES 10
GUTIER & DOWNPPE CONCRETE WALL
mam exter ROOF CANOPY — a ——™ i} a Cae
BEYOND 10 FUTURE DETAL ‘. Lat , |
GRouno ROOK , ' goups f MM {
ons 2 Zz i Led I | a
1 1
~ t |
J | }
CONCRETE WALL PANELS 10 —— GLAZED AUTOMATIC —— 2c. Fo0TNIG 10 — — ——- emvctueas ste motomsen — concecewau —  \—-R. cONcRMESLAB
STRUCTURAL ENGINEERS SLIDING 0008 BEYOND STRUCTURAL ENG. DETAR CORUM REVONO AS ROWER SHUTTER Panes 10 AND FOOTING 10
SPECICATION, — CONCRETE FLOOR PIMs, PER STRUCTURAL STRUCTURAL STRUCTURAL
|_ siereacur anboee ENGINEERS DESION ENGREERS ENGRIEEWS OETANS
SECTION B:B aEvOND Seton RACKING HEIGHT
Scale 1:250 Scale NTS
== PANIED SRRUCTURAL STE, RAFTERS METAL ROOF SHEETING AN ROOMOP MECHANICAL UN ROOF RDOE —_—ROOMOP MECHANICAL Wea? COLORBOND METAL
TO STRUCT. ENG. DEIARE ] ROOK STRUCTURE TO Wt LOUVRE SCREENING 10 {WITH LOUVRE SCREENING TO AVES GUTTER A ]
STRUCTURAL ENGINEERS AND MECHANICAL BNOMEEES MECHANICAL ENGINES DOWnPrE
METAL CLADDING TO - MANUFACTURERS DETALS eras Omrats |
~ 7 INSIDE FACE OF PARAPET |
oP OF mane troy > WORED SUTTER. SHE 10 8 —— 7 ROOF STE ‘ oe oof st? —— TOP OFSCREX ROOF OVERMIANG — KEY PLAN
‘OMFRMED BY HYORAULC O¥GIN \ 2
( FEATURE WALL } - hala al | \ 19.82 |
\ _L. FE. SLADDING AND GAPPING. ON — ~ j \ { \ \
Seth FeAMNG TO STRUCT (NO. z ; \ . si i \
Derats. | !
TH Groove wes to
| | ei CONCRETE WALL
| PANELS, PART Frese
1-7 — me mie
r Ey bg 74
x 1 |
\ eo Ceres ene On was oie
/ | | ‘
r GLAZED AUTOMATIC —— - B.C. FOOTING 10 —— — STRUCTURAL STER MOTORSED ——~ CONCRETE WALL \ CONCRETE BAB
‘SLIDING DOOR BEYOND STRUCTURAL ENG, ETAL EQuwencrono as ROWER snUTTER Fares 10 ano root 10
OWGAETE FLOOR Preah STRUCTURAL STRUCTURAL STRUCTURAL
« are ENGINEERS DESIGN: ENGINEER'S: ENGINEDRS DETARS
SPECHICATION
$48 SHADE ON POST - METAL ROOF SHEEN AND — THERMAL —— ROOROP MECHANCAL UNIT — METAL CLADONG | ROOFIOF MECHANICAL UN — THERMAL SKYLIGHT —"ROOFIOP MECHANICAL UNET METAL ROOF SHEETING AND — SAV OUTY CHARA Witenes ——
« ROOF STRUCTURE TO SRYUGHT Wits LOUVRE SCREENING TO TOINSIOE FACE OF WITH LOUVRE SCREENENG 1 system WITH LOUVRE SCREENING 1 «ROOF STRUCTURE TO. FENCE AND SEONG DOOR wine
" STRUCTURAL ENGINEERS system MECHAMICAL EWODSEER'S. PARAPET BEYOND MECHANICAL ENGINEERS. | MECHANICAL ENGINEERS. STRUCTURAL ENGINEER'S AMO) SHADE CLOTH BEMINO. SHADE CLOTH
- MANUFACTURERS DETAKS OUTARS | MANUFACTURERS OBTAGS SUPPUED BY FOUT
aia COLORBOND JOP OF SCREEN TOP OF SCREEN VOP OF SCREEN CANTILEVERED ROOF
TOP OF MAIN ENTRY | FASCIA 10 RETAL | 1998 aU 1998 aoor ance | mivsn CANOPY ABOVE LOADING.
WALL CENTRE | ¥.
cOLORBOND —

 

   

 

CONCRETE FLOOR
Finis

— moowood Of FOUVALENT
FEATURE SCREEM Wil} FABRIC
LINING ON THE INTERNAL FACE.
REFER TO DETAIL 5, DWO DADS,

(4 SECTION D:D
= 2 Seole 1:250

PAINTED STRUCTURAL
STEEL COLUMNS TO
STRUCT. ENG. DETAILS

INSULATED WALL
PANELS

 

GLAZED AUTOMATIC.

fener Amocn

SLIDING DOOR BEYOND

   

GLAZED AUTOMATIC
(aT ARLOCK)

— PAINTED RC SHEET
‘SLID DOOR BEYOND ean

     

  

 

 
 

CONCRETE SLAB AND
FOOTING To STRUCTURAL
ENGINEER'S DETALS

MOrORNED.

CONCRETE FLOOR ~
ry ROUEN SHUTTER Finish

Masters WW

LEFFLER SIMES

 

Page 23

THIS DRAWING AND DESIGN IS SUBJECT TO

COPYRIGHT AND MAY NOT BE REPRODUCED

WITHOUT PRIOR WRITTEN CONSENT OF
LEFFLER SIMES ARCHITECTS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

21

Page 24

Ko” memes

i sees
WITHOUT PRIOR WRITTEN CONSENT OF

= enemas

meek On enue ase
SEVUGNT SYSTEM

WALKWAY

ROOFOP PACKAGED NT

 

 

  

 

=
Sar owets
Bear eeacete
ser pencne
Bune
Serena
Seealincesntanes
Seemann
pel
raasock sien
went
(2) SCREEN ELEVATION (2 SCREEN SECTION
\ea20i] Scole 1:50 \GA201) Seale 7:50
+ = + —— sconce mccaces una
Tucoucacn HONEEES
Bena nsonrecnchners
OftAas
Ta)
‘SOMEX (OUVER SYS kaw REF KEL0D405. =
Er eenenG AaoiUM Ser iowver sre ne
iooven exes Bias wonton
err aneenceee enaas 00
Sencar roramnasions i
ioe aneencioeees
DETARS AND SPECICATION
ROGE LEVEL BEYOND FORRSTAMLARCH MO
— moce eve tron
METAL ROOF SHEETING a _
METAL ROOF SHEETING
Senior svat fang
Sewer srs

     

(3. SCREEN ELEVATION
ey Scole 1:50

(2 SCREEN ELEVATION
es Seale 1:50

  

22

 

Page 25

>

 

TOP OF MAIN ENTRY
FRATORE WALL

ghe ee
Rreoas Dulhiie OF Bite BOR BeKOHIC =
SPARAPET (EVEL a — c
R100

: \ SECTION B
Scale 1:250

—LANOSC APE AS FER LANDSCAPE

>

ROOMIOP MECHANICAL UNIT

 

2008 noaE

ROOHOP MECHANICAL UNIT — PEDESTRIANS UNE OF VISION
WITH LOUVRE SCREENING TO

MECHANICAL ENCINEER S

DETARS

TOR OF SCREEN

 

 

 

 

 

PEDESTRIANS LINEOFVSION —-GUTLINE OF ENTRY BOX.

 

 

See MAIN BUIRY ROOF CANOHY)——>
cea BEYOND 1O FUTURE DEAN,
yo rN

 

 

JABAL RODE SHRETING AND.
ROOF STRUCTURE TO.
STRUCTURAL ENGINEERS AND
MANUFACTURERS DETARS

ROOM? MECHANICAL UN 2008 RIDGE
‘WIM LOUVRE SCREENING 10

MECHANICAL ENGINEER'S

DETALS

——LANOSCAPE AS PER LANDSCAPE
ARCHITEC SPECYRCATION

 

 

 

 

 

aR THIS DRAWING AND DESIGN IS SUBECT 10.
Manber COPYRIGHT AND MAY NOT BE REPRODUCED
WITHOUT PRIOR WRITTEN CONSENT OF

Aeon
LEFFLER SIMES ARCHITECTS
sek onset we
noe 8 REVEED DA FOR APPROVAL ae

 

GROUND ROOR
gma

 

SECTION C:C

Scale 1:250

 

 

 

 

   

SECTION D.
(J sesie 1:250

 

 

 

 

 

 

 

a
is

Masters PRs

KEY PLAN

 

 

 

 

LEFFLER SIMES

DA-12

 

Page 26

AM THIS DRAWING AND DESIGN IS SUBJECT TO

 
 
 
 

Member (COPYRIGHT AND MAY NOT BE REPRODUCED
\ WITHOUT PRIOR WRITTEN CONSENT OF
! { ' LEFFLER SIMES ARCHITECTS:
' ‘ —
4 4 ‘ t ST 5
Piss Meare ES SS
= 7oasn 4 Da
fi
a ae

202

cr ce

2892.03

RETAINING WALL TO. — Bese

* CIVIL ENGINEERS, stort gosta
OETARS :

  
 

O57

 

 

    
    
   

 

g§ irr SECONDARY
CARPARK ENTRY/EXIT & SSA OOS

 
 

RETAIL CENTRE
5:2405GM

 
   
 

END OF TIP FACILITY:
2SHOWER/IOLET, CHANGE

 

  
  
  
 
 
 
 
 
  
 
 
 
 
 
 
  
  
  
 
  

 

 

 

 

 

 

 

 

 

MASTERS SITE AREA (STAGE 1) =
PADSIEAREA(STAGE2) = 7AB0 SQM.
TOTAL SITE AREA = 38791 SQM
MASTERS GFA:
RETAIL CENTRE = 62405QM
GARDEN CENIRE = 995 SQM
TIMBER CENTRE . 857 SQM
RECEIVING. = 861 SQM.
= =

TOTAL MASTERS GFA = 9277 sQM
TOTAL UNCOVERED USE AREA = 54550M
TOTAL MASTERS USE AREA = 9.822S0M
MASTERS CAR PARKING |
DSABLED = _BSPACES
ORDINARY = 250 SPACES
TOTAL CARPARKING = (258 SPACES SEGEND:

(138.1 SQM)
STE COVERAGE. GROSS FLOOR AREA
SITE COVERAGE s UNA
‘OVERALL SITE COVERAGE . 295%

UNCOVERED USE AREA
LANDSCAPING TO LANDSCAPE a
ARCHITECT'S DRAWINGS

 

 

 

 

 

 

 

 

Page 27

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

THIS DRAWING AND DESIGN I5 SUBJECT TO.
COPYRIGHT AND MAY NOT BE REPRODUCED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 
 

 

 

   

 

 

 

 

 

 

 

 

 

 

— WITHOUT PRIOR WRITTEN CONSENT OF
LEFFLER SIMES ARCHITECTS
Te TT
COLOROND Weta: Eaves erat — true comcast — Tianey sGuAce seta INCALUMEMETALROOF. —— COLUMNS TO STRUCTURAL
GuiteR & DOWNeIPE TO CLADDING PANELS WIM SELECTED IQHTIOR TO FUTURE CLADDING SHEETING 10 SIRUCTUBAL ENGINEERS DEVAS
x HYDRAULIC ENGINEERS OFAKS Paint Foust APPLEATION ENONEERS AND no 8 scar aa eae
; MANUSACIOPINS DETARS
; 7 — = a — +
3 “< (7 COLORIOND METAL EAVES:
er SGUTER & DOWNERS TO
HYORAUUC ENGINEERS DETALS
\ =
SS = a
MEAL CLADONG
'
— ATED ALUMNI
‘SUArED sHortRONT
1 a ° = -
; | , !
|
TATU? CONCRETE ! TUTUP CONCRETE POWDERCOATED ALUMNA — TATUP CONCRETE PANELS:
Panes wit PANELS Wits GUARD BHOPFRONT (7H SELECIED PAT Pan
SELECTED Pant Peat SELECTED Pane Pes
t POWDERCOATED
ALUaAn GLAZED
Pt
coumi — Ke COLCRRONO METAL EAvEE —— rouwcy MEAL — -————corumarosucraar—- ——_ —— estat ROOF — (hee concent pans
stRucTueAL Cason GumEe LDoWnreE TO. Lortaax to runote cuxcone | Deans SHEETING 10 SRUCTUAL eee
‘AND
+ !
a ro harur cor WN SIORES —
a 1 WeW SRTED Pane) PG
| he — -
TIN. oil T ‘ ‘ Jes
i= 0 OF me ACAI )
IORET, CHANGE
room ANOS LOcKaRe
' A\
—, L__ sours L__ nw concer screen rouse — — : ——eor—or
NORTH ELEVATION ‘SIRUCTURAL poor PANELS WITH SHUTIER OCOR %
ENGNEERS DETAUS SELECTED PART RNGH |
Seale |
$$ onncsins—)
ALUMINIUM GLAZED TOTAL AREA |
GFA 1.737 SQM 3
CONCRETE ROOR Fuse 3 fi -
rere aCe, 1 =
Sere | DOGURODE
ah Sree
COLORIOND METAL EAVES — Sa vs — ' ria 1
GUTTER & DOWNPIPE TO 1B DOWNPRE IO * BLACT LEVEL TO BE 1 | 5 —
HYDRAULIC ENGINEERS DETARS | RYORAUUC ENOWEEEY DEIALS CONHRMED BY CIVIL ENOINEER Ni ail
ohm’,
— - wend en of be |
1 Ae , y
| \ h
; \ 4s
DATED ——— 4 1
‘Union GLALED 1 :
| i | fi
'
'
'
| :
* se t Ne Bc (
1
| | rs
5 : mentee)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TRIUP CONCRETE PANELS,
WIM SELECTED PANT FRSGH

'
- ; NORTH ELEVATION ~ é } TENANCY FLOOR PLAN
Scale 7:10 Seale 1:250

Masters PW®

ore tee ‘ rt

  

By a

 

Page 28

 

LANDSCAPE PHOTOMONTAGE

+ Refer Photos on LC-04 tor
Indicative Views from this Position
ond angle

PROPOSED TREES - Refer Plant
Palette on LC-06 for Container
Sizes & Species

PROPOSED FEATURE TREES -
Refer Plant Palette on LC-06 for
Container Sizes & Species
PROPOSED CARPARK/SMALL
TREES - Per 6 cor baysRefer Plant
Palette on LC-06 for Container
Sizes & Species
FEATURE/MIDDLESTOREY

PLANTS - Reter Plant Palette on
LC-06 tor Container Sizes & Species

UNDERSTOREY/
GROUNDCOVERS - Refer Plant
Palette on LC-06 for Container
Sizes & Species

EXISTING PLANTING TO BE
RETAINED

       

High canopy and low grounccover planting to maintain sight lines
' and passive surveillance opportunities from street to building, as per
standard Crime Prevention Through Environmental Design principles.

 
 

DECORATIVE BOULDERS

  
 

Proposed Masters Home Hardware Buliding.

  
    

Advanced trees with dense understory planting to carpark medians
(1 per 6 car bays) and traffic islands to increase pedestrian comfort
through increased shade levels and reduced visual impact of car park

 
 

PROPOSED DECORATIVE

    
     

hardstand.
4 Clear trunked canopy. shade trees to car bees bays to be, minimum, ROCK MULCH
P 100L container stock with non invasive roots & low levels of leaf drop. PROPOSED SUPPLEMENTARY

  
  
 

Re
@
C3] PROPOSED GARDEN BED
ie
S

 

PLANTING TO AREA OF
EXISTING NATIVE VEGETATION

mmm mm PROPOSED SUPPLEMENTARY
PLANTING TO AREA OF
EXISTING NATIVE VEGETATION

 
 
 

5 Advanced endemic trees to primary customer entry point with earth
mounding, bouiders and massed groundcovers to create landscape
feature statement and buffer car park from road.

    
 
  

é Advanced Eucalyptus spp. intensive screen planting to buffer proposed
building from new road frontage.

 
 
  

Bold colour foliage planting to signage surrounds to increase visual

   

 

7. impact and site legibility.
BIO RETENTION - Pr ed

8 Dense screen planting about tanks ion pump house to reduce visual bio retention area oaerch
qd impect on adjacent properties without inhibiting service access engineers drawings. To be

9 Landmark feature trees to site entry points to be advanced endemic planted with wetland species,
| : habitat species. Species must also be drought

/ tolerant due to wet/dry cycle

i Raised planter beds in fron! of building planted with large shrubs of small at proposed storm water

10. trees to break up continuous exterior building surface.
systems.

 

 

 

Environmental rehabilitation corridor (Covenant Area} with ail existing
n. endemic vegetation to be retained, ail exotic weeds removed and

tubestock planted as per SCRC guidelines and council conditions in

notes below. Temporary fencing to be installed through the construction

phase to protect existing trees.
1 Electrical transformer, pumps. bin storage areas to be screened trom
2. view with vegetation or timber baton screen where gardens are no!
Possibie
13. Site perimeter planted with fast growing native trees.
4 Stage 2 - future development to be turfed on completion of stage 1.

 

 

 

 

 

 

 

 

=
Notes: Landscape Design is compliant with the following council conditions <x
Where koala access |s impeded by a fence or - Restoration and replanting of alll covenant areas - Removal of all weed species listed in the following - Existing trees in the covenant areas and - Maintenance establishment period top be 12 od
retaining wall; and the northern road reserve areas adjacent to the standards and Reon: in the road wen? must beretainedin months
Eenie Creek Road to provide a visual buffer to the Declared ps ints under the Land Protection (rest accordance with an arbonst report submitted fsa 7 Zz
- Climbing poles are to be erected at regular development, including understory, mid story and and Stock Route management) Act 2002 and su’ for operational wor for the development - Imigation and imgation water supply to all
intervals Giong the structure at an Sppecamcte 45 Sanopy Species in accordance with restoration plan ordinate regulation 200: prepared by a quaii ed paisan and referenced proposed new landscape areas (excludes
degree angle on either side of the structure: submitted for operational works approval. Z s ‘ in a Development Permit for Operational Works covenant areas) LS
a haat > Undesirable species as listed in Planning Scheme : 4 nie ? .
- Plant vegetation within close proximity {branches - Vegetated screening of northern and eastern Policy 3 Landscaping Plants and Guidelines - Tree Plantings must maintain a minimal - Tree root barriers to be provided to car park =
foucrang) ‘on either side of the fence to provide a boundaries of the site designed such that 75% of the bulk horizontal clearance of Im from Unitywater shode trees adjacent to any storm water
natural ladder; of the building, including roof form will be screened in 5 - All landscape works must be established and watermains, and 1.5m from Unitywater | treatment devices ra
= years maintained in accordance with horticultural best pevigroge mains. Landscaping plants within
- Install panels or planks horizontally along the . : ‘actice with construction techniques and imigation these clearances must be low growing when
top of the fence to provide a walkway, where - Vegetated screening of any electrical tramsformers, hat allow for healthy, sustained and vigorous plant mature and suitable approved varieties O
appropriate; pumps, bin storage areas or ancillary mechanical plant rowth. All plant maternal must be allowed to grow to r
. . equiptment from the car park and road frontages full form and be refurbished when it's life expocioncy - Environmental weed species {camper j
- Use fence materials, such as a timber post and rail oom a is reached, faurel, lantana) cleared from site shall not be
or chain wire, that o koala can Sosy orb and climb ~ Provision of root barriers to all car park shade trees : mulched, with the material fo be removed from LJ
or leave a minimum 300mm gor between ground adjacent to any storm water treatment devices to - All landscape works must be maintcined generally in the site and disposed of in a council approved
level and the first rail or strand of any fence. prevent tree root infiltration of storm water media or Seenraance wth the approved design for the life of refuse tip >
pipes je developmen’
LL
Oo 10 20 30 40 50 fy
teak —
‘ lent Caeng Te
z lane HYDROX NOMINEES PTY LTD LANDSCAPE MASTERPLAN
te Project:
: f HOME IMPROVEMENT STORE - NOOSA scow: own checked
EENIE CREEK RD, re me Oe
NOOSA. GLD 4566 fei corer: me DG
112014.1 LC-02 D
—1 —s ==
Very Gmensions ono lnvae OF ie Galore telling our Conor ica, Feter Concer cence Boidlen aes taaoata

  

te figuied dimensions «mm unless slated otherwhe Copytight vO Pt, itd

 

Page 29

® Queensland
» Government

  

13 November 2012

The Chief Executive Officer

Sunshine Coast Regional Council
Locked Bag 72

Sunshine Coast Mail Centre QLD 4560

Attention: Jack Lewis

Dear Sir
CONCURRENCE AGENCY RESPONSE — CONDITIONS

Proposed Development: Development Permit for Material Change of Use —- Undefined
Use (Home Improvement Store) and Retail Business Type 4

(Showroom)
Real Property Description: Lot 1SP222982, 4SP246584
Street Address: 2 Hofmann Drive, Noosaville QLD 4566

Assessment Manager ref.: MCU12/0051
Local Government Area: Sunshine Coast Regional Council

Reference is made to the referral agency material for the development application described
above which was received by the Department of Transport and Main Roads (the
department) under section 272 of the Sustainable Planning Act 2009 (SPA) on 1 June 2012.

An assessment of the proposed development has been undertaken against the purposes of
the purposes of the Transport Infrastructure Act 1994 for state-controlled roads, the purpose
mentioned in section 258(2) of the Transport Infrastructure Act 1994 for railways and land
use and transport coordination under the Transport Planning and Coordination Act 1994.
Based on this jurisdiction, the department provides this concurrence agency response under
Section 285 of the SPA in accordance with the following submitted material:

The department advises the assessment manager that it requires conditions to attach to any
development approval for the application. The department would also like to provide advice
about the application to the assessment manager under Section 287(6) of the SPA.

Department of Transport and Main Roads Our ref TMR12-002868
Program Delivery and Operations Your ref MCU12/0051
North Coast Region / Sunshine Coast Office Enquiries Richard Day
12 First Avenue Maroochydore Queensland 4558 Telephone +61 7 5370 5556
PO Box 1600 Sunshine Plaza Post Shop Maroochydore Facsimile 461 7 5370 5598
Queensland 4558 Website www.tmr.qid.gov.au
Email [email protected]

Page 1of2
27

Page 30

Under Section 325(1) of the SPA, the assessment manager must therefore attach this
response, including the enclosed Department of Transport and Main Roads Concurrence
Agency Conditions and Statement of Reasons, to any approval for the application.

The department may change its concurrence agency response in accordance with Section
290(1)(b) of the SPA.

The department must be provided with a copy of the assessment manager's decision notice
regarding the application within five (5) business days after the day the decision is made in
accordance with Section 334 of the SPA.

A copy of this response has been sent to the applicant for their information.

If you have any questions or wish to seek clarification about any of the details in this
response, please contact Richard Day on 07 5370 5556.

Yours sincerely

a ———~

Stuart Duncan
Principal Advisor (Development Assessment)

Enc. (1)

Cic —_ Hydrox Nominees Pty Ltd
C/- Urbis Pty Ltd
Level 7 123 Albert Street
Brisbane QLD 4000

Page 2 of 2

28

Page 31

 
  

Queensland
Government

Our ref.: TMR12-002868
Yourref.: LTR-151012

Cl —_ Hydrox Nominees Pty Ltd
C/- Urbis Pty Ltd

Level 7 123 Albert Street
Brisbane QLD 4000

Attention: Ashley Lane

Please find attached correspondence for your information and action as required. Should
you wish to discuss this correspondence, please contact Richard Day on 07 5370 5556.

Yours sincerely

Ag

Stuart Duncan
Principal Advisor (Development Assessment)

13 November 2012

Ene. (1)

Page 1 of 1

29

Page 32

Y becsopnlbonalbe
WN Government

   

Department of Transport and Main Roads
Concurrence Agency Conditions and Statement of Reasons

Proposed Development: Development Permit for Material Change of Use— Undefined Use (Home Improvement Store) and Retail
Business Type 4 (Showroom)
Real Property Description: Lot 1SP222982, 4SP246584

Street Address: 2 Hofmann Drive, Noosaville QLD 4566
Assessment Manager ref.: MCU12/0051
Local Government Area: Sunshine Coast Regional Council

 

 

         

‘Development Permit for Material Change of. Use— Unde Ine se (Home Improvement Store) and Retall Business Type 4 (Showroom).

41 |The development must be carried out cenorally' in accordance with Ip Prior to the commencement |Land use and transport coordination under the
| the following plans, except as modified by these concurrence jof use and to be maintained | Transport Planning and Coordination Act 1994.

| agency conditions: |at all times |

| | | The purpose mentioned in the Transport

| e Site Plans Stage 1 and 2, Leffler Simes Architects, DA-03 & | | Infrastructure Act 1994, section 258(2).

| DA-20 (Issue D), April 2012 | |

| | | The Department of Transport and Main Roads’

| | assessment of the development application was

| undertaken on the basis of the cited plans which

| depict how the proposed development will be

| carried out.
| Saleen ee Ree ae
2 |The development must include bicycle parking facilities for Prior to commencement of |Land Use end ‘Transport Coordination under the
|employees and customers for each of the uses within the proposed | use and to be maintained at | Transport Planning and Coordination Act 1994
| development in accordance with the equivalent land uses, rates _[all times | (TPCA).

| | and classes ‘specified in Table | c2 (page 90) of AUSTROADS

Licclol- elec}

 

Page 33

ihe a nla
YN cere lea ural

   

| Guide to Traffic Management - Part 11: Parking (2008), aaienit
| where development is subject to the Queensland Development
|code, Mandatory Part 4.1 — Sustainable Buildings.

|
ai hehe

 

 

 

 

 

 

 

| The way the object of s8A of the TPCA is to be
| achieved includes ensuring development |
| Supports active transport and active transport

| infrastructure i is provided, as far as practicable, to | |
| | support active transport.

 

3 | (a) The development must provide a pathway from the retail centre
| entry to the Hofmann Drive site access as shown in Site Plans
| Stage 1 and 2, Leffler Simes Architects, DA-03 & DA-20 (Issue D),
| April 2012 in accordance with the following standards:

access suitable for use by people with disabilities in
accordance with the Disability Standards for Accessible
Public Transport 2002 - subsection 31 (1) of the Disability
Discrimination Act 1992.

| AND

(b) The applicant must provide RPEQ certification to the

| Department of Transport and Main Roads that the development
|has been designed and constructed in accordance with part (a) of
| this condition.

 

| | Land Use and "Tranepent Coordination under the
| Transport Planning and Coordination Act 1994
(TPCA).

(a)

Prior to the commencement
of use and to be maintained
at all times |
| The way the object of s8A of the TPCA is to be

| achieved includes ensuring development

| supports active transport and active transport
inspection certificate or | infrastructure is provided, as far as practicable, to
certificate of classification, | support active transport.

whichever is applicable, or |

prior to the commencement |

of use, whichever occurs
first.

(b)

Prior to obtaining a final

|
|
|
|
|

Page 2 of 3

 

Page 34

iN

te TTTTieie tiie}
Government

 

  

petty SSeS tests diss 3

infrastructure unless the person has written approval from the Chief Executive.

 
  

      

Section 311 of the Transport Infrastructure Act 1994 states that a person must not interfere with or carry out works on busway covenant i

 

The Department of Transport and Main Roads’ technical standards and publications can be accessed at
http:/Awww.tmr.gld.gov.au/Business-industry/Technical-standards-publications.aspx

 

The Transport Planning and Coordination Regulation 2005 is available at: www.legislation.qld.gov.au

 

TransLink’s TransLink Public Transport Infrastructure Manual 2007 is available at:
http://translink.com.au/about-translink/what-we-do/public-transport-planning/public-transport-infrastructure-manual

 

The Queensland Development Code (QDC), Mandatory Part 4.1 — Sustainable Buildings requires end of trip facilities (including bicycle
parking and storage facilities, lockers and change rooms) to be provided for employees or occupants in Major Developments located in
designated local government areas. Major Development includes commercial office buildings, shopping centres, tertiary education
facilities or hospitals with a floor area greater than 2000m2 or development specified in a local govemment planning scheme for the
purposes of QDC MP4.1. The applicant is responsible for achieving compliance with the QDC when obtaining any necessary
development permits for building work for the proposed development.

A local government planning scheme may require additional end of trip facilities to be provided as part of the development.

 

Pursuant to Section 580 of the Sustainable Planning Act 2009 it is a development offence to contravene a development approval,
including any condition in the approval.

 

 

 

 

Page 3 of 3

 

Page 35

INFORMATION ATTACHMENT TO CONCURRENCE AGENCY RESPONSE

Representations on Referral Agency Response

lf the applicant intends to make a representation to the Department of Transport and Main
Roads (the department) regarding the attached concurrence agency response, the applicant
needs to do this before the assessment manager decides the application. The assessment
manager cannot decide the application before 10 business days after receiving the final
concurrence agency response, pursuant to section 318(5) of the Sustainable Planning Act
2009 (SPA).

The applicant will need to give the assessment manager written notice under section 320(1) of
SPA to stop the decision-making period to make a representation to the department and
subsequently contact the department to make the representation. The decision making period
cannot be stopped for more than 3 months.

Planning and Environment Court Appeals

If an appeal is lodged in the Planning and Environment Court in relation to this application, the
appellant must give written notice of the appeal to the department under Section 482(1) of the
SPA. This notice should be forwarded to the Planning Law Team, Planning Management
Branch, Department of Transport and Main Roads, GPO Box 213, Brisbane QLD 4001 within 2
days if the appeal is started by a submitter, or otherwise within 10 business days after the
appeal is started.

33

Page 36

 

Notice

Concurrence Agency Response and Advice Agency Response

 

This notice is issued by the Department of Environment and Heritage Protection (EHP) pursuant to section 287
(concurrence agency response) and section 292 (advice agency response) of the Sustainable Planning Act 2009 ("the

Act’).

Sunshine Coast Regional Council
Locked Bag 72

SUNSHINE COAST MC 4560
Attention: Jack Lewis

ce, Hydrox Nominees Pty Ltd
C/- Urbis Pty Ltd
Level 7, 123 Albert Street
BRISBANE QLD 4000

Our reference: 388515

Re: Concurrence Agency Response and Advice Agency Response

1, Application Details

Assessment Manager ref:

MCU12/0051

Date application referred to EHP:

07 June 2012

Development approval applied for:

 

 

 

 

 

 

 

 

Development permit
Aspects of development:
Material change of use-Landinor | Sustainable Planning EHP ref. no. — 388515 EHP Permit
near a wetland Regulation 2009 - Schedule | No. SPAR04338812
7, table 3, item 21
Sustainable Planning EHP ref. no. — 388515 EHP Permit
Material change of use —- Coastal Regulation 2009 - Schedule No. SPCC04339012
management districts 7, table 3, item 5
Sustainable Planning EHP ref. no. — 388515 EHP Permit
Material change of use - Regulation 2009 - Schedule | No. SPCL04338912
Contaminated land 7, table 2, item 23
Development descriptions:

Development Permit for Material Change of Use for Home
Improvement Store & Showroom

 

Page 1 of 3 « 120607 + Version 1

Department of Environment and Heritage Protection

www.ehp.qid.gov.au ABN 46 640 294 486

@ Queensiand Government

34

Page 37

Notice
Concurrence Agency Response and Advice Agency Response

 

Property/Location description:
2-18 & 20 Hofmann Drive, Noosaville
Lot 1 SP222982 & Lot 4 SP246584
2. The Chief Executive, EHP concurrence agency response for each of the concurrence agency

referral jurisdictions for the aspects of development involved with the application is to tell the
assessment manager as follows.

(a)

 

Sustainable Planning EHP ref. no. — 388515 EHP Permit
Material change of use — Coastal Regulation 2009- Schedule | No. SPCC04339012
management districts 7, table 3, item 5

 

 

 

 

 

(i) Conditions must attach to any development approval, and those conditions are stated in the
attached part of this Notice for the above referral jurisdiction.

 

(b)
Sustainable Planning EHP ref. no. — 388515 EHP Permit |
Material change of use - Regulation 2009- Schedule | No. SPCLO4338912
Contaminated land 7, table 2, item 23

 

 

 

 

 

(i) Conditions must attach to any development approval, and those conditions are stated in the
attached part of this Notice for the above referral jurisdiction.

a The Chief Executive, EHP advice agency response for each of the advice agency referral
jurisdictions for the aspects of development involved with the application is to recommend to the
assessment manager as follows.

(a)

 

 

 

 

Material change of use-Landinor | Sustainable Planning EHP ref. no. — 388515 EHP Permit
near a wetland Regulation 2009 - Schedule No. SPAR04338812
7, table 3, item 21

 

 

(i) Conditions should attach to any development approval, and those conditions are stated in the
attached part of this Notice for the above referral jurisdiction.

4, General advice to assessment manager

Pursuant to sections 334 and 363 of the Act, a copy of a decision notice or negotiated decision notice issued
by the assessment manager must be forwarded to EHP as a referral agency for the relevant application at
PO Box 318 MAROOCHYDORE QLD 4558 and an electronic copy to [email protected] State’s Native Title Work Procedures provide that responsibility for assessment of native title issues for
an IDAS application rests with the assessment manager. Therefore, EHP as a referral agency for the
relevant application has not provided notification to native title parties.

 

Page 2 of 3 = 120607 « Version 1 Department of Environment and Heritage Protection

35

Page 38

Notice
Concurrence Agency Response and Advice Agency Response

 

Enquiries:
7 : , Joe Winzenberg
Chief Executive, Department of Environment and Heritage = Department of Environment and Heritage
Protection Protection

PO Box 318
Date: [6/4 [12 MAROOCHYDORE QLD 4558

Phone: (07) 5459 6123
Fax: (07) 54596190
Email: [email protected]

Attachments

The parts of this Notice referred to above for each of the EHP referral jurisdictions involved with the
application

 

Page 3 of 3 * 120607 « Version 1 Department of Environment and Heritage Protection

36

Page 39

Notice

 

Advice Agency Response - Referable Wetland SPAR0433812

This notice is issued by the administering authority pursuant to section 292 (advice agency response) of the Sustainable
Planning Act 2009.

Sunshine Coast Regional Council ce. Hydrox Nominees Pty Ltd
Locked Bag 72 C/- Urbis Pty Ltd
SUNSHINE COAST QLD 4560 Level 7, 123 Albert Street
Attention: Jack Lewis Brisbane 4000

Your Reference:MCU12/0051

Our Reference: 495971 / SPAR04338812
Re: Advice Agency Response

4, Application Details

Assessment Manager Reference: MCU12/0051

Date properly referred to EHP: 07 June 2012

Development approval applied for: Development permit

Aspect of development: Material Change of Use, other than for a domestic housing activity,

if any part of the land is situated in a wetland management area
Sustainable Planning Regulation 2009 - Schedule 7, Table 3, Item 21

Development description: Material Change of Use for Home Improvement Store and Retail
Showroom
Property/Location description: 2-18 & 20 Hofmann Drive NOOSAVILLE QLD 4566

Lot 1 on SP222982 & Lot 4 on SP246584

Recommendation

The Chief Executive, Department of Environment and Heritage Protection (EHP), makes the following
recommendation to the assessment manager:

Wetland:

The assessment manager should consider the potential impacts of the proposed development on wetland
values, including the water quality, natural hydrological flows and ecological functioning of the wetland.
Development should meet the following outcomes:

e Maintain ecological values of the wetland. There is no loss of wetland habitat and adverse impacts on
the functioning and integrity of a wetland from development are avoided. A report prepared and
certified by an appropriately qualified professional may assist the assessment manager to consider the
impacts of the development on the ecological values and functioning of the wetland. If adverse impacts
are unavoidable, the assessment manager is encouraged to ensure that the values lost are offset in

 

Page 1 of 3 120501

Department of Environment and Heritage Protection § Queensland Government
www.ehp.qid.gov.au ABN 45 640 294 485 .

37

Page 40

Notice
Advice Agency Response

 

order to achieve an environmental outcome equal or better than the wetland values that are impacted.
Refer to section 81A of the Environmental Protection Regulation 2008 for the list of wetland values.

Where a wetland management area is mapped as being of ‘high ecological significance under the
Queensland Coastal Plan it should be assessed against State Planning Policy 3/11:Coastal Protection
(SPP3/11). Refer to policy 3 Nature Conservation in SPP 3/11.

¢ Maintain wetland water quality. The water quality of any waters in and linked to the wetland is
maintained and managed to protect the environmental values of the wetland, and to ensure that the
water quality objectives listed under Schedule 1 of the Environmental Protection (Water) Policy 2009 are
achieved.

e Maintain wetiand water regime. The existing water regime (including surface and groundwater) within
and linked to the wetland is maintained and managed to protect existing natural hydrological processes
within the wetland ecosystem. This includes safeguarding natural fluctuations in size and location of the
wetland, and retaining and allowing for regeneration of native vegetation.

To ensure that the proposed development is able to meet the above outcomes, the assessment
manager is encouraged to consider the requirement for a buffer area between any proposed works and
the wetland. A wetland buffer has two components:

¢ asupport area adjacent to the wetland that maintains and supports the environmental values of the
wetland; and

e® aseparation area around the support area that protects the wetland from external threats such as
sediment and nutrient discharge from surrounding landuse.

Buffer distances should be maximised in order to maintain existing biodiversity values, habitat
connectivity and to minimise edge effects. Unless otherwise determined by a suitably qualified
professional, the following buffer widths are accepted by EHP as precautionary buffer widths likely fo
absorb impacts from external uses.

e within urban areas, a minimum 50m buffer to wetland
e outside of urban areas a minimum 200m buffer to wetland

Note: The Queensland Wetland Buffer Planning Guideline (2011) should be referred to when planning
detailed buffer design to position development, determine any alternative buffer widths and establish
operating measures that avoid adverse impacts on a wetland,

Where required, revegetation of the buffer is recommended using native species representative of the pre-
clearing regional ecosystem, with preference given to endemic species. Plants should be of local
provenance where possible. A rehabilitation’ revegetation management plan including weed management
strategies may assist in determining the rehabilitiation requirements for the development. Conditioning of any
approval with building or development envelope(s) may also be a useful way to give formal effect to any
required buffer area.

The assessment manager should consider requiring applicants to provide a Stormwater Management Plan
to demonstrate how stormwater, sediment and other run-off from the site (associated with the construction
and operational phases of development) will be effectively managed to prevent adverse impacts on wetland
values. Potential impacts are to be addressed through water sensitive urban design including compliance
with South East Queensland Regional Plan 2009-2031 Implementation Guideline No. 7: Water sensitive
urban design - design objectives for urban stormwater management. For areas outside of the South-east

 

Page 2 of 3 * 120501 Department of Environment and Heritage Protection

38

Page 41

Notice

Advice Agency Response

Queensland Regional Plan area any approval should recognise the requirements of The Urban Stormwater
Quality Planning Guidelines 2010.

General information for assessment managers

The State's Native Title Work Procedures provide that responsibility for assessment of native title issues for
an IDAS application rests with the assessment manager. Therefore, EHP as a referral agency for the
relevant application has not provided notification to native title parties.

Additional information for applicants

It is a requirement of the Environmental Protection Act 1994 that if an owner or occupier of land becomes
aware of a Notifiable Activity (as defined in Schedule 3 and Schedule 4 of the Environmental Protection Act
1994) being carried out on the land, or that the land has been, or is being, contaminated by a hazardous
contaminant, the owner or occupier must, within 22 business days after becoming so aware, give written
natice to EHP.

Aboriginal Cultural e

Under section 23 of the Aboriginal Cultural Heritage Act 2003 a person who carries out an activity must take
all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage
(the “cultural heritage duty of care"). Maximum penalties for breaching the duty of care are $1,000,000 for a
corporation and $100,000 for an individual.

Applicants will comply with the duty of care in relation to Aboriginal cultural heritage if they are acting in
accordance with cultural heritage duty of care guidelines gazetted under the Aboriginal Cultural Heritage Act
2003, available on the DERM website, or in accordance with an agreement with the Aboriginal party for the
area or a Cultural heritage management plan approved under part 7 of the Aboriginal Cultural Heritage Act
2003.

Applicants are also encouraged to undertake a search of the Aboriginal Cultural Heritage Database and the
Aboriginal Cultural Heritage Register, administered by the Cultural Heritage Coordination Unit, Department
of Aboriginal and Torres Strait islander and Multicultural Affairs (ATSIMA). Application forms to undertake a
free search of the Cultural Heritage Register and the Database may be obtained by contacting the Cultural
Heritage Coordination Unit on (07) 3239 3647 or on the former DERM website

Should you have any questions about the above, please contact Joe Winzenberg on telephone (07) 5459
6123, quoting the above reference number.

   

 

Delegate: Enquiries:
Ewan Bell Department of Environment and Heritage
Chief Executive admii ring the Sustainable Protection
Planning Act 2009 PO Box 318
Department of Environment and Heritage Protection MAROOCHYDORE QLD 4558
Phone: (07) 5459 6132
Date: ol i
Page 3 of 3+ 120501 Department of Environment and Heritage Protection

39

Page 42

 

Sustainable Planning Act 2009

EHP Permit * number: SPCC04339012

 

 

Assessment manager reference: MCU12/0051

Date application received: 7 June 2012

Permit type: Concurrence agency response
Decision: For a concurrence agency response

conditions that must attach to any development approval

 

 

 

Relevant laws and policies: Coastal Protection and Management Act 1995 and any related
statutory instruments and subordinate legislation

Jurisdiction(s): Material change of use — Coastal management districts
Sustainable Planning Regulation 2009 - Schedule 7, table 3, item
5
EHP ref. no. - 388515 EHP Permit No. SPCC04339012

Development Description(s)
Property/Location Development

 

2-18 & 20 Hofmann Drive Lot 1 SP222982 and Development Permit for Material Change of Use for
Noosaville Lot 4 SP246584 Home Improvement Store & Showroom

 

 

 

 

 

Reason(s) for inclusion of conditions

In accordance with section 289 of the Sustainable Planning Act 2009, the reason(s) for inclusion of conditions
stated in this permit required by the concurrence agency response for the application are as follows.

The Department of Environmental and Heritage Protection, Environmental Services, is recognised as a
concurrence agency under the Sustainable Planning Regulation 2009 for coastal management, other than
amenity and aesthetic significance or value. Development conditions placed on the development approval for
the application are in accordance with section 106 of the Coastal Protection and Management Act 1995.

' Permit includes licences, approvals, permits, authorisations, certificates, sanctions or equivalent/similar as required by legislation
administered by the Department of Environment and Heritage Protection.

 

Page 1 of 4 + 120607 « Version 1
Department of Environment and Heritage Protection Queensland Government
www.ehp.qid.gov.au ABN 46 640 294 485

40

Page 43

EHP Permit number: SPCC04339012

Delegate
Ewan Bel
Delegate, Chief Executive administering the Coastal Protection
and ManagemenrAct 1995

Department of Environment and Heritage Protection

paw tb {2

   

 

Page 2 of 4 * 120607 + Version 1 Department of Environment and Herltage Protection

41

Page 44

EHP Permit number: SPCC04339012

CONDITIONS

4 All works are to be constructed in accordance with the approved drawings and specifications listed
in the approved plans section of this permit.

2; All reasonable and practicable measures must be taken to avoid or minimise the risk of the release
of contaminants to waters.

The owner of the land the subject of this development approval must enter into a covenant with the local
government over the designated area of land shown as COV AB on Plan Number DA-09, titled Easement Plan,
dated April 2012. This area has been mapped as an Area of High Ecological Significance under the Queensland
Coastal Plan. Accordingly native vegetation in this covenant must be preserved and where appropriate,
enhanced with planting of additional native plants.

Any stormwater outlet from the site must be constructed and maintained to prevent or minimise localised
erosion or scouring, and, any erosion or scouring that occur must be repaired as soon as reasonably

practicable,
The development will cause no net loss of threatened species or their habitat, both in its extent and integrity.

END OF CONDITIONS

Approved Plans
DA-09 Easement Plan (attached)

 

Page 3 of 4 + 120607 * Version 1

Department of Environment and Heritage Protection

42

Page 45

SPCC04339012

EHP Permit number:

 

 

 

 

 

 

 

Page 4 of 4 » 120607 * Version 4

 

Department of Environment and Heritage Protection

43

Page 46

Sustainable Planning Act 2009

EHP Permit * number: SPCL04338912 (MCU)

 

Assessment manager reference: MCU12/0051

Date application received: 7 June 2012
Permit type(s}: Development Permit
Decision: For a concurrence agency response

conditions that must attach to any development permit

Relevant laws and policies: Environmental Protection Act 1994

Jurisdiction(s): 1. Material change of use - Contaminated land - Sustainable
Planning Regulation 2009 - Schedule 7, table 2, item 23

 

 

 

 

Development Description(s)
Property/Location Development
Lot 1 on SP222982 & Lot4 | 2-18 & 20 Hofmann Drive, Development Approval for Material Change
on SP246584 Noosaville of Use for Home Improvement Store &
Showroom

 

 

 

 

 

Reason(s) for inclusion of conditions

In accordance with section 289 of the Susfainable Planning Act 2009, the reason(s) for inclusion of
conditions stated in this permit required by the concurrence agency response for the application are as
follows.

? Permit includes licences, approvals, permits, authorisations, certificates, sanctions or equivalent/similar as required by legislation
administered by the Department.

 

Page 1 of 3+ 091217
Department of Environment & Heritage Protection ’ Queensland Government

 

Page 47

Permit number: SPCL04338912 (MCU)

The Department is recognised as a concurrence agency under the Sustainable Planning Regulation 2009
for the protection of the environment by the management of contaminated land. The Department's
concurrence agency conditions for this proposed development that are contained within this response are
required to prevent or mitigate any potential risk to human health or the environment from possible
hazardous contaminants present on the site.

dh ine

Kelli Ready Helen Bankes
Delegate, Chief Executive administering the Contaminated Land _
Environmental Protection Act 1994 Phone: (07) 3330 5616

Fax: (07) 3330 5754

Email; [email protected]
Date:

 

Page 2 of 3 * 091217

 

45

Page 48

Permit number: SPCL04338912 (MCU)

CONDITIONS

41. If during any site earthworks or excavation, offensive or noxious odours and/or evidence of gross
contamination not previously detected Is observed, site works are to cease In that area and action
taken to immediately abate the potential environmental harm. The administering authority is to be
notified in writing within two (2) business days of detection and advised of appropriate remedial action.

Any remedial action is to be developed by an appropriate qualified and experienced person in
accordance with Section 381 of the EP Act.

Additional comments or advice about the application:

The removal of any contaminated soil from land that Is listed on the Enviranmental Management Register
requires prior approval from the Department's Contaminated Land Unit under the section 424 of the
Environmental Protection Act 1994 (EP Act).

~ End of Conditions ~

 

Page 3 of 3 * 091217

 

46

Page 49

Newt

Department of Natural
Resources and Mines 01 AUG 28f

Notice

Advice Agency Response — Acid Sulfate Soils ([A0612NAM0015)

 

This notice is issued by the Department of Natural Resources and Mines pursuant to section 292 (advice agency
response) of the Sustainable Planning Act 2009 (“the Act”).

Sunshine Coast Regional Council ce.
Attn: Jack Lewis

Locked Bag 72

Sunshine Coast MC Qld 4560

Your reference: MCU12/0051
Our reference: Ecotrack 495996

4: Application Details

Date application referred to DNRM: 7 June 2012

Development approval applied for: Development permit

Development description: Material change of use (description (eg rural use to urban
residential)

Aspect(s) of development:

 

Property/Location description: Lots 1 on SP222982 & 4 SP246584
2-20 Hofmann Drive, Noosaville Home Improvement
Centre

2. Advice Agency Response
The Chief Executive, Department of Natural Resources and Mines (DNRM), Advice Agency response for the
application the subject of this Notice is as follows:

Recommendation

The State Planning Policy 2/02 Planning and Managing Development Involving Acid Sulfate Soils (SPP 2/02)
sets out the State's interests concerning development involving acid sulfate soils (ASS) in low-lying coastal
areas. The SPP 2/02 is triggered where a development would involve either of the following activities:

e excavating or otherwise removing 100 m? or more of soil or sediment from at or below 5 m AHD; or

e filling land below 5 m AHD with 500 m® or more of material having an average depth of 0.5 of a
metre or greater.

 

Page 1 of 5* 091217

Department of Natural Resources and Mines ® Queensland Government
www.dnrm.qid.gov.au ABN 59 020 847 551 47

Page 50

Notice
Advice Agency Response

 

e — filling land below 5 m AHD with 500 m° or more of material having an average depth of 0.5 of a
metre or greater.

Review of the application material indicates that earthworks would include either placement of more than
1000 m* of fill with an average depth of 0.5 m on land below 5 m AHD, excavation of more than 1000 m*
from at or below 5 m AHD or both. The Department advises that the proposed earthworks would be
compliant with the SPP 2/02 on the basis that the applicant meets the following recommended condition(s).

8.2 The applicant must provide the assessment manager with a competent ASS and groundwater
investigation. Such investigations must meet specifications contained within the State Planning
Policy 2/02 Guideline’, Guidelines for Sampling and Analysis of Lowland Acid Sulfate Soils (ASS) in
Queensland, 1998’ and the Acid Sulfate Soil Laboratory Methods Guidelines 2004°. The
assessment manager must be satisfied that investigations are adequate before any operational
works are permitted on the site.

8.3 Acid sulfate soil materials must not be used as fill unless properly treated. The applicant is to
provide adequate detail to the assessment manager confirming that all materials to be used for filling
are non-ASS, or ASS materials that have been fully treated and verified.

8.4 Placement of fill must not result in any restriction or exclusion to normal tidal ebb and flow (e.g. bund
walls or placement of fill within or across tidal waters). The applicant is to provide adequate detail to
the assessment manager confirming that tidal water will not be restricted or excluded from land as a
result of the filling. :

8.5 Placement of fill must not result in displacement and oxidation of underlying ASS. Hydraulic
displacement (e.g. mud wave) and slippage failures are caused by excessive or inappropriate
loading on top of soft sediments. The applicant is to provide adequate detail to the assessment
manager confirming that loading forces on underlying sediments have been considered and are
unlikely to result in failure and oxidation of ASS.

8.6 Actual Acid Sulfate Soils (AASS) likely come into contact with infrastructure (e.g. roads, gutters,
footpaths, private foundations) or located within 0.3 metres of the finished ground surface must be
treated with fine agricultural lime (98% purity or equivalent) at the rate prescribed in the Queensland
Soil Management Guidelines’.

Where buried service infrastructure (e.g. stormwater, sewer, potable water, power, phone) will or is
likely to come into contact with acidic groundwater's (pH < 4.0), the infrastructure and/or conduit
materials must be made from materials resistant to acid attack. Appropriate materials must be
selected for the conditions to ensure that service infrastructure reaches its expected design life.
Prior to operational works, the assessment manager must be satisfied that:

" State Planning Policy 2/02 Guideline — Planning and Managing Development involving Acid Sulfate Soils, Department
of Natural Resources and Mines and the Department of Local Government and Planning

? Ahern CR, Ahem MR and Powell B (1998). Guidelines for Sampling and Analysis of Lowland Acid Sulfate Soils (ASS)
in Queensland. Department of Natural Resources, Indooroopilly

3 Ahern CR, McEInea AE and Sullivan LA (2004). Acid Sulfate Soils Laboratory Methods Guidelines. In Queensland Acid
Sulfate Soils Technical Manual. Department of Natural Resources and Mines, Indooroopilly

* Dear SE, Moore NG, Dobos SK, Watling KM and Ahern CR (2002). Soil Management Guidelines. In Queensland Acid
Sulfate Soils Technical Manual. Department of Natural Resources and Mines, Indooroopilly

48

 

Page 2 of 5+ 091217 Department of Natural Resources and Mines

Page 51

Notice
Advice Agency Response

(a) The prescribed rate of agricultural lime has been incorporated into all AASS soils that
would come into contact with infrastructure and within 0.3 metres of the finished ground
surface. Bulked composite validation tests have conducted at a rate of not less than 1
test per 500 m® and a failure rate of less than 5% confirms that the treatment has been
successful.

(b) AASS and acidic groundwater are absent; or service infrastructure is constructed of
appropriate acid resistant materials.

8.7 All Acid Sulfate Soil excavated during trenching must be appropriately managed. The applicant is to
provide a concise and site specific Acid Sulfate Soil Management Plan. The assessment manager
must be satisfied that management plan is consistent with the eight Management Principles
documented in the Queensland Acid Sulfate Soil Technical Manual - Soil Management Guidelines
before any operational works are permitted on the site.

8.8 Excavations (e.g. trenching works) must be appropriately designed and staged to minimise
dewatering volumes and the time ASS is exposed to oxidation. Where trenches are to be excavated
through ASS materials, the applicant and construction manager must abide by the following
provisions:

(a) Trenches must only be excavated and dewatered in manageable sections such that the
works and backfilling can be completed within 5 days.

(b) Trenches must be dusted with fine agricultural lime prior to backfilling with non-ASS or
properly treated ASS materials. At least 5 kg of fine agricultural lime (98% purity or
equivalent) is to be used for every linear metre of open trench. Application rates should be
increased in larger trenches or where AASS or groundwater will be encountered.

(c) The section of trench being actively dewatered must not exceed 50 metres in length at
any given time.

(d) Suction depths for dewatering sumps and spears must not exceed 1 metre below the
invert depth of the trench.

(e) Sheet piling or similar must be used in sandy environments to prevent excessive
dewatering requirements and associated decline in local groundwater levels.

(f) Wherever practical, trenchless technologies should used when a service is to be installed
through acid sulfate soils.

8.9 Groundwater discharges from the site must not result in adverse impacts upon municipal
infrastructure (e.g. gutters and stormwater pipes) or the environment. The applicant is to detail
where pumped groundwater is to report (i.e. Stormwater) and the location where these discharges
will flow into the environment. The applicant must also provide a concise discharge plan detailing:

(a) Baseline water quality information for the groundwater to be pumped inclusive of at least
pH, EC, and Fe”* and an estimate of the likely volumes to be pumped per day

49

 

Page 3 of 5: 091217 Department of Natural Resources and Mines

Page 52

Notice
Advice Agency Response

 

(b) Water quality information from the receiving environment along with an assessment of the
receiving environments ability to absorb the proposed quantity and quality of water without
adverse impacts upon the environment.

(c) How often groundwater discharges are to be tested (e.g. daily), what tests will be
undertaken (e.g. pH, EC, Fe”) and what threshold or level constitutes a non-
conformance.

(d) What action or treatment is to occur in the event of a non-conformance (e.g. stop
pumping)

(e) Who is responsible for monitoring and reporting and who is responsible for remedial
action in the event of a non-conformance. Serious non-conformances must be reported to
the assessment manager and DNRM as the advice agency for ASS.

The assessment manager must be satisfied that an appropriate discharge plan is in place
before operational works are permitted on the site.

3. General advice to assessment manager

The State’s Native Title Work Procedures provide that responsibility for assessment of native title issues for
an IDAS application rests with the assessment manager. Therefore, DNRM as a referral agency for the
relevant application has not provided notification to native title parties.

Aboriginal Cultural Heritage

Under section 23 of the Aboriginal Cultural Heritage Act 2003 a person who carries out an activity must take
all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage
(the "cultural heritage duty of care"). Maximum penalties for breaching the duty of care are $1,000,000 for a
corporation and $100,000 for an individual. :

Applicants will comply with the duty of care in relation to Aboriginal cultural heritage if they are acting in
accordance with cultural heritage duty of care guidelines gazetted under the Aboriginal Cultural Heritage Act
2003, available on the DNRM website, or in accordance with an agreement with the Aboriginal party for the
area or a cultural heritage management plan approved under part 7 of the Aboriginal Cultural Heritage Act
2003.

Applicants are also encouraged to undertake a search of the Aboriginal Cultural Heritage Database and the
Aboriginal Cultural Heritage Register, administered by the Cultural Heritage Coordination Unit, DNRM.
Application forms to undertake a free search of the Cultural Heritage Register and the Database may be
obtained by contacting the Cultural Heritage Coordination Unit on (07) 3239 3647 or on the DNRM website

www.dnrm.gid.gov.au/cultural_heritage .

50

Page 4 of 5: 091217 Department of Natural Resources and Mines

 

Page 53

Notice
Advice Agency Response

Should you have any questions about the above, please contact Louise Henricksen on telephone (07)

41315756, quoting the above reference number.

oT as

Delegate

P Harris

Manager (Resource Assessment & Information)
Nambour — South East Region

Delegate, Chief Executive administering the Sustainable

Planning Act 2009
Department of Natural Resources and Mines

17 July 2012

Enquiries:

Jon Walton

Land Resource Officer

Department of Natural Resources and Mines
Nambour — South Region

Telephone: (07) 54512205

Email: [email protected]

51

 

Page 5 of 5+ 091217

Department of Natural Resources and Mines

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.